2-TB2708-EX - Attachment B - EHS Baseball Field Perimeter Landscaping - Specifications.pdf
PDF 1 MB Posted
- Solicitation number
- TB2708-EX
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
Summary
This is a specification document for the East High School Baseball Field Perimeter Landscaping project issued by the Salt Lake City School District. The project encompasses comprehensive xeriscape upgrades to the perimeter area surrounding the East High School baseball field, including underground irrigation system installation, soil preparation, turf sodding, and landscape plantings. The specifications detail work requirements across multiple disciplines: irrigation systems with mainline and lateral piping, control valves, automatic controllers, sprinkler heads, and drip irrigation components; soil preparation including amendments and fertilizers; and turf installation using bluegrass sod. A mandatory pre-bid site visit is scheduled for September 4, 2026 at 9:00 A.M., and contractors who do not attend will be ineligible to bid. The contract will be awarded as a single unit price contract, and the selected contractor must maintain an active S330 or B100 contractor's license. A performance and payment bond equal to 100% of the contract value is required, along with bid security of at least 5% of the total bid amount.
The specifications require contractors to submit detailed product data, sample materials, certifications for bluegrass sod and topsoil testing, as-built drawings with GPS coordinates, and record documentation in CAD format. Key products specified include Schedule 40 and Class 200 PVC piping, Harco ductile iron fittings, an existing Hydro Point WeatherTrak Pro3 controller, Hunter quick couplers, and specific soil amendments such as composted soil conditioner meeting EPA Class A standards. Liquidated damages of $500 per calendar day apply for project delays beyond the completion date. The contractor assumes full responsibility for on-site field adjustments due to discrepancies between existing conditions and proposed plans, with the design firm held harmless for such variances. A one-year warranty period includes system adjustments, plant establishment monitoring, winterization coordination, and two visual inspections during the growing season to verify proper irrigation coverage and plant health.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salt Lake City School District
East High School Baseball Field Perimeter Landscaping
March 20, 2025
Prepared By:
Salt Lake City School District East HS Baseball Field
BIDDING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
00 11 16 INVITATION TO BID
00 21 13 INSTRUCTIONS TO BIDDERS
00 41 43 BID FORM
00 43 13 BID BOND
00 43 36 SUBCONTRACTOR AND SUPPLIER REPORT
00 45 13 CONTRACTOR’S PROJECT REFERENCE FORM
00 45 43 BIDDER STATUS REPORT
CONTRACTING REQUIREMENTS
AGREEMENT FORMS
BONDS AND CERTIFICATES
OTHER FORMS
CONDITIONS OF CONTRACT
PROJECT SPECIFICATIONS
SUPPLEMENTAL SPECIFICATIONS
PROJECT SPECIAL PROVISIONS
Salt Lake City School District 00 01 15 - 1 East HS Baseball Field
DOCUMENT 00 01 15
LIST OF DRAWINGS
Sheet
No. Title
General
L000 Cover Sheet
Site
LS100 Overall Site Plan
LS501 Site Notes and Details
Planting
LP100 Overall Planting Plan
LP501 Planting Details
Irrigation
IR100 Overall Irrigation Plan
LI501 Irrigation Notes and Schedules
LI502 Irrigation Details
END OF LIST OF DRAWINGS
SUMMARY OF WORK 01 11 13
Salt Lake City School District 01 11 13-1 East HS Baseball Field
SUPPLEMENTAL SPECIFICATION
SECTION 01 11 13
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
A. Work of this Construction Contract comprises work under any, all, or any number of the schedules described in the Contract Documents as awarded to the Contractor.
1.2 CONTRACT METHOD
A. Construct the Work under a single unit price contract.
B. Employ subcontractor[s] assigned by OWNER for: Not Applicable
C. Relations and responsibilities between CONTRACTOR and any
Subcontractors assigned by OWNER shall be as defined in the Conditions of the Contract. Assigned Subcontractors shall, in addition:
1. Furnish to CONTRACTOR bonds covering faithful performance of subcontracted work and payment of all obligations there under [when CONTRACTOR is required to furnish such bonds to owner.]
