20260119_Asset_Protection_Project_Schedule.pdf
PDF 2 MB Posted
- Attached to
- Asset Protection - Electrical
- Solicitation number
- 914-0213-26
- Issued by
- Tehama County, California
About this file
This is a project schedule document for the Solano County Asset Protection Project, a multi-phase flood protection initiative spanning from November 2025 through January 2027. The project encompasses comprehensive infrastructure improvements across multiple County-owned properties including barrier walls, berms, landscaping, storm drainage systems, pump vaults, electrical systems, irrigation, and underground utility reconfiguration. The schedule establishes a Notice to Proceed (NTP) on November 12, 2025, with construction commencing March 2, 2026. The project is organized into ten phased work areas plus closeout activities, with substantial completion scheduled for November 25, 2026, and final project completion on January 12, 2027. Individual phases include work on Union Avenue, Clay Street, Texas Street, Delaware Street, and various parking and landscape areas, each with detailed task sequences covering utility markouts, site preparation, excavation, infrastructure installation, electrical and mechanical systems integration, hardscape placement, and final restoration. Interim milestones are distributed throughout the construction period, with Phase 1 completion by July 25, 2026, and subsequent phases completing sequentially through November 2026.
The schedule identifies critical procurement lead times for pump and vault components, with long-lead items for pumps, electrical controls, and vault materials extending through July 2026 to support installation activities in the later project phases. The design phase was completed by December 11, 2025, followed by city abandonment coordination through February 6, 2026, and permit approval by February 27, 2026. The bid and award process occurred between January 19 and March 27, 2026, with a Notice to Proceed issued February 26, 2026. The project is federally funded through OES/FEMA Hazard Mitigation Assistance grants, requiring compliance with federal procurement standards and FEMA contractual requirements. Construction phasing is strategically sequenced to minimize operational disruption at active County facilities, with coordinated work on storm drainage, electrical infrastructure, security fencing and access control systems, and landscaping integrated across all project sites to achieve the November 2026 substantial completion target.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Activity ID Activity Name Start Finish
Solano County Asset Protection - County ReviewSolano County Asset Protection - County Review 11-12-25 01-12-27
MILESTONESMILESTONES 11-12-25 01-12-27
MILE-10 NTP 11-12-25
MILE-250 Construction Start 03-02-26
LOE-100 Phase 1 Level of Effort 03-30-26 07-24-26
LOE-140 Phase 5 Level of Effort 03-30-26 06-19-26
LOE-150 Phase 4 Level of Effort 03-30-26 07-08-26
LOE-160 Phase 6 Level of Effort 03-30-26 10-01-26
LOE-170 Phase 2 Level of Effort 03-30-26 09-14-26
LOE-180 Phase 9 Level of Effort 03-30-26 11-25-26
LOE-190 Phase 3 Level of Effort 03-30-26 10-02-26
MILE-110 Phase 6C Completion 05-28-26
MILE-150 Phase 5 Completion 06-19-26
MILE-140 Phase 6A Completion 06-29-26
MILE-130 Phase 4 Completion 07-08-26
MILE-190 Phase 1 Completion 07-25-26
LOE-110 Phase 7 Level of Effort 08-24-26 11-09-26
LOE-120 Phase 8 Level of Effort 08-24-26 11-13-26
LOE-130 Phase 10 Level of Effort 09-03-26 11-25-26
MILE-220 Phase 2 Completion 09-14-26
MILE-200 Phase 6 Completion 10-01-26
MILE-210 Phase 6B Completion 10-01-26
MILE-160 Phase 3 Completion 10-02-26
MILE-170 Phase 7 Completion 11-09-26
MILE-100 Phase 8 Completion 11-13-26
MILE-180 Phase 10 Completion 11-25-26
MILE-120 Phase 9 Completion 11-25-26
MILE-240 Substantial Completion 11-25-26*
MILE-230 Project Completion 01-12-27
Asset Protection - FEMAAsset Protection - FEMA 11-12-25 01-12-27
DesignDesign 11-12-25 02-27-26
DESIGN-100 Design Completion 11-12-25 12-11-25
DESIGN-110 City Abandonment 12-12-25 02-06-26
DESIGN-120 Permit Approval 02-09-26 02-27-26
AwardsAwards 11-12-25 03-27-26
AWARD-100 Draft Bid Packages 11-12-25 01-09-26
AWARD-110 County Review and Approval of Bid Packages 01-12-26 01-16-26
AWARD-120 Bid Period 01-19-26 02-13-26
AWARD-130 Unseal of Bid and NOI 02-16-26 02-18-26
AWARD-140 Bid Protest Period 02-19-26 02-25-26
AWARD-150 NTP 02-26-26 02-26-26
AWARD-160 Submittals and Review Period 02-27-26 03-26-26
AWARD-170 COI 03-27-26 03-27-26
ProcurementProcurement 11-12-25 07-24-26
PRO-100 Front End Development for Pumps and Vaults 11-12-25 02-09-26
PRO-110 Long Lead Pump Submittals and Review 02-10-26 03-23-26
PRO-140 Pump Lead Time 03-24-26 07-24-26
PRO-130 Pump Vault Lead Time 03-24-26 05-04-26
PRO-150 Pumps/Electrical/Controls Lead Time 03-24-26 07-24-26
ConstructionConstruction 03-28-26 11-25-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
NTP
Construction Start
Phase 1 Level of Effort
Phase 5 Level of Effort
Phase 4 Level of Effort
Phase 6 Level of Effort
Phase 2 Level of Effort
Phase 9 Level of Effort
Phase 3 Level of Effort
