20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf

PDF 16 MB Posted

Attached to
Asset Protection - Electrical
Solicitation number
914-0213-26
Issued by
Tehama County, California

About this file

Summary

This document is a 100% construction submittal drawing set for sanitary sewer improvements prepared for the City of Fairfield and County of Solano in support of Phase 1 of the Fairfield Site Sanitary Sewer Improvements project, specifically the offsite sanitary sewer improvements component of the Downtown Fairfield Justice Campus Asset Protection Project. The drawings include comprehensive plans and profiles for improvements across four primary corridors: Washington Street (STA 19+00 to 25+00), Texas Street (STA 15+50 to 20+50), Clay Street, and Union Avenue with an adjacent alley (STA 9+50 to 14+50). The scope encompasses installation of approximately 266 linear feet of 15-inch sanitary sewer on Washington Street, 318 linear feet on Texas Street, and 185-396 linear feet on Union Avenue and alley sections, along with abandonment of existing 6-inch to 42-inch sanitary sewers totaling approximately 1,287 linear feet. The work includes construction of new 48-inch to 60-inch sanitary sewer manholes (SSMH 3 through SSMH 13), tie-in details to existing infrastructure, utility coordination with 8-inch and 12-inch water lines and existing storm drain crossings, erosion and sediment control measures, and dewatering provisions. The drawings are marked preliminary and not for construction, indicating this is the design development phase prior to final bid documentation.

The drawing set includes detailed trench details, manhole specifications compliant with Fairfield-Suisiun Sewer District (FSSD) and City of Fairfield standards for pipes 12 inches and larger and smaller than 12 inches respectively, erosion and sediment control notes with fiber roll installations, temporary storm drain inlet filters, and concrete washout specifications. Site staging and access plans indicate potential contractor laydown areas requiring coordination with the concurrent Solano County Downtown Fairfield Justice Campus Asset Protection Project. Utility coordination is critical, with existing water, storm drain, gas, and electrical crossings documented throughout all four corridors. The drawings were prepared with a November 2025 revision date and last revision on February 23, 2026, at 1:55 p.m., indicating recent updates to the design. No specific bid due dates, award information, or contract pricing is included in these technical drawings; this submission represents the design phase for a federally-funded project component supporting the larger Justice Campus security and asset protection initiative.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTILITY TRENCH EXCAVATION AND BACKFILL

EROSION AND SEDIMENT CONTROL NOTES

SEWER ABANDONMENT NOTES

SURVEY NOTES

DEWATERING NOTES

SEWER BYPASS NOTES

FAIRFIELD-SUISIUN SEWER DISTRICT NOTES

SHEET INDEX

SHEET NUMBER SHEET TITLE

SHEET FILES:GENERAL

G-001 COVER SHEET

G-002 GENERAL NOTES AND SHEET INDEX

G-003 SHEET INDEX KEY MAP, LEGENDS, SYMBOLS, AND

ABBREVIATIONS

G-004 ALIGNMENTS AND CONTROL

G-101 ACCESS AND STAGING PLAN

SHEET FILES: CIVIL

C-101 WASHINGTON STREET PLAN AND PROFILE

C-102 TEXAS STREET PLAN AND PROFILE

C-103 CLAY STREET PLAN AND PROFILE

C-104 UNION AVENUE AND ALLEY PLAN AND PROFILE

C-501 TYPICAL FSSD DETAILS

(FOR PIPES 12" DIAMETER OR LARGER)

C-502 TYPICAL FAIRFIELD DETAILS

(FOR PIPES LESS THAN 12" DIAMETER)

SHEET FILES: CIVIL EROSION

CE101 EROSION AND SEDIMENT CONTROL PLANS

CE501 EROSION AND SEDIMENT CONTROL DETAILS

SHEET FILES: TRAFFIC CONTROL SEE SEPARATE TRAFFIC CONTROL PLANS BY AWP SAFETY

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ G0

.dw g F eb

3,

- 1 :39 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

G-002

GE

NE

RA

L N

OT

E

AN

D

SH

EE

T

IN

DE

X

GENERAL NOTES

1.

1.

