QA JEH Cafeteria Food Services Spreadsheet_Government Response.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Food Services FBI Headquarters
Solicitation number
20260
Issued by

About this file

This is a Questions and Answers (Q&A) document for the FBI Headquarters Cafeteria and Food Services contract (Solicitation 20260), documenting 71 questions from offerors and corresponding government responses. The contract is a Firm-Fixed Price (FFP), no-cost contract where the successful vendor assumes all profit and loss responsibility for cafeteria operations, with a Time and Materials (T&M) cost element available for repair and replacement of existing equipment. The contract covers food service operations at the J. Edgar Hoover (JEH) Building in Washington, DC, serving approximately 4,000 federal employees and contractors, with potential expansion to other National Capital Region locations at the government's discretion.

Key operational requirements include: managing a full cafeteria, Starbucks franchise (government-owned equipment except POS; new vendor must establish independent franchise agreement), and Dunkin' franchise (all equipment currently contractor-owned); operating Grab & Go self-service 24 hours on the 8th floor cafeteria; providing debit, credit, and cash payment acceptance with hardwired POS systems only (no wireless); maintaining one full-time manager across all locations; supporting approximately 15 special functions annually and courtyard events (~2 times yearly); coordinating with FBI O&M for equipment maintenance under a case-by-case repair versus replacement model; and complying with extensive security requirements including U.S. citizenship, staggered security clearances (2 weeks for escorted access; 6-12+ months for unescorted), registered devices only, and no wireless/Bluetooth connectivity. The government will not provide historical revenue data, current staffing levels, or complete 12-month transaction data (only April-October 2025 provided), though a Collective Bargaining Agreement will be provided separately. A draft award-fee plan will not be disclosed prior to award, though performance metrics will align with the Quality Assurance Surveillance Plan (QASP).

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A

JEH Cafeteria and Food Services (2026)
No.ReferenceQuestion / CommentOfferor Recommended RevisionGovernment ResponseUpdate Required?
#EXAMPLE: SOW Section 2.2.2Section 2.2.2 of the SOW allows coordination with the original system designer when program changes are needed. Confirm whether a qualified Allen-Bradley integrator, provided with the PLC and HMI program files and passwords, would be able to perform normal troubleshooting, repairs, and program changes without needing to involve the original system integrator.Contractor recommended response/change to the solicitation or supporting document(s). How would contractor recommend the Government adjust the requirement or document to resolve question/comment?A qualified integrator would be allowed perform repairs and normal troubleshooting without involving the original system integrator.No
1Can historical cafeteria and catering revenue data be shared?Please share historical revenue data for both the cafeteria and catering for this account for the past 4 years.No. Revenue data is company-sensitive and will not be shared.No
2Can historical sales by individual location/concept be provided?Please breakout historical data by individual location/concept.Transaction data by location can be found in Section 3.0 of the PWS (Attachment A)No
3Can maintenance logs, repair history, and the most recent equipment maintenance reports be provided?Please provide maintenance logs, repair history, and the most recent equipment maintenance reports.See attachment.No
4Are there any anticipated capital improvements or known equipment upgrades/replacements expected during the contract term?Please share if there any anticipated capital improvements or known equipment upgrades/replacements expected during the contract term.We replace cafeteria equipment on an as-needed basis.No
5Is there a labor union associated with this contract?Please share if this is a labor union contract.Yes, please see Section 6.4 of the PWS (Attachment A)No
6Who currently owns the Starbucks and Dunkin’ licenses, and are they transferable?Please share who currently owns the Starbucks and Dunkin’ licenses, and are they transferable.Please see Section 4.5 of the PWS (Attachment A). Sodexo (incumbent) is the current franchisee and new vendor would be expected to enter into new franchise agreement independent of incumbent's agreement.No
7Who owns the franchise-related equipment within the Starbucks and Dunkin’ operations?Please share who owns the franchise-related equipment within the Starbucks and Dunkin’ operations.Starbucks: the government owns all equipment except the Point of Sale (POS). Dunkin: the government owns none of it currently.No
8How does Starbucks mobile ordering function within secure areas where phones are required to remain in airplane mode?Please explain how does Starbucks mobile ordering functions within secure areas where phones are required to remain in airplane mode.Airplane mode is only required for non-employees. Employees may use the app when they are located in non-secure spaces. The app identifies our location as being available to people that have access to the building.No