2. Purchase and maintain liability insurance to protect CONTRACTOR from claims for not less than the limits of liability which CONTRACTOR is required to provide to OWNER.
1.3 WORK BY OTHERS
A. Work of the Project [which will be] executed prior to start of Work of this
Construction Contract, and which is specifically excluded from this Contract:
Not Applicable
B. Work of the Project which will be executed during or after completion of Work of this Construction Contract, and which is specifically excluded from this Contract:
Salt Lake City School District 01 11 13-2 East HS Baseball Field
1.4 FUTURE WORK
1.5 WORK SEQUENCE
A. Liquidated Damages: Article 2.4 of the Agreement (Document 00 52 43).
1.6 CONTRACTOR USE OF PREMISES
A. CONTRACTOR shall limit use of premises [for Work, for storage, and for access,] to allow:
B. Coordinate use of premises under direction of OWNER.
C. Assume full responsibility for protection and safekeeping of products under this Construction Contract.
D. Obtain and pay for use of additional storage or work areas needed for operations under this Construction Contract.
1.7 OWNER OCCUPANCY
A. Not Applicable
1.8 PARTIAL OWNER UTILIZATION
A. All areas of the site outside of the project area as shown in site plan.
1.9 PRE-ORDERED PRODUCTS
A. Not Applicable
1.10 OWNER-FURNISHED PRODUCTS
A. Not Applicable
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
Salt Lake City School District 01 11 13-3 East HS Baseball Field
END OF DOCUMENT
UNDERGROUND IRRIGATION SYSTEMS 32 84 00
Salt Lake City School District 32 84 00-1 East HS Baseball Field
SECTION 32 84 00
UNDERGROUND IRRIGATION SYSTEMS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Supplemental General Conditions and Special Provisions, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Trenching and stockpiling excavation materials and refilling trenches.
2. Installation of complete irrigation system including but not limited to point of connection, meter, filters, piping, valves, fittings, emitters, controllers, and wiring and final adjustments to insure complete coverage.
3. Water connections.
4. Clean up, inspection, and approval.
5. Testing.
B. Related Sections include the following:
1. Section 32 92 00 Turf and Grasses
1.3 DEFINITIONS
A. Finish Grade: Elevation of finished surface of planting soil.
B. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill immediately beneath planting soil.
C. Mainline: The system of pipes that carry water from the Point of Connection (POC) to the valves.
D. Lateral Lines: The system of pipes that carry the water from the valves to the sprinkler heads or emitters.
E. Point of Connection (POC): The point at which the Contractor will tie into the water supply.
Salt Lake City School District 32 84 00-2 East HS Baseball Field
F. Water Supply: Culinary or secondary piping and components furnished and installed by others to provide irrigation water to the Project.
1.4 SUBMITTALS
A. Product Data: Manufacturer’s cut sheets for each type of product indicated. Cut sheets shall be submitted electronically via email in PDF format.
B. Some irrigation materials specified are manufacturer-specific, however, each bidding contractor may request substitutes for any parts of the irrigation system. This submittal shall be made during the bid process as per specs. All materials different than what is specified shall be approved in writing prior to bid submission. If submittals are not provided and approved per specs, the contractor shall use the specified manufacturers for all irrigation components.
C. Parts lists for operating elements of the system.
D. As-Built Drawings: Red-lined plan layout and details illustrating mainline and lateral lines location, size, and assembly. Include type and coverage of heads, type of valves, controllers, fittings, and accessories.
E. Operation and Maintenance Data:
1. Instructions covering full operation, care, and maintenance of system and controls and manufacturer’s printed literature on operation and of system. Include winterizing, controller program worksheet, and annual service and scheduling calendar based on local site specific conditions.