TRAFFIC CONTROL

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ G-

1_

Ac ce ss S tag ing

.dw g

F eb

3,

- 1

:43 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

G-101

AC

CE

SS

A

ND

S

TA

GI

NG

P

LA

N

CALLOUT NOTES

POTENTIAL STAGING AREA. CONTRACTOR TO

COORDINATE WITH CONTRACTOR FOR THE SOLANO

COUNTY DOWNTOWN FAIRFIELD JUSTICE CAMPUS ASSET

PROTECTION PROJECT, AND VERIFY LOCATION IN FIELD.

STAGING/LAYDOWN AREA TO BE REMOVED AFTER

CONSTRUCTON.

A

WASHINGTON STREET PLAN STA. 19+00 TO 25+00

HORIZONTAL:1"=30'

WASHINGTON STREET SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

20+00 21+00 22+00 23+00 24+00 25+00

(NIC)

BY OTHERS

36" SD

@ 0.50%

IN

V

: 5 .8

4'

6" (S

IN

V : 5

.8 4'

6"

(E

(N

IC

)S D

M H

; S

TA

: 1 9+

.0

R

IM

: 1

3.

IN

V

: 3 .2

4'

8" (N

IN

V : 5

.1 9'

W

IN

V

: 3 .2

2'

8" (S

(E X

)S S

M H

8-

2;

S

TA

: 2

1+

.3

R

IM

: 1 3.

IN

V

: 3 .7

7'

8" (N

IN

V : 1

.3 7'

2"

(W

(E X

)S S

M H

8-

1;

S

TA

: 2

3+

.4

R

IM

: 1 5.

(EX)16' of 18" SS @ 1.65%

IN

V

: 7 .3

1'

2" (W

IN

V : 4

.2 4'

8"

(N

IN

V

: 4 .0

3'

8" (S

(E X

)S S

M H

8-

0;

S

TA

: 2

4+

.2

R

IM

: 1 5.

(ABANDON EX)398' of

18" SS @ 0.25%

INV:5.84(S)

INV:3.77(N)

INV:4.03(S)

INV:3.22(S)

EX. GROUND @ ALIGNMENT CENTERLINE

APPROXIMATE DEPTH OF EX 8" WTR

ST

A:

+9

7.

E X

W

TR

T

EE

ST

A:

+0

5.

E X

W

TR

T

EE

ST

A:

+1

9.

E X

W

TR

T

EE

INV:3.24(N)

INV:3.77(S)(PLUGGED)

INV: 1.37 EX.42" SS (W)

IN

V

: 7 .8

5'

E)

IN

V

: 7 .7

3'

N

IN

V : 7

.7 4'

S)

(E X

)S S

M H

; S

TA

: 2 0+

.6

R

IM

: 1

3.

INV:7.73(N)INV:7.74(S)

INV:3.71-NEW 15" SS(N)

INV:3.60-NEW 15" SS(S)

INV:3.60-NEW 15" SS(N)

INV:3.20-NEW 15" SS(S)

IN

V

: 3 .3

7'

8" (S

IN

V : 4

.2 0'

N W

IN

V : 1

.3 7'

2"

(E &W

(N E

W )6

0' ' S

S M

H

; S

TA

: 2 3+

.4

R

IM

: 1

5.

IN

V

: 3 .6

0'

5" (S

IN

V : 5

.1 9'

W

IN

V

: 3 .6

0'

5" (N

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 1+

.1

R

IM

: 1

3.

IN

V

: 3 .7

9'

5" (E

IN

V : 3

.7 9'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 0+

.2

R

IM

: 1

3.

(ABANDON EX) 395' of 6" SS(APPROXIMATE DEPTH)

INSTALL 266 LF of 15" SS VCP @ 0.15%

(ABANDON EX)263' of 18" SS @ 0.20%

INSTALL 70 LF of

15" SS VCP @ 0.15%

(EX)18" SS

INV: 5.19' - EX 4" SS(W)

INV: 3.79-NEW 15" SS(E)

INV:3.71-NEW 15" SS(S)

INV:3.79-NEW 15" SS(N)

INSTALL 55 LF of

15" SS VCP @ 0.15%

IN

V

: 3 .7

1'

5" (S

IN

V : 4

.9 6'

E)

IN

V : 3

.7 1'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 0+

.6

R

IM

: 1

3.