9What specific scope of work and costs are firmed fixed price since it appears all cafe services and brands are under a profit and loss model in which there are no costs to be billed to the client, other than for approved equipment (time and materials)?Please confirm the specific scope of work and costs are firmed fixed price since it appears all cafe services and brands are under a profit and loss model in which there are no costs to be billed to the client, other than for approved equipment (time and materials).This is a Firm-Fixed Price (FFP), no cost, contract where the successful vendor would be responsible for profit and loss. There will be a T&M cost element for repair/replacement of existing equipment.No
10Who is responsible for low-voltage cabling?Please share who is responsible for low-voltage cabling and if there an existing vetted vendor approved for facility access.The food service provider is responsible for providing their own internet service. Whichever vendor they want to utilize will have to be cleared for access to the building. Please list devices requiring low-voltage cabling.No
11Who is the current ISP?Please share who the current ISP is and if the service is transferable.The ISP is Verizon. The incumbent food service provider is responsible for this service.No
12Are there restrictions regarding router, firewall, or switch types?Please share if there are there restrictions regarding router, firewall, or switch types and if devices require preappoval.No. There are no restrictions, however, all IT equipment must be approved through FBI security division.No
13Will the operator have access to DEMARC locations and IT closets?Please share if the the operator will have access to DEMARC locations and IT closets.The food service provider will not have unfettered access to these spaces. However, if access is required they can be escorted.No
14Can cellular service be used for office phones?Please share if cellular service can be used for office phones.Cleared personnel can use personal/company cell phones. There may not always be service, however.No
15We understand cell phones must be registered and remain in airplane mode. Please clarify the procedures for regular employees.Please provide the response to the question.Security addresses this with contract staff when providing badges.No
16Are laptops permitted within the building?Please provide the response to the question.No.No
17What are the security requirements or restrictions related to computers (Wi-Fi, Bluetooth, cameras, etc.)?Please provide the response to the question.No wifi, bluetooth, cameras, etc are allowed.No
18What are the security requirements or restrictions related to POS systems (Wi-Fi, Bluetooth, cameras, etc.)?Please provide the response to the question.All POS systems must be hardwired.No
19Per the Statement of Work (Page 6), the Government encourages “quick pay” systems such as FreedomPay or NFC-type systems.
•Are FreedomPay, Free-to-Go, gift cards, or other declining balance card systems currently in use that would need to transfer to the incoming operator?Please provide the response to the question.None are currently in use.No
20Per the Statement of Work (Page 9), courtyard events may require temporary POS stations.
•Can cellular connectivity be utilized for POS devices during courtyard events?Please provide the response to the question.Yes.No
21Per the Statement of Work (Page 16), the contractor is responsible for providing its own IT infrastructure and related systems. This appears to be the only detailed reference to IT responsibilities within the RFP. Can additional clarification or technical requirements be provided regarding IT expectations and infrastructure support?Please provide the response to the question.No. The technical requirement is that all contractor systems be hard-wired. No wireless.No
23PWS 3.0 Historical MetricsThe PWS provides cafeteria/Dunkin/Starbucks transactions for Apr–Oct 2025. Please provide the remaining months (Nov–Mar) and the most recent available data (CY2024 and CYTD 2026) by outlet.Provide a complete 12-month transaction table by outlet for the most recent full year and current year-to-date, to ensure consistent assumptions across offerors.No. The data provided in 3.0 of the PWS includes seven (7) months of CY 2025 data and no additional information will be provided.No
24PWS 3.0 / RFP No-cost contractPlease provide gross sales ($) by outlet (cafeteria, Dunkin, Starbucks) for the same periods as the transaction metrics to enable realistic revenue-only modeling.Provide monthly gross sales by outlet for the same periods as the transaction table (or a redacted range if needed) so offerors can model financial viability under the no-cost construct.No. Revenue data is company-sensitive and will not be shared.No
25PWS 6.3 As Requested ReportingPlease provide transactions/sales by hour and by daypart (breakfast, between-meals/continental, lunch, Grab & Go) for a representative period, consistent with the example report described in the PWS.Provide a sample “transactions per hour and dollar value” report (5 consecutive days) and/or define the expected daypart breakdown to support staffing and queue planning.These numbers are not available.No