Phase 6C Completion
Phase 5 Completion
Phase 6A Completion
Phase 4 Completion
Phase 1 Completion
Phase 7 Level of Effort
Phase 8 Level of Effort
Phase 10 Level of Effort
Phase 2 Completion
Phase 6 Completion
Phase 6B Completion
Phase 3 Completion
Phase 7 Completion
Phase 8 Completion
Phase 10 Completion
Phase 9 Completion
Substantial Completion
Project Completion
Design Completion
City Abandonment
Permit Approval
Draft Bid Packages
County Review and Approval of Bid Packages
Bid Period
Unseal of Bid and NOI
Bid Protest Period
NTP
Submittals and Review Period
COI
Front End Development for Pumps and Vaults
Long Lead Pump Submittals and Review
Pump Lead Time
Pump Vault Lead Time
Pumps/Electrical/Controls Lead Time
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
Solano County Asset Protection - County Review
Full Schedule
Phased WorkPhased Work 03-28-26 11-25-26
Phase 1 03-28-26 07-25-26
P1-CON-100 Call 811 and Markout Utilities 03-28-26 03-31-26
P1-CON-110 Setup Construction Fencing and Barriers 04-01-26 04-06-26
P1-CON-120 Setup Temporary Access 04-01-26 04-06-26
P1-CON-130 Setup SWPPP 04-07-26 04-11-26
P1-CON-140 Clear and Grub from 00+00 to 05+00 04-13-26 04-18-26
P1-CON-150 Cap Off Utilities and Irrigation Lines 04-20-26 04-21-26
P1-CON-160 Demo Existing Sidewalk 04-22-26 04-27-26
P1-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-28-26 05-08-26
P1-CON-180 Rough Grade From 00+00 to 01+75 05-09-26 05-14-26
P1-CON-190 Rough Grade From 01+75 to 05+52 05-15-26 05-20-26
P1-CON-200 Install New Storm Drainage Lines and Basins 05-21-26 06-02-26
P1-CON-210 Fine Grade and Build Berm 06-03-26 06-25-26
P1-CON-220 Install Irrigatiion Mains 06-26-26 07-03-26
P1-CON-230 Install Irrigation Branches 07-06-26 07-08-26
P1-CON-240 Form and Pour Mow Bands at Berm 07-06-26 07-10-26
P1-CON-250 Install Landscaping 07-11-26 07-22-26
P1-CON-260 Remove Construction Fencing and Barriers 07-23-26 07-25-26
Phase 2Phase 2 03-28-26 09-14-26
Clay StreetClay Street 03-28-26 09-14-26
P2-CON-CLAY-100 Call 811 and Markout Utilities 03-28-26 03-28-26
P2-CON-CLAY-110 Setup Construction Fencing and Barriers 03-30-26 04-02-26
P2-CON-CLAY-120 Setup Road Closure 03-30-26 03-31-26
P2-CON-CLAY-130 Setup SWPPP 04-03-26 04-04-26
P2-CON-CLAY-140 Clear and Grub 04-06-26 04-07-26
P2-CON-CLAY-150 Demo Existing Pavement and Sidewalk 04-08-26 04-18-26
P2-CON-CLAY-160 Excavate and Remove Storm Drain Pipes and Basin 04-20-26 04-24-26
P2-CON-CLAY-170 Setup Dewatering 04-20-26 04-22-26
P2-CON-CLAY-180 Rough Grade 04-25-26 04-30-26
P2-CON-CLAY-190 Install New Storm Drainage Lines and Basins 05-01-26 05-23-26
P2-CON-CLAY-200 Excavate Retaining Wall Footings and Flood Gate 05-01-26 05-08-26
P2-CON-CLAY-210 Install New Sewer Line (Add Alt) 05-01-26 05-23-26
P2-CON-CLAY-220 Install Retaining Wall Footings and Flood Gate 05-09-26 05-16-26
P2-CON-CLAY-230 Backfill Retaining Wall Footings and Form Retaining Walls 05-09-26 05-18-26
P2-CON-CLAY-240 Inspect Underground Utilities 05-26-26 05-27-26
P2-CON-CLAY-250 Backfill Storm Drain Trenches Backfill to Grade 05-28-26 06-08-26
P2-CON-CLAY-260 Trench for Electrical 06-09-26 06-13-26
P2-CON-CLAY-270 Install Underground Conduits 06-15-26 06-19-26
P2-CON-CLAY-280 Inspect Underground Electrical 06-20-26 06-22-26
P2-CON-CLAY-290 Backfill Electrical Trench 06-23-26 06-29-26
P2-CON-CLAY-300 Complete Fine Grade 06-30-26 07-14-26
P2-CON-CLAY-310 Pour Retaining Walls 06-30-26 07-01-26
P2-CON-CLAY-320 Form and Pour Curbs 07-15-26 07-28-26
P2-CON-CLAY-330 Pull Electrical 07-15-26 07-20-26
P2-CON-CLAY-340 Form and Pour Sidewalks 07-29-26 08-08-26
P2-CON-CLAY-350 Place AC Pavement 08-28-26 09-03-26
P2-CON-CLAY-360 Paint Striping 09-03-26 09-08-26
P2-CON-CLAY-370 Install Signage 09-03-26 09-10-26
P2-CON-CLAY-380 Remove Construction Fencing and Barriers 09-10-26 09-14-26
Texas StreetTexas Street 03-28-26 07-10-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub from 00+00 to 05+00
Cap Off Utilities and Irrigation Lines
Demo Existing Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Rough Grade From 00+00 to 01+75
Rough Grade From 01+75 to 05+52
Install New Storm Drainage Lines and Basins
Fine Grade and Build Berm
Install Irrigatiion Mains
Install Irrigation Branches
Form and Pour Mow Bands at Berm
Install Landscaping
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Road Closure
Setup SWPPP
Clear and Grub
Demo Existing Pavement and Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Setup Dewatering
Rough Grade
Install New Storm Drainage Lines and Basins
Excavate Retaining Wall Footings and Flood Gate
Install New Sewer Line (Add Alt)
Install Retaining Wall Footings and Flood Gate
Backfill Retaining Wall Footings and Form Retaining Walls
Inspect Underground Utilities
Backfill Storm Drain Trenches Backfill to Grade
Trench for Electrical
Install Underground Conduits
Inspect Underground Electrical
Backfill Electrical Trench
Complete Fine Grade
Pour Retaining Walls
Form and Pour Curbs
Pull Electrical
Form and Pour Sidewalks
Place AC Pavement
Paint Striping
Install Signage
Remove Construction Fencing and Barriers
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