IN

V

: 8 .9

N

IN

V : 7

.4 5'

2"

(E E)

(N E

W )4

8' ' S

S M

H

; S

TA

: 2 4+

.1

R

IM

: 1

5.

(ABANDON EX)

116 LF of 6" SS

INV: 9.0±-EX 6" SS

IN

V

: 6 .0

0'

0" (W

IN

V : 6

.0 0'

6"

(N

(N

IC

)C B

- 9 2;

S

TA

: 1 9+

.3

R

IM

: 1

3.

IN

V

: 7 .2

0'

S)

(N E

W )S

S C

O

0;

S

TA

: 1

9+

.8

R

IM

: 1 3.

S

S

S

S

S

S

S

S

IN

D

U C

TI

O

N L

O O

P(

TY

P)

S S

S

S

S

S

ST

A:

+9

8.

EX

. S

SM

H

ST

A:

+3

2.

EX

S

SM

H

ST

A:

+6

1.

EX

S

SM

H

ST

A:

+8

0.

N

IC

S D

M H

ST

A:

+3

2.

N

EW

8"

S

SM

H

ST

A:

+9

8.

N

EW

0"

S

SM

H

ST

A:

+1

1.

N

EW

8"

S

SM

H

ST

A:

+1

4.

EX

. S

SM

H

ST

A:

+3

1.

EX

S

SC

O

EM

PI

R E

AV

E.

TE

X A S S

TR

EE

T

20+00 21+00 22+00 23+00 24+00

C -5

16'

C -1

C -5

01 2 C -5

ST

A:

+6

1.

N

EW

8"

S

SM

H

C -5

C -5

WASHINGTON STREET

WASHINGTON STREET

ST

A:

+1

4.

N

EW

8"

S

SM

H

CALLOUT NOTES

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

W as hin gto n_ C-

1.d wg F eb

3,

- 1 :46 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-101

W

AS

HI

NG

TO

N

ST

RE

ET

PL

AN

A

ND

P

RO

FI

LE

TEXAS STREET PLAN STA. 15+50 TO 20+50

HORIZONTAL:1"=30'

TEXAS STREET SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

16+00 17+00 18+00 19+00 20+00 20+50

EX. GROUND @ ALIGNMENT CENTERLINE

(NIC)-BY OTHERS

36" SD @ 0.50%

IN

V

: 5 .8

4'

6" (S

IN

V : 5

.8 4'

6"

(E

(N

IC

)S D

M H

; S

TA

: 1 6+

.7

R

IM

: 1

3.

IN

V

: 4 .0

8'

6" (W

IN

V : 4

.0 8'

2"

(S

(N

IC

)S D

M H

; S

TA

: 1 9+

.3

R

IM

: 1

2.

INV:5.84(E)

INV:4.08(W)

ST

A:

+5

8.

E X

W

TR

T

EE

ST

A:

+1

6.

E X

W

TR

T

EE

ST

A:

+1

4.

E X

W

TR

T

EE

ST

A:

+6

1.

E X

W

TR

T

EE

ST

A:

+4

7.

E X

W

TR

T

EE

ST

A:

+9

7.

E X

W

TR

T

EE

ST

A:

+9

6.

E X

W

TR

T

EE

APPROXIMATE DEPTH OF 8" WTR

INSTALL 318 LF of 15" SS VCP @ 0.15%

IN

V

: 4 .2

6'

5" (S

E)

IN

V : 4

.2 6'

5"

(W

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 9+

.7

R

IM

: 1

2.

INV:3.79-NEW 15" SS(E)

IN

V

: 3 .7

9'

5" (E

IN

V : 3

.7 9'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 6+

.0

R

IM

: 1

3.

INV:2.93±- EX 18" SS

IN

V

: 7 .8

6'

0" (E

IN

V : 7

.9 0'

0"

(S

(E X

) S S

M H

; S

TA

: 1 9+

.4

R

IM

: 1

3.

INV:7.86(E)

INV:4.26-NEW 15" SS(W)

EX SSMH - SEE NOTE

IN

V

: 3 .7

1'

5" (S

IN

V : 4

.9 6'

E)

IN

V : 3

.7 1'

5"

(N

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 6+

.9

R

IM

: 1

3.