2. Instruct maintenance personnel in proper adjustment of sprinkler heads and use of special tools for adjustments.
3. Provide one controller chart for each automatic controller installed.
a. Show area covered by each controller on print of “as-built” system.
b. Identify area of coverage of each remote control valve, using a distinctively different color, drawing over the entire area of coverage.
c. Hermetically seal charts between two layers of 20 mm thick plastic.
d. Complete charts and review prior to final review of irrigation system.
e. Closeout:
F. Record Drawings:
Salt Lake City School District 32 84 00-3 East HS Baseball Field
1. As installation occurs, contractor shall prepare accurate CAD record drawings which will be given to the Landscape Architect at the substantial completion meeting. The Landscape Architect will review the record drawing and give it to the Owner. The following needs to be included on the CAD record drawing produced by the contractor:
a. Detail and dimension changes made during construction.
b. Significant details and dimensions not shown in original
Contract Documents.
c. Field dimensioned locations of valve boxes, manual drains, quick-coupler valves, isolation valves, control wire runs not in mainline ditch, and both ends of sleeves.
d. Take dimensions from permanent constructed surfaces or edges located at or above finish grade.
e. Take and record dimensions at time of installation.
f. In addition to the CAD record drawing, all valves, heads, both ends of sleeves, all boxes, wire conduit path, drains, etc. shall have a recorded GPS point. An electronic copy and hard copy of this GPS information shall be given to the Owner at the substantial completion meeting. Consult the Owner for the exact format/file type for the electronic version. In-Site Design Group cannot provide this service so if the contractor does not have the ability to do this themselves, they will need to hire a surveyor to perform this task.
2. If the landscape contractor installing the irrigation system does not have CAD capabilities, they may contact the landscape architect of record for a bid to convert their redlined as-built into a CAD record drawing. The contractor may also solicit bids for this service from other Landscape Architects or CAD drafters. The landscape contractor is responsible for paying the fee for this service as part of their base landscape/irrigation bid.
3. The Contractor shall reduce copy of the record drawings to half-size, color all circuits, and laminate both sides with 5 mil thick or heavier plastic and give to Owner at project close-out.
G. Keys:
1. Quick Coupler Key: Quick Coupler Key with Swivel Head for operation of quick couplers.
2. Stop and Waste Valve Key: “T” handle, rigid steel, 5 ft long minimum, key end to fit the stop and waste valve nut.
3. Gate Valve Key: “T” handle, rigid steel, 5 ft long minimum, square nut end to fit the gate valve nut.
Salt Lake City School District 32 84 00-4 East HS Baseball Field
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Use only trained personnel familiar with required irrigation system installation procedures.
2. Perform installation under direction of foreman or supervisor with five years minimum experience in sprinkling system installations.
B. Regulatory Requirements: Work and materials shall be in accordance with latest rules and regulations, and other applicable state or local laws. Nothing in Contract Documents is to be construed to permit work not conforming to these codes. Contractor shall apply for all permits and pay for the same. Please check all necessary building codes and other local codes and ordinances for proper installation of all project components including electrical work for controller(s). Provide documentation from governing authority as required by Architect.
C. Pre-Installation Conference: Schedule pre-installation conference with owner and landscape architect before irrigation system installation begins.
D. Weekly (or as deemed necessary by Landscape Architect and/or owner) job site inspections and/or coordination meetings will be held throughout the construction process. Contractor is required to attend all site construction meetings with Owner and Architect.
E. Do not cut or trench through any roots 1-1/2” and larger. Hand excavate within the dripline of all existing trees and other plants noted to remain.
F. Insert a dielectric union wherever a copper-based metal (copper, brass, bronze) and an iron-based metal (iron, galvanized steel, stainless steel) are joined together.
G. Contractor shall perform pressure test at irrigation point of connection prior to installation of irrigation system. If static pressure is higher or lower than 80 psi for the system, then Landscape Architect shall be notified immediately to determine if some redesign of the system and/or pump station is necessary.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Deliver, unload, store, and handle materials, packaging, bundling, and products in dry, weatherproof, waterproof condition in manner to prevent damage, breakage, deterioration, intrusion, ignition, and vandalism.