Storm DrainStorm Drain 03-28-26 05-22-26
P2-CON-TEXAS-100Call 811 and Markout Utilities 03-28-26 04-01-26
P2-CON-TEXAS-110Setup Construction Fencing and Barriers 04-02-26 04-02-26
P2-CON-TEXAS-120Setup Temporary Access 04-02-26 04-02-26
P2-CON-TEXAS-130Setup SWPPP 04-03-26 04-03-26
P2-CON-TEXAS-140Clear and Grub 04-04-26 04-06-26
P2-CON-TEXAS-150Demo Existing Pavement 04-07-26 04-09-26
P2-CON-TEXAS-160Excavate and Remove Storm Drain Pipes and Basin 04-10-26 04-15-26
P2-CON-TEXAS-170Setup Dewatering 04-10-26 04-10-26
P2-CON-TEXAS-180Rough Grade 04-16-26 04-17-26
P2-CON-TEXAS-190Install New Storm Drainage Lines and Basins 04-18-26 05-01-26
P2-CON-TEXAS-200Backfill Storm Drain Trenches and Fine Grade 05-02-26 05-13-26
P2-CON-TEXAS-210Complete Fine Grade 05-14-26 05-15-26
P2-CON-TEXAS-220Place AC Pavement 05-16-26 05-18-26
P2-CON-TEXAS-230Paint Striping 05-19-26 05-20-26
P2-CON-TEXAS-240Install Signage 05-19-26 05-20-26
P2-CON-TEXAS-250Remove Construction Fencing and Barriers 05-21-26 05-22-26
Sewer (Add ALT)Sewer (Add ALT) 05-23-26 07-10-26
P2-CON-TEXAS-260Setup Construction Fencing and Barriers 05-23-26 05-23-26
P2-CON-TEXAS-270Setup Temporary Access 05-23-26 05-23-26
P2-CON-TEXAS-280Setup SWPPP 05-26-26 05-26-26
P2-CON-TEXAS-290Demo Existing Pavement 05-27-26 05-29-26
P2-CON-TEXAS-300Excavate and Remove New Sewer Line (Add Alt) 05-30-26 06-04-26
P2-CON-TEXAS-310Setup Dewatering 05-30-26 05-30-26
P2-CON-TEXAS-320Rough Grade 06-05-26 06-06-26
P2-CON-TEXAS-330Install New Sewer Line (Add Alt) 06-08-26 06-30-26
P2-CON-TEXAS-340Complete Fine Grade 07-01-26 07-02-26
P2-CON-TEXAS-350Place AC Pavement 07-03-26 07-06-26
P2-CON-TEXAS-360Paint Striping 07-07-26 07-08-26
P2-CON-TEXAS-370Install Signage 07-07-26 07-08-26
P2-CON-TEXAS-380Remove Construction Fencing and Barriers 07-09-26 07-10-26
Phase 3Phase 3 03-28-26 10-02-26
P3-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26
P3-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-07-26
P3-CON-120 Setup Temporary Access 04-02-26 04-04-26
P3-CON-130 Setup SWPPP 04-08-26 04-09-26
P3-CON-140 Cap Off Utilities and Irrigation Lines 04-10-26 04-11-26
P3-CON-150 Demo Existing Pavement and Sidewalk 04-13-26 04-23-26
P3-CON-160 Rough Grade 04-24-26 04-29-26
P3-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-30-26 05-05-26
P3-CON-180 Install New Storm Drainage Lines and Basins 05-06-26 05-22-26
P3-CON-190 Backfill Storm Drain Trenches and to Grade 05-23-26 06-04-26
P3-CON-200 Trench for Shallow Underground Electrical 06-05-26 06-12-26
P3-CON-210 Excavate Retaining Wall Footings and Flood Gate 06-05-26 06-12-26
P3-CON-220 Install Underground Electrical Conduit 06-13-26 06-18-26
CLOS-CON-120 Install Retaining Wall Footings and Flood Gate 06-13-26 06-20-26
P3-CON-250 Backfill Electrical Trench to Grade 06-19-26 06-30-26
P3-CON-260 Pull Electrical Wire 06-19-26 07-02-26
P3-CON-270 Install Irrigations Mains 06-19-26 06-26-26
P3-CON-240 Backfill Retaining Wall Footings and Form Retaining Walls 06-22-26 06-30-26
P3-CON-290 Install Irrigation Branches 06-27-26 07-09-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Demo Existing Pavement
Excavate and Remove Storm Drain Pipes and Basin
Setup Dewatering
Rough Grade
Install New Storm Drainage Lines and Basins
Backfill Storm Drain Trenches and Fine Grade
Complete Fine Grade
Place AC Pavement
Paint Striping
Install Signage
Remove Construction Fencing and Barriers
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Demo Existing Pavement
Excavate and Remove New Sewer Line (Add Alt)
Setup Dewatering
Rough Grade
Install New Sewer Line (Add Alt)
Complete Fine Grade
Place AC Pavement
Paint Striping
Install Signage
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Rough Grade
Excavate and Remove Storm Drain Pipes and Basin
Install New Storm Drainage Lines and Basins
Backfill Storm Drain Trenches and to Grade
Trench for Shallow Underground Electrical
Excavate Retaining Wall Footings and Flood Gate
Install Underground Electrical Conduit
Install Retaining Wall Footings and Flood Gate
Backfill Electrical Trench to Grade
Pull Electrical Wire
Install Irrigations Mains
Backfill Retaining Wall Footings and Form Retaining Walls
Install Irrigation Branches
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P3-CON-280 Complete Fine Grade 07-01-26 07-07-26
P3-CON-300 Form and Pour Curbs 07-08-26 07-18-26
P3-CON-310 Form and Pour Sidewalks 07-20-26 07-30-26
P3-CON-320 Set Fence Pole Bases and Poles 07-20-26 07-30-26
P3-CON-330 Excavate for Light Pole Bases 07-20-26 07-24-26
P3-CON-340 Set Cages and Finish Conduit 07-25-26 07-30-26
P3-CON-350 Install Fencing 07-31-26 08-08-26
P3-CON-360 Form and Pour Light Pole Bases 07-31-26 08-10-26
P3-CON-370 Set Light Poles 08-11-26 08-15-26
P3-CON-380 Place AC Pavement 08-17-26 08-22-26
P3-CON-390 Pull Wire for Security 08-24-26 08-27-26
P3-CON-400 Install Landscaping 08-28-26 09-04-26
P3-CON-410 Install Vehicle Gates and Card Readers 08-28-26 09-04-26
P3-CON-420 Paint Parking Striping 09-05-26 09-17-26
P3-CON-430 Set Wheel Stops 09-18-26 09-29-26
P3-CON-440 Remove Construction Fencing and Barriers 09-30-26 10-02-26
Phase 4Phase 4 03-28-26 07-08-26