INSTALL 55 LF of

15" SS VCP @ 0.15%

INV:3.71-NEW 15" SS(S) INV:3.79-NEW 15" SS(N)

INSTALL 38 LF of

15" SS VCP @ 0.15%

INV:4.26-NEW 15" SS(SE) INV:4.32-NEW 15" SS(NW)

IN

V

: 4 .9

0'

S)

IN

V

: 7 .8

0'

0" (E

IN

V : 4

.3 2'

5"

(N W

(N E

W )4

8' ' S

S M

H

; S

TA

: 1 9+

.2

R

IM

: 1

3.

INV: 4.90-NEW 8" SS(S)

CALLOUT NOTES

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

Te xa s.d wg

F eb

3,

- 1

:47 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-102

TE

XA

S

ST

RE

ET

PL

AN

A

ND

P

RO

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

Cl ay

.dw g

F eb

3,

- 1

:49 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-103

CL

AY

S

TR

EE

T

PL

AN

A

ND

P

RO

10+00 11+00 12+00

EX. VAULT

SS

S

EX

S

S S

ST

A:

9+

.2

EX

S

SM

H

ST

A:

+7

5.

EX

S

SM

H

ST

A:

+8

5.

EX

S

SM

H

ST

A:

+7

5.

N

EW

4"

S

SM

H

ST

A:

9+

.0

N

EW

4"

S

SM

H

NO

PA

RK

ING

C -5

S S

C -5

11LF OF NEW 10"SS @7.4%

22'

18'

PLUG

IN MH

x x x x x x x x x x x x x x x x

10+00 11+00 12+00 13+00 14+00

EX

V A U

LT

S

S

S

S

S

S

S

S

S

S

S

S S

S

S

S

S

S

EX CURBEX CURB EX CURB

S S

ST

A:

9+

.3

EX

S

SM

H

ST

A:

+8

1.

EX

S

SM

H

ST

A:

+9

8.

EX

S

SM

H

ST

A:

+2

0.

EX

S

SC

O

ST

A:

+0

1.

EX

S

SC

O

ST

A:

+7

9.

EX

S

SC

O

ST

A:

+2

8.

EX

S

SC

O

ST

A:

+4

3.

EX

S

SC

O

ST

A:

9+

.6

N

EW

4"

S

SM

H

ST

A:

+9

2.

EX

S

SM

H

2.

4'

C C

ST

A:

9+

.0

IN

ST

AL

L

SS

M

H

NO

PARKING

NO

PARKING

C -5

C -5

21 214.

0' C

C

RADIUS=4500'

UNION AVENUE PLAN STA. 9+50 TO 12+50

HORIZONTAL:1"=30'

UNION AVENUE SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

10+00 11+00 12+00 12+50

IN

V

: 4 .8

3'

0" (W

IN

V : 4

.5 4'

0"

(N

IN

V

: 4 .8

4'

0" (S

(E X

)S S

M H

; S

TA

: 1 1+

.1

R

IM

: 1

1.

SU

M P:

4.

N

EW

IN

V:

.4

' 1 0"

(S W

SE

E N

O

TE

EX. GROUND @ ALIGNMENT CENTERLINE

IN

V

: 4 .5

5'

W

IN

V : 4

.7 4'

E)

(E X

)S S

M H

; S

TA

: 9 +9

4.

-3 0±

W

ES

T R

IM

: 9

.5 3'

IN

V

: 4 .7

7'

0" (N

IN

V : 4

.8 1'

0"

(E

(E X

)S S

M H

; S

TA

: 1 1+

.3

R

IM

: 1

1.

IN

V

: 4 .8

3'

0" (W

IN

V : 4

.5 4'

0"

(N

IN

V

: 4 .8

4'

0" (S

(E X

)S S

M H

; S

TA

: 1 1+

.1

R

IM

: 1

1.

(EX)10LF of 10" SS @ 0.71%, APPROXIMATE DEPTH OF EX 8" WTR

ST

A:

+1

1.