Deliver in original unopened packaging containers prominently displaying manufacturer name, volume, quantity, contents, instructions, and
Salt Lake City School District 32 84 00-5 East HS Baseball Field conformance to local, state and federal law. Remove and replace cracked, broken or contaminated items or elements prematurely exposed to moisture, inclement weather, temperature extremes, fire and/or jobsite damage.
B. Storage:
1. Protect materials from damage and prolonged exposure to sunlight.
Materials shall be stored in areas designated by the Owner.
C. Handling:
1. Materials: Except for bulk deliveries, materials shall not be dropped or dumped from vehicles. All material shall be handled by Contractor with care to avoid breakage or damage. Damaged materials attributed to the Contractor shall be replaced with new material at the Contractor’s expense.
2. Handling of PVC Pipe - Exercise care in handling, loading, and storing of PVC pipe. Transport all PVC pipe in a vehicle that allows length of pipe to lie flat so as not to subject it to undue bending or concentrated external loads. Discard all sections of pipe that have been dented or damaged and, if installed, replace with new piping at the Contractor’s expense.
1.7 SCHEDULING
A. The Contractor shall familiarize himself with all hazards and utilities prior to work commencement. Install sleeving prior to installation of concrete, paving or other permanent site elements. The irrigation system Point of Connection components, backflow prevention or filtration, and pressure regulation devices shall be installed and operational prior to all downstream components. All main lines shall be thoroughly flushed of all debris prior to the installation of Remote Control Valves. All lateral lines shall be thoroughly flushed of all debris prior to the installation of any sprinkler heads. The Irrigation Contractor shall be required to submit a detailed Construction Schedule to the Owner prior to commencement.
The schedule shall be updated weekly.
B. The contractor shall schedule and organize work to minimize impact on project usage during public hours. The contractor shall confine work efforts to areas or zones which he can reasonably fence or protect, rather than spreading out trenching or other tasks across large areas of the site. Contractor shall schedule his work to reduce or eliminate open trenches at the end of each work day.
Salt Lake City School District 32 84 00-6 East HS Baseball Field
C. Weather Limitations: Proceed with irrigation installation only when existing and forecasted weather conditions permit.
1.8 WARRANTY
A. Standard one year guarantee shall include:
1. Filling and repairing depressions and replacing plantings due to settlement of irrigation system trenches.
2. Adjusting system to supply proper coverage of areas to receive water. Remove or add (even though these additions or deletions may not be shown on the plans) additional sprinklers, valves, piping, tubing and emitters as may required so that over or under watering does not occur.
3. Provide at least two visual inspections (during the 1 year warranty and maintenance period) of project during normal growing season to monitor and make sure plants are not being over or under watered. Prepare and file a report of findings to Landscape Architect and Owner. Make adjustments to system based on findings at no additional cost to Owner including reprogramming of controller(s) and adjusting quantity and size of emitters/nozzles if necessary.
4. Repair and replace any damaged and/or malfunctioning part of the irrigation system.
5. Ensuring system can be adequately drained and winterized including freezing pumps, filters, backflow preventor, etc.
6. Coordinate with owner if additional information is required to provide winterization and spring start-up directions for the entire system during the first year of operation.
PART 2 - PRODUCTS
2.1 PIPES AND FITTINGS
A. Types of Pipes:
1. Supply Line – from Point of Connection through backflow preventer
– existing.
2. Mainline 3” or smaller – downstream of POC – Schedule 40 PVC.
3. Mainline 4” or larger – downstream of POC - Class 200 Gasketed
PVC.
4. Lateral – Schedule 40 PVC.
5. Drip Tubing – Not Applicable
B. Pipe
Salt Lake City School District 32 84 00-7 East HS Baseball Field
1. Plastic Pipe Sch. 40 PVC and Class 200 PVC – Identify all pipes with the following indelible markings:
a. Manufacturer’s name.
b. Nominal pipe size.
c. Schedule of class.
d. Pressure rating psi.
e. National Sanitation Foundation (NSF) seal of approval.
f. Date of extrusion.