P4-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26
P4-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-02-26
P4-CON-120 Setup Temporary Access 04-02-26 04-02-26
P4-CON-130 Setup SWPPP 04-03-26 04-03-26
P4-CON-140 Clear and Grub 04-04-26 04-06-26
P4-CON-150 Cap Off Utilities and Irrigation Lines 04-07-26 04-08-26
P4-CON-160 Demo Existing Pavement and Sidewalk 04-09-26 04-11-26
P4-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-13-26 04-15-26
P4-CON-180 Rough Grade 04-16-26 04-17-26
P4-CON-190 Install New Storm Drainage Lines and Basins 04-18-26 04-21-26
P4-CON-200 Trench for Electrical for Gate 04-18-26 04-18-26
P4-CON-210 Install Electrical Conduit for Electrical for Gate 04-20-26 04-22-26
P4-CON-220 Backfill Storm Drain Trenches and Fine Grade 04-22-26 05-02-26
P4-CON-230 Install Footing for Retaining Wall and Fencing 04-23-26 04-30-26
P4-CON-240 Trench for Electrical 05-04-26 05-05-26
P4-CON-250 Install Underground Electrical Conduit 05-06-26 05-07-26
P4-CON-260 Install Irrigations Mains 05-06-26 05-08-26
P4-CON-270 Backfill Electrical Trench 05-08-26 05-12-26
P4-CON-280 Complete Fine Grade 05-13-26 05-14-26
P4-CON-290 Form and Pour Perimeter Fencing Posts 05-13-26 05-18-26
P4-CON-300 Form and Pour Curbs 05-19-26 05-30-26
P4-CON-310 Set Lightpoles Bases, Light Poles and Bollards 06-01-26 06-03-26
P4-CON-320 Form and Pour Sidewalks 06-04-26 06-15-26
P4-CON-330 Place AC Pavement 06-16-26 06-17-26
P4-CON-340 Pull Electrical Wire and Security Wire 06-16-26 06-17-26
P4-CON-350 Paint Parking Striping 06-18-26 06-22-26
P4-CON-360 Install Landscaping 06-18-26 06-22-26
P4-CON-370 Pull Wire for Lights and Security 06-18-26 06-19-26
P4-CON-380 Install Security Fencing and Gates 06-23-26 07-03-26
P4-CON-390 Install Irrigation Branches 06-23-26 06-24-26
P4-CON-400 Set Wheel Stops 06-25-26 06-29-26
P4-CON-410 Install Card Readers 07-06-26 07-07-26
P4-CON-420 Remove Construction Fencing and Barriers 07-08-26 07-08-26
Phase 5Phase 5 03-28-26 06-19-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Complete Fine Grade
Form and Pour Curbs
Form and Pour Sidewalks
Set Fence Pole Bases and Poles
Excavate for Light Pole Bases
Set Cages and Finish Conduit
Install Fencing
Form and Pour Light Pole Bases
Set Light Poles
Place AC Pavement
Pull Wire for Security
Install Landscaping
Install Vehicle Gates and Card Readers
Paint Parking Striping
Set Wheel Stops
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Rough Grade
Install New Storm Drainage Lines and Basins
Trench for Electrical for Gate
Install Electrical Conduit for Electrical for Gate
Backfill Storm Drain Trenches and Fine Grade
Install Footing for Retaining Wall and Fencing
Trench for Electrical
Install Underground Electrical Conduit
Install Irrigations Mains
Backfill Electrical Trench
Complete Fine Grade
Form and Pour Perimeter Fencing Posts
Form and Pour Curbs
Set Lightpoles Bases, Light Poles and Bollards
Form and Pour Sidewalks
Place AC Pavement
Pull Electrical Wire and Security Wire
Paint Parking Striping
Install Landscaping
Pull Wire for Lights and Security
Install Security Fencing and Gates
Install Irrigation Branches
Set Wheel Stops
Install Card Readers
Remove Construction Fencing and Barriers
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P5-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26
P5-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-02-26
P5-CON-120 Setup Temporary Access 04-02-26 04-02-26
P5-CON-130 Setup SWPPP 04-03-26 04-03-26
P5-CON-140 Clear and Grub 04-04-26 04-06-26
P5-CON-150 Cap Off Utilities and Irrigation Lines 04-07-26 04-08-26
P5-CON-160 Demo Existing Pavement and Sidewalk 04-09-26 04-11-26
P5-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-13-26 04-17-26
P5-CON-180 Rough Grade 04-18-26 04-21-26
P5-CON-190 Install New Storm Drainage Lines and Basins 04-22-26 04-27-26
P5-CON-200 Backfill Storm Drain Trenches and Fine Grade 04-28-26 05-08-26
P5-CON-210 Trench for Electrical 05-09-26 05-14-26
P5-CON-220 Install Underground Electrical Conduit 05-15-26 05-18-26
P5-CON-230 Install Irrigations Mains 05-15-26 05-18-26
P5-CON-240 Backfill Electrical Trench 05-19-26 05-21-26
P5-CON-250 Complete Fine Grade 05-22-26 05-23-26
P5-CON-260 Form and Pour Curbs 05-26-26 06-02-26
P5-CON-270 Form and Pour Sidewalks 06-03-26 06-09-26
P5-CON-280 Place AC Pavement 06-10-26 06-11-26
P5-CON-290 Paint Parking Striping 06-12-26 06-13-26
P5-CON-300 Install Landscaping 06-12-26 06-12-26
P5-CON-310 Pull Wire and Makeup for Lights and Security 06-12-26 06-16-26
P5-CON-320 Install Irrigation Branches 06-15-26 06-15-26
P5-CON-330 Set Wheel Stops 06-16-26 06-17-26
P5-CON-340 Remove Construction Fencing and Barriers 06-18-26 06-19-26
Phase 6Phase 6 03-28-26 10-01-26
Phase 6A North Oval and PlatformPhase 6A North Oval and Platform 03-28-26 06-29-26
P6A-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26
P6A-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-07-26
P6A-CON-120 Setup Temporary Access 04-02-26 04-07-26
P6A-CON-130 Setup SWPPP 04-08-26 04-08-26
P6A-CON-140 Clear and Grub 04-09-26 04-10-26
P6A-CON-150 Cap Off Utilities and Irrigation Lines 04-11-26 04-13-26