26PWS 3.0 Note on changesThe PWS notes prices and operational hours changed several times in CY2025. Please provide the effective dates and summary of those changes to contextualize the historical data.Provide a brief change log (dates, hour changes, and major pricing updates) for CY2025 so offerors can interpret historical performance accurately.Operational hours were changed on a case by case basis due to internal conversations between contractor and government staff. The government may consider amending operational hours post-award given the appropriate justfication and acceptance by the COR and CO.No
27PWS 4.2 Hours of ServiceThe PWS lists “Grab & Go Self Service: 24 Hours.” Please clarify the required operating model (staffed vs. self-service), location(s), and minimum product categories required during non-operational hours.Define the 24-hour Grab & Go requirement (locations, minimum assortment, stocking cadence, and whether staffing is required) and include in Q&A.The required operating model would be self-service, as we do not expect 24/7 staffed service. The location is in the 8th floor cafeteria. We will evaluate product categories while reviewing proposals.No
28PWS 4.2 Hours of ServicePlease confirm the expected offerings between breakfast and lunch (continental breakfast items, beverages, prepackaged goods) and whether any minimum variety/quantities are required.Specify minimum offerings and service expectations for the between-meals period to ensure consistent evaluation of offeror approaches.The government will evaluate offerings while reviewing proposals. The successful vendor may provide their unique solution to menu items offered between meal periods.No
29PWS 4.11 Limitations / 4.6 CateringThe PWS states no weekend/holiday work without prior CO/COR approval, but also anticipates evening/weekend catering. Please clarify the approval process and lead time for after-hours/weekend events.Clarify the approval workflow, notice requirements, and any standing pre-approvals allowed for recurring after-hours/VIP events.A select number of contractor staff will be given continual access outside of normal hours as needed.No
30PWS 4.1 Customer Service and PersonnelThe PWS states industry standard queuing times will be established jointly prior to contract start. Please define the queue-time metric, how it will be measured, and how it ties to QASP/AQLs and award fee (if used).Provide a defined queue-time standard (e.g., maximum wait time) and measurement method, and describe how results impact performance surveillance and any incentive/award-fee plan.Ulimately queuing metrics will be measured against the industry standard for that dining environment. It will align with the 7th Performance Objective related to registers and staffing during peak and non-peak hours.No
31PWS 4.1 Customer Service and PersonnelThe PWS requires a full-time manager/management representative in the cafeteria and all franchised locations. Please confirm whether this requires concurrent presence at all locations during all open hours, and whether one manager may oversee multiple outlets.Clarify management coverage requirements by outlet and hour (including whether a single management rep can cover multiple locations when co-located).The requirement in Paragraph three (3) in section 4.1 will require one (1) Manager present across all cafeteria and franchised locations.No
32PWS 4.0 / 4.1 Payment AcceptanceThe PWS requires acceptance of debit, credit, and cash at all JEH locations. Please confirm if there are FBI-specific payment restrictions (NFC/quick pay approvals, mobile ordering constraints, connectivity/security requirements).Confirm any payment restrictions and provide security/IT requirements for POS, handheld devices, and networks so offerors can propose compliant systems.There are no current restrictions on payment method. There is no wifi or bluetooth connections permitted for POS systems.No
33PWS 4.6 Catering PaymentsCatering payments are outside the purview of the contract and must be collected from Government POCs, paid five (5) days prior. Please clarify allowed payment methods (P-card, invoicing, etc.) and escalation path if payment is not received.Clarify acceptable payment methods and a standard process for non-payment or late changes/cancellations so contractors can manage financial risk.Please refer to Paragraph 2, Section 4.6 requiring all non-government sanctioned catered events be paid five (5) days prior to the catered event. This lead time in payment should prevent the need for escalation. Payment method should mirror the payment types for conventional cafeteria use (e.g. cash, check, credit card, etc.)No
34PWS 4.5 / 4.5.1 StarbucksThe PWS states the Contractor is financially responsible for franchise remodeling requirements. Please disclose any known/pending remodels, refresh cycles, or compliance upgrades expected during the base year.Provide any known franchise-required remodel scope/timing (or state none known) to allow offerors to price and plan appropriately.There are currently no known/pending updates scheduled.No
