This is Addendum 5 to Request for Quotation No. 2026-26 issued by the Town of Farragut, Tennessee for the construction of a new public restroom facility at McFee Park. The addendum clarifies key project parameters and answers ten critical bidder questions regarding contract terms, site conditions, utility infrastructure, and construction scope. The project scope is limited to the building structure itself, excluding sidewalks, utilities, storm drainage, benches, fencing, asphalt, curbing, and landscaping work. Sealed bids are due April 21, 2026 at 2:00 PM, with the deadline for bidder questions established at April 14, 2026. The Intent to Award is scheduled for April 22, 2026, and Board approval is scheduled for May 14, 2026. Substantial Completion must be achieved within six months from the Notice to Proceed, with Final Completion and all punch list items completed within two weeks thereafter.
The addendum confirms that the Town does not provide upfront payment and invoicing follows monthly progress billing based on completed work verified by Town staff. Building permit fees are waived as this is a Town of Farragut project. Contractors must price all utility hookups (water, sewer, and electric) with utilities stubbed to the building site five feet out; contractors are responsible for coordinating and paying for all utility service connections at no markup to the Town. All footing spoils must be exported from the site. The dog park will be close to completion but not fully operational before construction begins, and the grading project currently underway is limited to dog park pathways only. All communication regarding the RFQ must be submitted via email to Tessa Cortes, Finance Director, and contact with any other Town personnel is forbidden and may result in bid disqualification. Only written statements issued by the Finance Department are official and binding; verbal communications are considered unofficial and non-binding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Town of Farragut
Addendum 5
RFQ No. 2026-26
Town of Farragut McFee Park Restroom Build 4/15/26
The proposer acknowledges this addendum shall modify and become a part of the original solicitation document. The Proposer further acknowledges that should it be determined at the time of the bid opening that the Proposer has failed to acknowledge receipt of ALL issued addenda; the Proposer’s Bid submission shall be rejected. The Proposer understands that any verbal representation made or assumed to be made during any oral discussion held between Proposer’s representatives and any Town personnel is not binding. Only the information issued in writing and added to the specifications by an oƯicial addendum is binding.
Q1. Can we invoice a deposit draw if awarded? Is there a draw request, meaning how many draws, that I can put directly into my contract.
A1. Our contract typically calls out monthly progress billing based on the work that has been performed and checked by staƯ. We do not pay anything up front.
Q2. How large of an area can be secured, around the building site?
A2. Due to the location of pathways etc. there will not be much additional space for building outside of the footprint and utilities.
Q3. Are their details on post lighting?
A3. There are no details on post lighting.
Q4. When will the current grading project be completed? Are they going to be grading the site in preparation for the new building?
A4. Grading is for the dog park pathways.
Q5. The civil drawings are not clear, but we are only to bid on the building itself, right? We are not to include sidewalks, utilities, storm drainage, benches, fencing, asphalt, curb, and landscape, correct?
A5. Yes. Building Itself
Q6. Is the building permit fee waived for this project?
A6. Yes it will be. It’s a TOF project.
Q7. Are you anticipating new utility water and sewer taps, or are we to price all utilities stubbed out 5’?
A7. Utilities are stubbed up. Price hookups
Q8. Where is the transformer located to supply the power service to the building?
A8. It is in that cleared space
Q9. Will the dog park be completed and operational before construction starts?
A9. Not completed, but close
Q10. Are we to export the footing spoils?
A10. Yes
All communications regarding this RFQ must be submitted via email to the Finance Department representative identified below:
Tessa Cortes, Finance Director, tcortes@townoƯarragut.org
The Finance Director will be the point of contact for this RFQ.
Proposers’ contact with anyone else in the Town is forbidden and may result in disqualification of the Proposer’s bid. Further, any oral communication will be considered unoƯicial and non-binding on the Town. Proposers should rely only on written statements issued by the Finance Department representative.