P6A-CON-160 Demo Existing Pavement and Sidewalk 04-14-26 04-16-26
P6A-CON-170 Rough Grade 04-17-26 04-22-26
P6A-CON-180 Trench for Electrical 04-23-26 04-24-26
P6A-CON-190 Install Underground Electrical Conduit 04-25-26 04-27-26
P6A-CON-200 Set Pull and Junction Boxes 04-28-26 04-30-26
P6A-CON-210 Backfill Electrical Trench 05-01-26 05-05-26
P6A-CON-220 Set Lightpoles Bases, Light Poles and Bollards 05-06-26 05-07-26
P6A-CON-230 Trench and Install Storm Drain Line 05-06-26 05-08-26
P6A-CON-240 Install Irrigations Mains 05-08-26 05-09-26
P6A-CON-250 Backfill Storm Drain Line 05-09-26 05-11-26
P6A-CON-260 Form and Pour Curbs 05-11-26 05-21-26
P6A-CON-270 Form and Pour Foundations for Stairs and Walls 05-12-26 05-22-26
P6A-CON-280 Form and Pour Slab 05-22-26 06-03-26
P6A-CON-290 Backfill Foundations 05-23-26 05-28-26
P6A-CON-300 Form and Pour Stairs 05-29-26 06-05-26
P6A-CON-310 Fine Grade Site 06-04-26 06-05-26
P6A-CON-320 Form and Pour Sidewalks 06-06-26 06-12-26
P6A-CON-330 Pull Wire and Makeup for Lights and Security 06-13-26 06-16-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Rough Grade
Install New Storm Drainage Lines and Basins
Backfill Storm Drain Trenches and Fine Grade
Trench for Electrical
Install Underground Electrical Conduit
Install Irrigations Mains
Backfill Electrical Trench
Complete Fine Grade
Form and Pour Curbs
Form and Pour Sidewalks
Place AC Pavement
Paint Parking Striping
Install Landscaping
Pull Wire and Makeup for Lights and Security
Install Irrigation Branches
Set Wheel Stops
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Rough Grade
Trench for Electrical
Install Underground Electrical Conduit
Set Pull and Junction Boxes
Backfill Electrical Trench
Set Lightpoles Bases, Light Poles and Bollards
Trench and Install Storm Drain Line
Install Irrigations Mains
Backfill Storm Drain Line
Form and Pour Curbs
Form and Pour Foundations for Stairs and Walls
Form and Pour Slab
Backfill Foundations
Form and Pour Stairs
Fine Grade Site
Form and Pour Sidewalks
Pull Wire and Makeup for Lights and Security
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P6A-CON-340 Install Pre-Fab Seats 06-13-26 06-16-26
P6A-CON-350 Install Landscaping 06-17-26 06-22-26
P6A-CON-360 Install Irrigation Branches 06-23-26 06-25-26
P6A-CON-370 Remove Construction Fencing and Barriers 06-26-26 06-29-26
Phase 6B South OvalPhase 6B South Oval 06-30-26 10-01-26
P6B-CON-100 Setup Construction Fencing and Barriers 06-30-26 07-02-26
P6B-CON-110 Setup Temporary Access 07-03-26 07-09-26
P6B-CON-120 Setup SWPPP 07-10-26 07-10-26
P6B-CON-130 Clear and Grub 07-11-26 07-13-26
P6B-CON-140 Cap Off Utilities and Irrigation Lines 07-14-26 07-15-26
P6B-CON-150 Demo Existing Pavement and Sidewalk 07-16-26 07-18-26
P6B-CON-160 Rough Grade 07-20-26 07-30-26
P6B-CON-170 Trench for Electrical 07-31-26 08-03-26
P6B-CON-180 Install Underground Electrical Conduit 08-04-26 08-06-26
P6B-CON-190 Set Pull and Junction Boxes 08-07-26 08-08-26
P6B-CON-200 Backfill Electrical Trench 08-10-26 08-13-26
P6B-CON-210 Set Lightpoles Bases, Light Poles and Bollards 08-14-26 08-19-26
P6B-CON-220 Install Irrigations Mains 08-20-26 08-24-26
P6B-CON-230 Fine Grade Site 08-20-26 08-21-26
P6B-CON-240 Form and Pour Curbs 08-25-26 08-29-26
P6B-CON-250 Form and Pour Sidewalks 08-31-26 09-11-26
P6B-CON-260 Pull Electrical Wire and Security Wire 09-12-26 09-16-26
P6B-CON-270 Install Landscaping 09-17-26 09-24-26
P6B-CON-280 Install Irrigation Branches 09-25-26 09-28-26
P6B-CON-290 Remove Construction Fencing and Barriers 09-29-26 10-01-26
Phase 6C Law and Justice CenterPhase 6C Law and Justice Center 04-02-26 05-28-26
P6C-CON-100 Setup Construction Fencing and Barriers 04-02-26 04-02-26
P6C-CON-110 Setup Temporary Access 04-03-26 04-03-26
P6C-CON-120 Setup SWPPP 04-04-26 04-04-26
P6C-CON-130 Clear and Grub 04-06-26 04-07-26
P6C-CON-140 Cap Off Utilities and Irrigation Lines 04-08-26 04-09-26
P6C-CON-150 Demo Existing Pavement and Sidewalk 04-10-26 04-13-26
P6C-CON-160 Rough Grade 04-14-26 04-15-26
P6C-CON-170 Fine Grade Site 04-16-26 04-17-26
P6C-CON-180 Form and Pour Curbs and Wall 04-18-26 05-05-26
P6C-CON-190 Form and Pour Sidewalks 05-06-26 05-16-26
P6C-CON-200 Install Expansion Joints 05-18-26 05-20-26
P6C-CON-210 Install Landscaping 05-21-26 05-22-26
P6C-CON-220 Install Signage 05-23-26 05-23-26
P6C-CON-230 Remove Construction Fencing and Barriers 05-26-26 05-28-26
Phase 7Phase 7 08-24-26 11-09-26
P7-CON-100 Call 811 and Markout Utilities 08-24-26 08-24-26
P7-CON-110 Setup Construction Fencing and Barriers 08-25-26 08-25-26
P7-CON-120 Setup Temporary Access 08-25-26 08-25-26
P7-CON-130 Setup SWPPP 08-26-26 08-26-26
P7-CON-140 Clear and Grub 08-27-26 08-28-26
P7-CON-150 Cap Off Utilities and Irrigation Lines 08-29-26 08-31-26
P7-CON-160 Demo Existing Pavement and Sidewalk 09-01-26 09-03-26
P7-CON-170 Excavate and Remove Storm Drain Pipes and Basin 09-04-26 09-10-26
P7-CON-180 Rough Grade 09-11-26 09-12-26
P7-CON-190 Install New Storm Drainage Lines and Basins 09-14-26 09-24-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Install Pre-Fab Seats
Install Landscaping
Install Irrigation Branches