35PWS 4.5.1 Starbucks / TransitionStarbucks requires a Starbucks-certified manager and trained baristas, with peak-hour staffing windows defined. Please confirm training/ certification timelines and whether early access will be granted during transition for training and observation.Clarify transition access allowances and required training completion dates to prevent service disruptions at go-live.The early access for training and transition will be provided thirty (30) days in advance of contract Period-of-Performance start.No
36PWS 4.6 Catering and Special FunctionsThe PWS states the Government may request/permit other vendors (food trucks, craft fairs, RA events) and contractor participation is case-by-case. Please clarify expected frequency and coordination/notification timelines.Provide minimum notification timelines and coordination procedures for third-party food events to support security, logistics, and continuity planning.Please refer to Section 4.6, first paragraph - Special functions occur throughout the year on an as needed basis, approximately fifteen (15) times per year.No
37PWS 4.6 Courtyard Special EventsFor courtyard events (~2 times/year), please clarify allowed contractor participation (POS locations), security/logistics roles, and any revenue restrictions.Define participation rules and responsibilities for courtyard events, including security escort requirements and permitted sales methods.The contractor may be asked to participate/provide catering services in courtyard events. Security escort/logistics requirements remain the same. Revenue restrictions regarding pricing are the same as in the cafeteria.No
38PWS Exhibit A QASP / SurveillanceThe QASP notes contractor surveillance reports are currently paper-based and may transition to software. Please confirm whether contractor electronic QC systems and photo-verified corrective actions are acceptable for Government surveillance review.Confirm Government acceptance of contractor electronic QC platforms and define the data elements needed for surveillance review (e.g., checklists, corrective action logs).No. At this time performance metrics are measured using the Government's paper based system. However, alternative QC systems may be employed in the future with coordination between the Government CO and the successful contractor.No
39PWS 4.7 Pest ControlThe FBI O&M contractor provides pest control, but the food service contractor must support and coordinate treatments. Please clarify contractor responsibilities during treatment events (prep, shutdowns, documentation, re-opening approval).Clarify roles/responsibilities and documentation requirements for pest control coordination to prevent compliance gaps.O&M events will be coordinated through Government POCS (CO, CS, COR), the O&M vendor, and the cafteria food service vendor.No
40PWS 4.12 Trash/Recycling/GreasePlease confirm the contractor responsibilities for trash movement from all assigned areas (cafeteria + franchised locations) and whether Government trash service excludes Starbucks as stated.Clarify Starbucks-specific trash and dining-area cleaning responsibilities versus Government-provided services.Please refer to section 4.12 where it instructs the successful vendor to place all refuse in the provided dumpsters at the loading dock on level 1B.No
41PWS 4.12 Grease Removal / 4.13 EquipmentGrease removal is contractor responsibility and grease cannot be stored on JEH property. Please confirm approved disposal method expectations and whether any specific access constraints apply to grease-hauling vendors.Provide any JEH security/access constraints for grease-hauling vendors and whether recurring vendor approvals are permitted.Please refer to section 4.12, paragraph 2.No
42PWS 4.13 Govt Furnished Equipment / PMThe PWS states scheduled PM on Government/contractor equipment is performed by 3rd-party O&M or authorized vendor, but also states certain food operations equipment and related systems are maintained by the contractor. Please provide a clear responsibility matrix (O&M vs Contractor).Publish a responsibility matrix listing which PM tasks are performed by O&M vs contractor (daily/weekly cleaning, routine PM, duct/fan hood PM, repairs, and replacements) and required documentation.No matrix will be provided. Responsible usage by the cafeteria contractor is required, and repairs and preventative maintenance are done by a third party.No
43PWS 4.13 Replacement CriteriaThe Government replaces equipment when repair is not feasible or exceeds 90% of market value, contingent on contractor PM/cleaning compliance. Please clarify how “market value” is determined and the decision authority for repair vs replace.Define market value determination method (e.g., quotes, depreciation schedule) and identify decision authority and documentation needed.We will review each piece of equipment on a case-by-case basis to determine what is more cost effective, repair or replacement, based on quotes provided for both.No
44PWS 4.10 InvoicesThe PWS requires Government-funded costs to be pre-approved and invoices provided within 60 days or Government may be absolved. Please confirm the approval process and required documentation for Government-funded equipment replacements or urgent requests.Provide a short process map (pre-approval steps, documentation, and submission method) for Government-funded costs to avoid disputes.Large equipment replacement purchases will occur outside of this contract. Refer to section 4.10 for guidance on invoice submission and approval path.No