E X

W

TR

T

EE

APPROXIMATE DEPTH OF EX 12" HYDR

IN

V

: 2 .1

9'

0" (N

IN

V : 3

.5 0'

N W

IN

V : 2

.0 9'

0"

(E

(N E

W )5

4' ' S

S M

H

3;

S

TA

: 9

+9 0.

R

IM

: 1

0.

INV:2.70(S)-NEW 10"SS

INV:2.19(N)-NEW 10"SS

INV: 2.09

NEW 10" SS(E)

INSTALL 185LF of 10" SS @ 0.28% INSTALL 11LF of 10" SS @ 6.42%, SEE NOTE 10

IN

V

: 3 .7

0'

0" (N

E)

IN

V : 2

.7 0'

0"

(S

(N E

W )5

4' ' S

S M

H

1;

S

TA

: 1

1+

.2

R

IM

: 1 1.

INV:3.70- NEW 10"SS(NE)

INV:4.4±-NEW 10" SS(SW)

ST

A:

+5

3.

E X

S D

C R

O

SS

IN

G

ST

A:

+3

0.

E X

2"

H Y

D R

(E &W

IN

V

: 3 .7

0'

SE

IN

V : 4

.6 9'

"(W

(N E

W )5

4' ' S

S M

H

2;

S

TA

: 9

+9 4.

R

IM

: 1

0.

PLUG AND ABANDON, SEE 16

ALLEY PLAN STA. 9+50 TO 14+50

HORIZONTAL:1"=30'

ALLEY SANITARY SEWER PROFILE

HORIZONTAL:1"=30'; VERTICAL:1"=3'

10+00 11+00 12+00 13+00 14+00 14+50

IN

V

0.

' 2

4" (N

E)

IN

V

0.

' 1 8"

(N

IN

V

0.

' 2

4" (S

(E X

)S S

M H

8-

5;

S

TA

: 1

3+

.5

R

IM

: 1 1.

SU

M

P:

-0

.2 8'

N

EW

IN

V:

.8

9'

0" (W

EX. GROUND @ ALIGNMENT CENTERLINE

(EX)413LF of 8" SS @ 0.26%

IN

V

: 4 .5

5'

W

IN

V : 4

.7 4'

E)

(E X

)S S

M H

; S

TA

: 9 +6

8.

R

IM

: 9 .5

3' IN

V

: 3 .0

7'

W

IN

V : 4

.4 0'

N W

IN

V : 0

.9 0'

8"

(S

(E X

)S S

M H

8-

1;

S

TA

: 1

3+

.0

R

IM

: 1 1.

(EX)10LF of 8" @ 5.47%

INV:3.65(W)INV:4.74(E)

IN

V : 2

.1 9'

0"

(N

IN

V

: 3 .5

0'

N

W

IN

V

: 2 .0

9'

0" (E

(N E

W )5

4' ' S

S M

H

3;

S

TA

: 9

+9 6.

R

IM

: 1

0.

IN

V

0.

' 2

4" (N

E)

IN

V

0.

' 1 8"

(N

IN

V

0.

' 2

4" (S

(E X

)S S

M H

8-

5;

S

TA

: 1

3+

.5

R

IM

: 1 1.

INV: -0.28

EX 24" (S)

INV:-0.13-24"(NE)

INV: 2.19

NEW 10" SS(N)

IN

V

: 3 .6

5'

W

IN

V : 3

.6 4'

E)

(E X

)S S

M H

8-

2;

S

TA

: 1

3+

.6

R

IM

: 1 1.

ST

A:

+4

3.

E X

S S

L A

TE

R

AL

ST

A:

+0

1.

E X

S S

L A

TE

R

AL

ST

A:

+2

8.

E X

S S

L A

TE

R

AL

ST

A:

+7

9.

E X

S S

L A

TE

R

AL

ST

A:

+2

0.

E X

S S

L A

TE

R

AL

IN

V

: 3 .7

0'

SE

IN

V : 4

.6 9'

"(W

(N E

W )5

4' ' S

S M

H

2;

S

TA

: 9

+8 9.

R

IM

: 1

0.

INSTALL 9LF of

8" SS @ 2.29%

E X

" S

S C

R O

SS

IN

G A

P P

R O

X . D

EP

TH

E X

" S

ID

W

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

E

X S

D C

R O

SS

IN

G A

P P

R O

X . D

EP

TH

E X

" W

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

E

X.