Remove Construction Fencing and Barriers
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Rough Grade
Trench for Electrical
Install Underground Electrical Conduit
Set Pull and Junction Boxes
Backfill Electrical Trench
Set Lightpoles Bases, Light Poles and Bollards
Install Irrigations Mains
Fine Grade Site
Form and Pour Curbs
Form and Pour Sidewalks
Pull Electrical Wire and Security Wire
Install Landscaping
Install Irrigation Branches
Remove Construction Fencing and Barriers
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Rough Grade
Fine Grade Site
Form and Pour Curbs and Wall
Form and Pour Sidewalks
Install Expansion Joints
Install Landscaping
Install Signage
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Pavement and Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Rough Grade
Install New Storm Drainage Lines and Basins
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P7-CON-200 Install Footing for Barrier Wall 09-14-26 09-24-26
P7-CON-210 Backfill Storm Drain Trenches and Fine Grade 09-25-26 09-30-26
P7-CON-230 Trench for Electrical 09-25-26 09-26-26
P7-CON-220 Form and Pour Barrier Wall 1A and 1B 09-25-26 10-01-26
P7-CON-240 Install Underground Electrical Conduit 10-01-26 10-02-26
P7-CON-250 Backfill Electrical Trench 10-03-26 10-05-26
P7-CON-280 Install Irrigations Mains 10-03-26 10-05-26
P7-CON-260 Complete Fine Grade 10-06-26 10-07-26
P7-CON-270 Form and Pour Footings for Fencing 10-06-26 10-08-26
P7-CON-290 Backfill Around Footings 10-09-26 10-09-26
P7-CON-300 Form and Pour Curbs 10-10-26 10-16-26
P7-CON-310 Set Lightpoles Bases, Light Poles and Bollards 10-17-26 10-21-26
P7-CON-320 Form and Pour Sidewalks 10-17-26 10-23-26
P7-CON-330 Pull Electrical Wire and Security Wire 10-22-26 10-24-26
P7-CON-340 Place AC Pavement 10-24-26 10-29-26
P7-CON-350 Paint Parking Striping 10-30-26 10-30-26
P7-CON-360 Install Landscaping 10-30-26 11-02-26
P7-CON-370 Pull Wire for Lights and Security 10-30-26 10-31-26
P7-CON-380 Install Irrigation Branches 11-03-26 11-04-26
P7-CON-390 Set Wheel Stops 11-05-26 11-05-26
P7-CON-400 Remove Construction Fencing and Barriers 11-06-26 11-09-26
Phase 8Phase 8 08-24-26 11-13-26
P8-CON-100 Call 811 and Markout Utilities 08-24-26 08-24-26
P8-CON-110 Setup Construction Fencing and Barriers 08-25-26 08-25-26
P8-CON-120 Setup Temporary Access 08-25-26 08-25-26
P8-CON-130 Setup SWPPP 08-26-26 08-26-26
P8-CON-140 Clear and Grub 08-27-26 08-28-26
P8-CON-150 Demo Existing Pavement and Sidewalk 08-29-26 09-03-26
P8-CON-160 Excavate and Remove Storm Drain Pipes and Basin 09-04-26 09-10-26
P8-CON-170 Setup Dewatering 09-04-26 09-04-26
P8-CON-180 Rough Grade 09-11-26 09-15-26
P8-CON-190 Install New Storm Drainage Lines and Basins 09-16-26 09-21-26
P8-CON-200 Backfill Storm Drain Trenches and Fine Grade 09-22-26 09-26-26
P8-CON-210 Complete Fine Grade 09-28-26 09-30-26
P8-CON-220 Install Footing for Barrier Wall 09-28-26 10-08-26
P8-CON-230 Form and Pour Barrier Wall 1A and 1B 10-09-26 10-15-26
P8-CON-240 Form and Pour Curbs 10-16-26 10-24-26
P8-CON-250 Form and Pour Sidewalks 10-26-26 10-30-26
P8-CON-260 Place AC Pavement 10-31-26 11-05-26
P8-CON-270 Paint Striping 11-06-26 11-12-26
P8-CON-280 Install Signage 11-06-26 11-09-26
P8-CON-290 Remove Construction Fencing and Barriers 11-13-26 11-13-26
Phase 9Phase 9 03-28-26 11-25-26
Phase 9APhase 9A 03-28-26 09-15-26
P9A-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26
P9A-CON-110 Safe Off 04-02-26 04-02-26
P9A-CON-120 Cap Off Utilities and Irrigation Lines 04-02-26 04-03-26
P9A-CON-130 Install Construction Site Fencing 04-03-26 04-03-26
P9A-CON-140 Setup Temporary Access 04-03-26 04-03-26
P9A-CON-150 Setup SWPPP 04-04-26 04-04-26
P9A-CON-160 Clear and Grub 04-06-26 04-06-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Install Footing for Barrier Wall
Backfill Storm Drain Trenches and Fine Grade
Trench for Electrical
Form and Pour Barrier Wall 1A and 1B
Install Underground Electrical Conduit
Backfill Electrical Trench
Install Irrigations Mains
Complete Fine Grade
Form and Pour Footings for Fencing
Backfill Around Footings
Form and Pour Curbs
Set Lightpoles Bases, Light Poles and Bollards
Form and Pour Sidewalks
Pull Electrical Wire and Security Wire
Place AC Pavement
Paint Parking Striping
Install Landscaping
Pull Wire for Lights and Security
Install Irrigation Branches
Set Wheel Stops
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Demo Existing Pavement and Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Setup Dewatering
Rough Grade
Install New Storm Drainage Lines and Basins
Backfill Storm Drain Trenches and Fine Grade
Complete Fine Grade
Install Footing for Barrier Wall
Form and Pour Barrier Wall 1A and 1B
Form and Pour Curbs
Form and Pour Sidewalks
Place AC Pavement
Paint Striping
Install Signage
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Safe Off
Cap Off Utilities and Irrigation Lines
Install Construction Site Fencing
Setup Temporary Access
Setup SWPPP
Clear and Grub
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P9A-CON-170 Demo Site 04-07-26 04-11-26
P9A-CON-180 Rough Grade Area 9A 04-13-26 04-21-26