C. Types of Fittings:
1. Mainline Fittings smaller than 3” – Schedule 80 PVC.
2. Mainline Fittings 3” or larger – Harco ductile iron (restrain per manufacturer’s recommendations).
3. Lateral Fittings – Schedule 40 PVC.
4. Drip Fittings – Not Applicable
2.2 VALVES
A. Stop & Waste Valve – Per Plans.
B. Mainline Isolation Valve – Per Plans.
C. Master Valve – Per Plans.
D. Flow Sensor – Per Plans.
E. Manifold Isolation Valve – Per Plans.
F. Remote Control Valve(s) – Per Plans.
G. Manual Drain Valve – Per Plans.
2.3 BACKFLOW PREVENTER
A. Reduced Pressure Backflow Assembly – Existing.
2.4 AUTOMATIC CONTROLLER
A. Existing Hydro Point WeatherTrak Pro3-C-H2048-SPT CONTROLLER
2.5 DRIPLINE
A. Per Plans
Salt Lake City School District 32 84 00-8 East HS Baseball Field
2.6 DRIP FLUSH VALVE
A. Per plans
2.7 VALVE BOX
A. Install control valves in manifolds/boxes per District standards.
B. Use round valve box for quick coupler. Boxes and lids in lawn areas shall be GREEN in color. Boxes and lids in Bark and Rock Mulch areas shall be TAN in color.
2.8 WIRE
A. Wire connecting valves to the automatic controller shall be 14 AWG wire for direct burial. Common, hot, & spare wires shall be white, red, & yellow, respectively. For control wire runs exceeding 3000 feet or common wire runs exceeding 1500 feet, use 12 AWG wire.
1. Make all connections with 3M-DBRY to make a waterproof connection.
2. Install wire in 1” conduit. Bury wires in the same trench as the pipe where possible.
3. Make all connections with 3M-DBRY to make a waterproof connection.
B. Wire connecting flow sensor to the automatic controller shall be Paige Electric PE-39-3 Cable.
1. Install wire in 1” grey electrical conduit. Bury wires in the same trench as the pipe where possible.
2. Make all connections with 3M-DBRY to make a waterproof connection.
2.9 QUICK COUPLER
A. Hunter HQ-44LRC
2.10 WASHED AGGREGATE
A. 1-1/2” maximum with 100 percent retained on a No. 4 sieve.
2.11 JOINT AND SOLVENT CEMENT
A. Primer: Weld-On P-70 Primer.
Salt Lake City School District 32 84 00-9 East HS Baseball Field
B. PVC Solvent Cement: Weld-On 711 Low VOC Cement.
2.12 TEFLON TAPE
A. Use quality grade, domestically made 0.004 inch ( 0.001) on threaded joints.
2.13 SLEEVES
A. Class 200 PVC.
B. Install one pipe per sleeve. Sleeve diameter shall be two (2) times larger than pipe installed in sleeve. Minimum 4” for all sleeves.
C. Install wiring in separate sleeve from irrigation pipe.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas to receive irrigation to ensure areas are ready and properly prepared. Receive approval by Owner before staking or installation of any irrigation system begins.
B. Contractor shall field verify all existing and proposed utilities, trees, plants, buildings, structures, roads, curb and gutter, sidewalks, irrigation system, utilities, easements, setbacks, Right-of-ways, etc. to make sure no conflicts exist between existing conditions and proposed plans.
Contractor shall be responsible to make on-site field adjustments as may be required due to discrepancies found during construction. Because a survey of current conditions was not completed as part of this project, the Contractor and Owner agrees to hold blu line design harmless for any and all such discrepancies including costs associated with such discrepancies, including repair, replacement or anything related to such discrepancies.
3.2 EXCAVATION
A. Stake pipe and equipment locations as follows:
1. Mark routing of pressure supply line and flag remote control valves for first few zones. Contact Owner’s Representative a minimum of 48 hours in advance and request review of staking. Owner’s Representative will review staking and direct changes if required.
