! 2024-08-12 BSFD Station No. 3 CMGC RFQ - Addendum #1.pdf

PDF 352 KB Posted

Attached to
Big Sky Fire Department Station No. 3
Solicitation number
RFQ_QUAL_F-BSFD-0000000001
Issued by
Gallatin County, Montana

About this file

This document is Addendum #1 for the Big Sky Fire Department's Request for Qualifications (RFQ) for Construction Manager/General Contractor (CM/GC) Services for Fire Station No. 3 in Big Sky, Montana, dated August 12, 2024. The addendum introduces several key modifications to the original RFQ, including changes to insurance limits, workers' compensation language, and removal of pollution liability requirements. The document also adds multiple new exhibits to the solicitation, including 100% Design Development Documents, standard AIA agreement forms, and owner-required payment and performance bond forms.

The addendum specifically revises several sections of the original RFQ, most notably reducing the minimum insurance limit to $1,500,000.00, modifying workers' compensation language, and clarifying Montana code on immigration law considerations. The updated documents provide potential bidders with comprehensive information for the project, including detailed drawings, specifications, equipment cutsheets, and contractual agreements. The addendum signals the project's progression and provides additional clarity and documentation for interested construction firms seeking to participate in the Fire Station No. 3 project.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3459 Ringsby Court, Suite 205, Denver, CO 80216 | www.nv5.com

ADDENDUM #1:

Construction Manager/General Contractor Services

Prepared for Fire Station No. 3

Big Sky Fire Department Big Sky, Montana

August 12 | 2024

Big Sky Fire Department | Fire Station No. 3 ADDENDUM #1: Request for Qualifications | CM/GC Services August 12 | 2024

Copyright 2024 | NV5, Inc. Page 2 | 2

List of Revisions to the Request for Qualifications

1. Page 6, § 9.2.b. Minimum Limits: Minimum limit amount changed to $1,500,000.00

2. Page 6, § 9.3.a-c Workers’ Compensation and Employers’ Liability: Remove section a-c an add limited Worker’s Comp language from L. Certain.

3. Page 7, § 9.5. Pollution Liability: Remove

4. Page 14, § 17.3: Clarification of Montana code on immigration law considerations.

List of Updated / New Documents added to the solicitation

UPDATED: Request for Qualifications: Construction Manager/General Contractor Services

DRAWINGS & SPECIFICATIONS: 100% Design Development Documents:

Drawings, Project Manual, Lighting Cutsheets, and Equipment Cutsheets

Exhibit E: AIA Document A133-2019 Standard Form of Agreement Between Owner and Construction Manager as Constructor, where the basis of payment is the Cost of Work Plus a Fee with a Guaranteed Maximum Price

Exhibit F: AIA Document Guaranteed Maximum Price (AIA Exhibit A)

Exhibit G: AIA Document Insurance and Bonds (AIA Exhibit B)

Exhibit H: AIA Document A201-2017 General Conditions of the Contract for Construction

Exhibit I: Owner required Payment form

Exhibit J: Owner required Performance Bond form

END OF ADDENDUM #1: REQUEST FOR QUALIFICATIONS

CM/GC SERVICES

BIG SKY FIRE DEPARTMENT, FIRE STATION NO. 3