P9A-CON-190 Excavate Underground Storm Drain 04-22-26 04-30-26
P9A-CON-200 Install Storm Drain Lines 05-01-26 05-01-26
P9A-CON-210 Install Underground Electrical 05-02-26 05-02-26
P9A-CON-220 Install New Pump Vault 05-05-26 05-05-26
P9A-CON-230 Install New Pump 07-24-26 07-25-26
P9A-CON-240 Connect Storm Drain Lines to New Pump 07-25-26 07-27-26
P9A-CON-250 Connect Electrical Lines to New Pump 07-27-26 07-28-26
P9A-CON-260 Connect Storm Drain Lines to New Pump 07-28-26 07-29-26
P9A-CON-270 Excavate Footing for Wall 07-29-26 08-01-26
P9A-CON-280 Fine Grade and Build Berm 07-29-26 08-07-26
P9A-CON-290 Install Footing for Wall 08-01-26 08-03-26
P9A-CON-300 Form and Pour Wall 08-03-26 08-14-26
P9A-CON-310 Install Security Fencing 08-14-26 08-15-26
P9A-CON-320 Pull Wire for Lights and Security 08-15-26 08-17-26
P9A-CON-330 Form and Pour Curbs 08-17-26 08-28-26
P9A-CON-340 Form and Pour Sidewalks 08-28-26 09-10-26
P9A-CON-350 Paint Parking Striping 09-10-26 09-11-26
P9A-CON-360 Install Landscaping 09-11-26 09-12-26
P9A-CON-370 Set Wheel Stops 09-12-26 09-14-26
P9A-CON-380 Remove Construction Fencing and Barriers 09-14-26 09-15-26
Phase 9BPhase 9B 03-28-26 11-25-26
P9B1-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26
P9B1-CON-110 Safe Off 04-02-26 04-02-26
P9B1-CON-120 Install Construction Site Fencing 04-03-26 04-03-26
P9B1-CON-130 Cap Off Utilities and Irrigation Lines 04-03-26 04-04-26
P9B1-CON-140 Setup Temporary Access 04-03-26 04-03-26
P9B1-CON-150 Setup SWPPP 04-04-26 04-04-26
P9B1-CON-160 Clear and Grub 04-06-26 04-06-26
P9B1-CON-170 Demo Site 04-07-26 04-11-26
P9B1-CON-180 Install Sanitary By-Pass 04-13-26 04-17-26
Area 9B1Area 9B1 04-18-26 09-08-26
P9B1-CON-190 Excavate and Install Shoring 04-18-26 04-29-26
P9B1-CON-200 Install Foundations 04-30-26 05-05-26
P9B1-CON-210 Install Pre-Cast Rings 05-06-26 05-11-26
P9B1-CON-220 Install SD Piping 05-12-26 05-13-26
P9B1-CON-230 Install Pumps 07-24-26 07-29-26
P9B1-CON-240 Install Electrical 07-29-26 08-04-26
P9B1-CON-250 Install Waterproofing 08-04-26 08-08-26
P9B1-CON-260 Backfill and Strip Forms 08-08-26 08-12-26
P9B1-CON-270 Connect Pumps 08-12-26 08-21-26
P9B1-CON-280 Excavate Footing for Wall 08-21-26 08-24-26
P9B1-CON-290 Install Footing for Wall 08-24-26 08-28-26
P9B1-CON-300 Form and Pour Wall 08-28-26 09-08-26
Area 9B2Area 9B2 04-30-26 11-25-26
P9B2-CON-100 Excavate and Install Shoring - Pump Vaults 04-30-26 05-11-26
P9B2-CON-110 Pour Foundations - Pump Vaults 05-12-26 05-16-26
P9B2-CON-120 Install Pre-Cast Rings - Pump Vaults 05-18-26 05-22-26
P9B2-CON-130 Install SD Piping - Pump Vaults 05-23-26 05-26-26
P9B2-CON-140 Waterproof - Pump Vaults 05-27-26 05-28-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Demo Site
Rough Grade Area 9A
Excavate Underground Storm Drain
Install Storm Drain Lines
Install Underground Electrical
Install New Pump Vault
Install New Pump
Connect Storm Drain Lines to New Pump
Connect Electrical Lines to New Pump
Connect Storm Drain Lines to New Pump
Excavate Footing for Wall
Fine Grade and Build Berm
Install Footing for Wall
Form and Pour Wall
Install Security Fencing
Pull Wire for Lights and Security
Form and Pour Curbs
Form and Pour Sidewalks
Paint Parking Striping
Install Landscaping
Set Wheel Stops
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Safe Off
Install Construction Site Fencing
Cap Off Utilities and Irrigation Lines
Setup Temporary Access
Setup SWPPP
Clear and Grub
Demo Site
Install Sanitary By-Pass
Excavate and Install Shoring
Install Foundations
Install Pre-Cast Rings
Install SD Piping
Install Pumps
Install Electrical
Install Waterproofing
Backfill and Strip Forms
Connect Pumps
Excavate Footing for Wall
Install Footing for Wall
Form and Pour Wall
Excavate and Install Shoring - Pump Vaults
Pour Foundations - Pump Vaults
Install Pre-Cast Rings - Pump Vaults
Install SD Piping - Pump Vaults
Waterproof - Pump Vaults
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P9B2-CON-150 Backfill Precast Vaults and Strip Forms - Pump Vaults 05-29-26 06-01-26
P9B2-CON-160 Excavate and Install Shoring - 5 SIde Vault 06-02-26 06-06-26
P9B2-CON-170 Trench for Electrical After Backfill 06-02-26 06-04-26
P9B2-CON-180 Install Undergroud Electrical After Backfill 06-05-26 06-09-26
P9B2-CON-190 Form and Pour Foundation - 5 Side Vault 06-08-26 06-10-26
P9B2-CON-200 Install Undergroud Storm Drain After Backfill 06-10-26 06-20-26
P9B2-CON-210 Form and Pour Walls - 5 Side Vault 06-11-26 06-13-26
P9B2-CON-220 Setup Shoring for Lid - 5 Side Vault 06-15-26 06-15-26
P9B2-CON-230 Form and Pour Lid - 5 Side Vault 06-16-26 06-18-26
P9B2-CON-250 Form and Pour Equipment Pads 06-22-26 06-27-26
P9B2-CON-270 Set Electrical Equipment 06-29-26 06-30-26
P9B2-CON-280 Set Mechanical and Storm Drain Equipment 06-29-26 07-10-26
P9B2-CON-240 Install Pumps 07-24-26 07-30-26
P9B2-CON-260 Install Electrical 07-30-26 08-05-26
P9B2-CON-290 Install Waterproofing 08-05-26 08-07-26
P9B2-CON-300 Backfill- 5 Side Vault 08-07-26 08-11-26
P9B2-CON-310 Pull Wire and Terminate Electrical 08-10-26 08-21-26
P9B2-CON-320 Connect Pumps 08-12-26 08-21-26
P9B2-CON-330 Test and Energize Equipment 08-21-26 08-26-26