45PWS 4.9 Security and LimitationsThe PWS states U.S. citizenship is required and outlines escorted vs unescorted access timelines (approx. two weeks after fingerprinting for escorted access; 6–12 months+ for unescorted). Please clarify staffing expectations during the clearance pipeline and any limits on escorted staffing.Clarify allowable escorted staffing coverage and any minimum unescorted staffing expectations at go-live to ensure continuity.The expectation while in the clearance pipeline is the same as after clearances are awarded. Regarding escorting, there is a requirement of one (1) escort per five (5) guests. We can discuss escorting during the initial 2-week process with the contractor that is awarded.No
46PWS 4.9 Deliveries / Parking PassDelivery parking passes require driver/vehicle details 72 hours in advance. Please confirm whether recurring delivery vendors may be pre-approved and whether this requirement applies to all deliveries or only certain vehicle types.Allow standing approvals for routine vendors/drivers where feasible and clarify which deliveries require 72-hour notice.Once the new contract is awarded, all vendors will need to go through the process, regardless of current status. This applies to all deliveries, regardless of vehicle type.No
47PWS 4.9 Devices / ITPersonal and portable electronic devices must be registered and Wi-Fi/Bluetooth disabled. Please clarify whether contractor POS handhelds/tablets, scanners, and IoT devices are permitted and what registration/approval process applies.Provide an approved device list/process and define connectivity constraints for POS networks so contractors can design compliant systems.No wireless devices allowed.No
48PWS 6.4 CBA / RFP Factor 2The PWS states an active CBA exists and “may be provided during transition.” Please provide the CBA (or key wage/fringe terms) prior to proposal submission so offerors can develop realistic staffing plans.Provide the current CBA (or at minimum wage/fringe and successorship requirements) with the solicitation, or in Q&A, to support realistic staffing and pricing.CBA will be provided as a separate attachment within the solicitation package. Please refer to the attachment.Yes
49RFP Contract Type / Award Fee; PWS QASPThe RFP indicates an FFP component with an award-fee and the FBI may implement an award-fee plan after award. Please provide the draft award-fee plan or identify the performance areas/metrics that will drive award-fee determinations.Provide a draft award-fee plan (or outline) that ties to QASP outcomes/AQLs (service, sanitation, reporting, customer satisfaction, queue times) so offerors understand performance incentives.No. The award-fee plan will not be provided in advance of contract award as the Government has reserved the right to implement said plan post award. The performance area metrics driving any resultant award-fee implementation will largely reflect the QASP.No
50PWS 1.0PWS 1.0 states that the dining facilities are limited to authorized visitors. Does the cafeteria currently offer different prices for FBI employees and their visitors?No. The current pricing structure is applicable to all patrons.No
51PWS 1.0/RFP 1.0The PWS and RFP both refer to this contract covering FBI operations in the "National Capital Region." Can the Government provide estimates of the number and location (DC, MD, VA) of additional locations under consideration?At this time the JEH/Headquarters building is the only place-of-performance for cafeteria/food services. Section 3.0 of the PWS reserves the Government's right to adjust place-of-performance within the National Captial Region (NCR) during the period-of-performance.No
52PWS 3.0Can the current check average be provided?No. This information is unavailable.No
53PWS 4.0PWS Section 4.0 includes the requirement that "The Contractor accepts debit cards, credit cards, and cash at all JEH locations." Does the FBI have a bank in the building, and will the contractor be able to set up an account for cash deposits?There is a credit union in the building, Justice Federal Credit Union. The awarded vendor would need to reach out to the credit union for any questions regarding accounts.No
54PWS 4.1Can the FBI provide current staffing levels being utilized?No.No
55PWS 4.12Can the FBI provide the current process and service for the grease trap cleaning and removal of grease from the building?Please refer to section 4.12, paragraph 2.No
56PWS 4.12PWS Section 4.12 does not describe the current procedures for disposing of cooking oil. May Contractors place a container outside of the bulding for disposal of cooking oil?No. Refer to paragraph 2, Section 4.12 with respect to grease disposal.No
57PWS 4.13Are the cash registers in Starbucks, Dunkin, and the main cafeteria owned by the FBI or the current contractor?All registers at the time of this Q&A are owned by the current contractor.No
58PWS 4.13Can the FBI provide any reports on recent preventative maintenance completed on existing kitchen equipment?See preventative maintenance (PM) report.Yes
59PWS 4.6Does the FBI have an estimate of the amount of catering revenue completed at the FBI in the past 12 months?No.No
60PWS 4.6Does the FBI have any large catering events planned within two months of the contract start date?Not at this time.No