G

A S

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

E X

E

LE

C C

R O

SS

IN

G A

P P

R O

X . D

EP

TH

E X

" W

C R

O

SS

IN

G

A P

P R

O X

. D

EP

TH

INV:3.50 NEW 8"SS(NW)

INV:3.70 NEW 8"SS(SE) INV:2.09(E)-NEW 10"SS

INV:0.89(W)-NEW 10"SS

INSTALL 396 LF of 10" SS @ R=4500' @ 0.30%

20 20 20 20 20

CALLOUT NOTES

CALLOUT NOTES

CALLOUT NOTES

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\2

8-

_P lan Pr ofi le_

Un ion

Al ley

.dw g

F eb

3,

- 1

:51 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-104

UN

IO

N

AV

EN

UE

A

ND

A

LL

EY

PL

AN

A

ND

P

RO

FI

LE

D

EL

AW

AR

E

ST

R

EE

T

A

LL

EY

U N

IO

N

A

VE

N U

E C -1

C -1

(ID/12)SEE NOTE 7

3"

3' -0

" F O

R

' I D

M H

UNDISTURBED EARTH

(M

IN

6"

(T

YP

(M

AX

FL

O

W

M

AX

PIPE ID

5'-8" (MIN) FOR 4'-0"Ø MH

6'-10" (MIN) FOR 5'-0"Ø MH

4"

3" (M

IN

(T

YP

6"

(TYP)

(MIN)

PR

EC

AS

T

EC

C

EN

TR

IC

C

O N

E

3' -0

" M

IN

F O

R

' I D

M H

4' -0

" M

IN

F O

R

' I D

M H

6" 9"

" M

IN

" M

AX

24"

D

IR

EC

TI

O N

FL

O

W D

IR

EC

TI

O

N

PRECAST FLOW

CHANNEL

PRECAST MANHOLE

BASE

SPIGOT X SPIGOT STICK

CAST IN BELLS

(TYP EACH PIPE)

PRECAST BASE RING

ALL SHELF AREAS

SHALL BE SLOPED

TOWARDS THE

FLOW CHANNEL

CAST IN BELL FOR

INCOMING PIPE

BELL X SPIGOT STICK

SLOPE

(ID/12)

(MIN)

GROUT AROUND

BELLS (TYP)

MANHOLE THROAT

LOCATION OR AS

DIRECTED BY DISTRICT

2 TYPICAL MANHOLE DETAILS

N.T.S.

TEXAS STREET

C

LA

Y

ST

R

EE

T TE

MP.

B

YP

AS

S

NIC 36"SD

N

IC

2"

S D

PR

"S S

EX

0" S S

EX 10"SS

REMOVE EX SSMH

PR 15"SS

NEW 48" SSMH 3

NEW SDMH(NIC)

EX

PL

U

G G

ED

S

S

4 MANHOLE 3 LAYOUT

N.T.S.

PLAN VIEW

PROFILE VIEW

5 MANHOLE 6 DETAIL

N.T.S.

(NEW) 60" SSMH

(EX) SSMH U18-403

TO BE ABANDONED

3 MANHOLE 7 DETAIL

N.T.S.

(NEW) 60" SSMH TO BE ABANDONED

PI

PE

Z O

N E

3 4" C

LE

AN

C R

U

SH

ED

R

O C

K

PI

PE

O D

6"

PIPE OD+24" (MAX)

12" (MIN)

TR

EN

C H

Z O

N E

COARSE BEDDING MATERIAL

WRAPPED IN GEOTEXTILE

FABRIC, PER GEOTECHNICAL

ENGINEER'S RECOMMENDATION

OVER-EXCAVATION,

SEE NOTE 8

1 SEWER DISTRICT TRENCH DETAIL

N.T.S.

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ De tai ls.

dw g

F eb

3,

- 1

:52 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-501

TY

PI

CA

L F

SS

D

DE

TA

ILS

FO

R

PI

PE

S

" D

IA

M

ET

ER

O R

GR

EA

TE

R

6 LEVEE MANHOLE DETAIL

N.T.S.