P9B2-CON-340 Excavate Footing for Wall (Continue from 9A-A) 09-08-26 09-12-26
P9B2-CON-350 Install Footing for Wall 09-12-26 09-21-26
P9B2-CON-360 Form and Pour Wall 09-21-26 09-30-26
P9B2-CON-370 Install Security Fencing 09-30-26 10-12-26
P9B2-CON-380 Install Devices and Pull Wire for Lights and Security 10-12-26 10-17-26
P9B2-CON-390 Form and Pour Curbs 10-17-26 10-27-26
P9B2-CON-400 Form and Pour Sidewalks 10-27-26 11-02-26
P9B2-CON-410 Pave Area 11-02-26 11-12-26
P9B2-CON-420 Paint Parking Striping 11-12-26 11-16-26
P9B2-CON-430 Install Landscaping 11-16-26 11-21-26
P9B2-CON-440 Remove Construction Fencing and Barriers 11-21-26 11-25-26
Phase 10Phase 10 09-03-26 11-25-26
P10-CON-100 Call 811 and Markout Utilities 09-03-26 09-05-26
P10-CON-110 Setup Construction Fencing and Barriers 09-05-26 09-08-26
P10-CON-120 Setup Temporary Access 09-05-26 09-08-26
P10-CON-130 Setup SWPPP 09-08-26 09-09-26
P10-CON-140 Clear and Grub 09-09-26 09-11-26
P10-CON-150 Cap Off Utilities and Irrigation Lines 09-11-26 09-12-26
P10-CON-160 Demo Existing Sidewalk 09-12-26 09-16-26
P10-CON-170 Excavate and Remove Storm Drain Pipes and Basin 09-16-26 09-22-26
P10-CON-180 Start Dewatering 09-16-26 09-18-26
P10-CON-190 Rough Grade 09-22-26 09-25-26
P10-CON-200 Install New Storm Drainage Lines and Basins 09-25-26 10-02-26
P10-CON-210 Trench for Electrical 09-25-26 09-28-26
P10-CON-220 Install Footing for Wall 09-25-26 10-05-26
P10-CON-230 Install Underground Electrical Conduit 09-28-26 10-02-26
P10-CON-240 Backfill Electrical Trench 10-02-26 10-05-26
P10-CON-250 Fine Grade and Build Berm 10-05-26 10-12-26
P10-CON-260 Form and Pour Wall 10-05-26 10-10-26
P10-CON-270 Form and Pour Curbs 10-10-26 10-28-26
P10-CON-280 Install Irrigatiion Mains 10-12-26 10-16-26
P10-CON-290 Form and Pour Sidewalk 10-16-26 10-26-26
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Backfill Precast Vaults and Strip Forms - Pump Vaults
Excavate and Install Shoring - 5 SIde Vault
Trench for Electrical After Backfill
Install Undergroud Electrical After Backfill
Form and Pour Foundation - 5 Side Vault
Install Undergroud Storm Drain After Backfill
Form and Pour Walls - 5 Side Vault
Setup Shoring for Lid - 5 Side Vault
Form and Pour Lid - 5 Side Vault
Form and Pour Equipment Pads
Set Electrical Equipment
Set Mechanical and Storm Drain Equipment
Install Pumps
Install Electrical
Install Waterproofing
Backfill- 5 Side Vault
Pull Wire and Terminate Electrical
Connect Pumps
Test and Energize Equipment
Excavate Footing for Wall (Continue from 9A-A)
Install Footing for Wall
Form and Pour Wall
Install Security Fencing
Install Devices and Pull Wire for Lights and Security
Form and Pour Curbs
Form and Pour Sidewalks
Pave Area
Paint Parking Striping
Install Landscaping
Remove Construction Fencing and Barriers
Call 811 and Markout Utilities
Setup Construction Fencing and Barriers
Setup Temporary Access
Setup SWPPP
Clear and Grub
Cap Off Utilities and Irrigation Lines
Demo Existing Sidewalk
Excavate and Remove Storm Drain Pipes and Basin
Start Dewatering
Rough Grade
Install New Storm Drainage Lines and Basins
Trench for Electrical
Install Footing for Wall
Install Underground Electrical Conduit
Backfill Electrical Trench
Fine Grade and Build Berm
Form and Pour Wall
Form and Pour Curbs
Install Irrigatiion Mains
Form and Pour Sidewalk
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
P10-CON-310 Install Landscaping 10-26-26 11-04-26
P10-CON-300 Set Lightpoles Bases, Light Poles and Bollards 10-28-26 11-06-26
P10-CON-330 Install Irrigation Branches 11-04-26 11-09-26
P10-CON-340 Install Security Fencing and Gates 11-04-26 11-14-26
P10-CON-320 Place AC Pavement 11-06-26 11-17-26
P10-CON-350 Paint Parking Striping 11-17-26 11-19-26
P10-CON-360 Pull Wire and Makeup for Lights and Security 11-17-26 11-24-26
P10-CON-370 Remove Construction Fencing and Barriers 11-24-26 11-25-26
FEMA CloseoutFEMA Closeout 11-25-26 01-12-27
CLOS-CON-100 Final Billings 11-25-26 12-11-26
CLOS-CON-120 Closeout Documentation 11-25-26 01-12-27
CLOS-CON-110 Reimbursement Request 12-11-26 01-05-27
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027
Install Landscaping
Set Lightpoles Bases, Light Poles and Bollards
Install Irrigation Branches
Install Security Fencing and Gates
Place AC Pavement
Paint Parking Striping
Pull Wire and Makeup for Lights and Security
Remove Construction Fencing and Barriers
Final Billings
Closeout Documentation
Reimbursement Request
Data Date: 11-11-25 Print Date: 01-19-26 08:31
SOLANOC-ASSET-LF-1-1-2 | # 123
Complete
Milestone
Critical Milestones
Summary Milestones
Actual Work
Remaining Work
Critical Remaining Work
Remaining Level of Effort
Actual Level of Effort
AREA LITE
AREA LITE
NO
PARKING
RESERVED
RESERVED
NO
PARKING
RESERVED
NO
PARKING
NO
PARKING
NO
PARKING
NO
PA
RK
IN
G
NO
PARKING
NO
PARKING
NO
PARKING
NO
PARKING
B
BB
B
B
B
B
B
B
B
B
B
B
B
B
B
BB
B
B
B
B
B
B
B
B
B
B
BB
B
B
NO
PA
RK
IN
G
NO
PARKING
NO
PARKING
CR
IC
C R
IC IC
IC
IC
C R
C R
C R
CR
IC
IC
CR
C R
C R
C R
CR
IC
IC
IC
IC
CR
C R
CR
C R
C R
CR
C R
C R
CONSTRUCTION
PHASING
X:
\1
\1
4.
\T
EC
H \C
AD
\P
AR
KI
N G
L O
T
IM
PR
O
VE
M
EN
TS
\G -0
C
O N
ST
R
U C
TI
O
N P
H