61PWS 4.6Is each catering event -- "special function" or "courtyard special event" -- requested and priced as a separate, discrete contract or task order? Or are any of the events planned and procured as a bundle?No. Separate catering and special events/functions are addressed in Section 4.6 and will not be a separate task order or bundled.No
62PWS 4.9Is there an offsite screening process for deliveries, or do the trucks arrive straight to the JEH building?Straight to JEH, security sweeps done on site.No
63PWS 4.9If any of the employees on the current contract stay on as employees of a new vendor, would they need to redo their security clearance?The employees should be able to have their clearance passed as they are FBI-sponsored.No
64PWS 6.4PWS Section 6.4 states that a copy of the Collective Bargaining Agreement (CBA) "may be provided during the transition period."In order to allow offerors to prepare accurate cost estimates, we request that the Government provide the current CBA.CBA will be provided as a separate attachment within the solicitation package. Please refer to the attachment.Yes
65RFP 2What is covered by the FFP Other Direct Cost - TBD CLINs under supplies/services? If these are NTE CLINs, can the FBI please share the value?This is an FFP no-cost contract. Cost-type (T&M) lines have been established as place holders in the event equipment repair/replacement is warranted.No
66RFP 3In July 2025, the FBI announced that it would be moving from the J. Edgar Hoover (JEH) Building to the Ronald Reagan Building. Does the government expect the move from JEH to take place during the period of performance of this contract?At this time the JEH/Headquarters building is the only place-of-performance for cafeteria/food services. Section 3.0 of the PWS reserves the Government's right to adjust place-of-performance within the National Captial Region (NCR) during the period-of-performance.No
67RFP 5(h)RFP Section 5(h) provides a list of Procurement Events and says that questions will be answered on 5/23/2026. However, this is the Saturday of Memorial Day weekend. Is this the correct date?In order to allow offerors time to properly address any changes arising from clarifications, we request that answers be provided on Friday, 5/22, no later than 5:00pm.Answers will be provided by NLT May 26th, 2026.Yes
68PWS 3.0Section 3.0 of the PWS specifically details transactions, by location and by month, for the April '25 - October '25 timeframe. Can you please provide these transaction counts for the most recent fiscal quarter, to include January '26 - March '26.Recommendation of adjusting the transaction chart provided in section 3.0 of the PWS to include the most recent fiscal quarter.No. The data provided in 3.0 of the PWS includes seven (7) months of CY 2025 data and no additional information will be provided.No
69PWS 3.0Section 3.0 of the PWS specifically details transactions, by location and by month, for the April '25 - October '25 timeframe. Can you please provide the transactions specific to the Catering and Special Functions, as described in Section 4.6 for the same timeframe, as well as for the most recent fiscal quarter of January '26 - March '26.Recommendation of adjusting the transaction chart provided in section 3.0 of the PWS to include the transactions pertaining to Catering and Special Funtions as defined in Section 4.6 of the PWS.Please refer to Section 4.6, first paragraph - Special functions occur throughout the year on an as needed basis, approximately fifteen (15) times per year.No
70PWS 6.0Section 6.0 of the PWS; Period of Performance States the period of performance to be a single base year, followed by 4 optional performance years resulting in a posible total performance period of 5 years. Likewise, the FBI National Press Office released a joint statement on July 1st, 2025 stating the FBI Headqaurters would be relocating from the JEH Building to the Ronald Reagan Building complex. What is the expected timeline of events for the JEH Building to remain the FBI's Headquarters, and what are the expected building poplation changes in the course of the period of performance stated in section 6.0 of the PWS.Seeking additional information on the JEH Building's anticipated future, and how the FBI's departure is extected to impact the building population for each year of the Period of Performance.At this time the JEH/Headquarters building is the only place-of-performance for cafeteria/food services. Section 3.0 of the PWS reserves the Government's right to adjust place-of-performance within the National Captial Region (NCR) during the period-of-performance.No
71PWSThe PWS nor the RFP explicitly state details or responsibility of modifications of existing space to meet current industry standards, preferences, or potential upgrades. Would it be acceptable to install digital signage, upgrade lighting in service areas, and modify any portions thereof the exisiting space; and if able, is it the responsibilty of the contractor or FBI for the project management and payment of these potential modifications.Seeking Additional information of the ability, and feasability to alter or modify excisting space within the defined working spaces.The acceptiblity of any and all upgrades will be reviewed on a case-by-case basis, as well as the responsibility for their cost, depending on the type of upgrade.No