9 SSMH 12 &13 TIE-IN DETAIL

N.T.S.8 SSMH 11 TIE-IN DETAIL

N.T.S.7 SSMH 4848-155 TIE-IN DETAIL

N.T.S.

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ De tai ls.

dw g

F eb

3,

- 1

:53 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

C-502

TY

PI

CA

L F

AI

RF

IE

LD

D

ET

AI

LS

FO

R

PI

PE

S

LE

SS

T

HA

N

" D

IA

ME

TE

R

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Er os ion

C on tro l.d wg F eb

3,

- 1 :55 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

EROSION & SEDIMENT CONTROL NOTES

CE101

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

P

LA

N

A A

4 F

EE

T

MA

X.

4 F

EE

T

MA

X.

IN

CH

M

AX

IN

CH

M

IN

IN

CH

MI

N.

SECTION A-A

TYPICAL FIBER ROLL INSTALLATION

CONSTRUCTION

SITE

OFF-SITE

NOTES:

1. INSTALL FIBER ROLLS IN A ROW ALONG A LEVEL

CONTOUR.

2. AT ENDS OF A ROW TURN THE LAST TWO FEET UP

SLOPE SLIGHTLY.

3. FIBER ROLLS SHALL BE BUTTED TIGHTLY AT THE

JOINTS.

4. DO NOT OVERLAP JOINTS.

FLOW

FIBER ROLL

8 INCH MIN.

SLOPEVARIES

INSTALL A FIBER ROLL

NEAR SLOPE WHERE

IT TRANSITIONS INTO A

STEEPER SLOPE

3/4 IN. X 3/4 IN.

WOOD STAKES MAX.

4 FT. SPACING

1 TEMPORARY STORM DRAIN INLET FILTERS

N.T.S.

2 TEMPORARY FIBER ROLLS

N.T.S.

THIS SECTION REMOVED FOR

GRAPHICAL REPRESENTATION

ONLY. STRAW BALE PERIMETER

SHALL BE CONTINUOUS.

BALE CONFIGURATION

SECTION A - A

NOTES:

1. FACE SIGN TOWARD NEAREST

STREET OR ACCESS POINT.

2. CONCRETE WASHOUT SHALL BE

LOCATED BEHIND THE CURB

AND 50 FT. MINIMUM FROM

DRAINAGE INLETS OR

WATERCOURSES.

14" MIN

' M

IN

TY

P

OF

S

ID

ES

1" M

IN

A

" M

IN

A

" M

IN

STRAW BALES

60 MIL

POLYETHYLENE

2" X 2"

STAKES OF #4 J-BARS

2 PER BALE TYPE

STRAW BALES

3 CONCRETE WASHOUT

N.T.S.

RE

VI

SI

ON

S

DA

TE

DR

AW

N

BY

CH

EC

KE

D

BY

SI

GN

AT

UR

E

BL

OC

K

OF

CE

R

NO

VE

M

BE

R

FI

LE

L O

C

AT

IO

N

LA

ST

R

EV

IS

IO

N

:S:

\P ro jec ts\

\2

8-

\3_ Dr aw ing s\I mp ro ve m en t P lan

\25

-0

0_ Er os ion

C on tro l.d wg F eb

3,

- 1 :55 pm

SO

LA

NO

C

O

UN

TY

DO

W

NT

O W

N

FA

IR

FI

EL

D

JU

ST

IC

E

CA

M

PU

S

FA

IR

FI

EL

D L

AW

a nd J

U

ST

IC

E

CA

M

PU

S

SE

CU

RI

TY

P

RO

JE

CT

R

EV

D

AT

E

BY

D

ES

C R

IP

TI

O N

PRELIM

INARY

NOT FOR

CONSTRUCTION

PH

AS

E

OF

FS

IT

E

SA

NI

TA

RY

S

EW

ER

IM

PR

OV

EM

EN

TS

CI

TY

O

F

FA

IR

FI

EL

D

- C

OU

NT

Y

OF

S

OL

AN

O

CE501

ER

OS

IO

N

AN

D

SE

DI

ME

NT

C

ON

TR

OL

D

ET

AI

LS

File details come from the government source that posted it. Updated .