Salt Lake City School District 32 84 00-10 East HS Baseball Field
2. Because this project has significant topography that could require alteration of irrigation equipment layout as deemed necessary by Owner, do not install irrigation equipment in these areas until the Landscape Architect and/or Owner’s Representative has reviewed equipment staking.
3. Location of heads and piping shown on Drawings is approximate.
Actual placement may vary slightly as is required to achieve full, even coverage without spraying onto buildings, sidewalks, fences, etc. Contractor shall install additional pipe as necessary for complete and proper installation of system.
4. Minor adjustments in system layout will be permitted to avoid existing fixed obstructions.
5. Make certain changes from Contract Documents are shown on record drawings.
B. Trenching - Dig trenches straight and support pipe continuously on bottom of trench. Clean trench bottom and smooth by removing all rock and organic debris. Remove rocks larger than 1-1/2” in any direction from bottom of trench. Separate out rocks larger than 1-1/2 inch in any direction uncovered in trenching operation from excavated material and remove from areas to receive landscaping and then remove from site at no additional cost to the Owner. All extra excavated material from irrigation installation shall be hauled off-site at no additional cost to the Owner.
a. Clearances:
1) Piping Smaller than 3 Inches - Minimum width of 7 inches for trenches.
2) Line Clearance - Provide not less than 6 inches of clearance between each line.
b. Pipe and Wire Depth:
1) Mainline Piping – 18 inches from top of pipe.
2) Lateral Piping – 12 inches from top of pipe.
3) Control Wiring – Side of mainline piping (in conduit).
C. Excavate trenches for sprinkler system pipe to provide 18 inches of cover over mainlines and 12 inches over lateral lines.
1. Do not damage roots where trenching is required in proximity to trees that are to remain.
D. Appropriately cover, protect, and mark trenches along pedestrian routes that are left open overnight. Do not cover pressure main, irrigation pipe, or fittings until Landscape Architect or Owner has inspected and approved system.
3.3 INSTALLATION
Salt Lake City School District 32 84 00-11 East HS Baseball Field
A. General: Plans are diagrammatic. Proceed with installation in accordance with the following:
1. Install stop and waste valve and other equipment required by local authorities according to Utah Laws and Regulations to make system complete.
2. Install main line, automatic control valves, lateral lines, fittings, and heads/drip line as specified.
3. Thoroughly flush main lines before installing automatic control valves, and laterals before installing sprinklers. Flush supply lines thoroughly before installing backflow preventers or other regulating devices.
B. Piping: Assemble all mainline and lateral lines in accordance with manufacturer’s recommendations.
1. Install PVC pipe in dry weather above 40 degrees F as specified by manufacturer's recommendations. Allow joints to cure a minimum of 8 hours before testing.
2. Snake pipe in trench as much as possible to allow for expansion and contraction. When pipe laying is not in progress, or at end of each day, close pipe ends with tight plug or cap. Perform work in accordance with good practices prevailing in irrigation industry.
1. Shield pipe from direct sunlight so that expansion and contraction do not affect the integrity of glued fittings. Temperature swings from daytime to night time can cause pipe to completely pull out of glued fittings. Consult with the manufacturer for proper shielding of PVC pipe before installation and provide the Owner with the proposed method for shielding the piping.
2. Ensure that mainline and lateral lines don’t conflict with utilities, fire hydrants, light poles, underground sumps or storm drain and downspout piping or other utilities. Refer to civil and electrical plans for locations of these utilities. Re-route mainline and lateral lines as necessary to avoid these and all other utilities.
3. Locate no sprinkler head closer than 6 inches from building foundation. Heads immediately adjacent to mow strips, walks, or curbs shall be one inch below top of mow strip, walk, or curb and have 4 inches clearance between head and mow strip, walk, or curb.
4. Insert a dielectric union wherever a copper-based metal (copper, brass, bronze) and an iron-based metal (iron, galvanized steel, stainless steel) are join
5. Cut plastic pipe square. Remove burrs at cut ends before installation so unobstructed flow will result.
6. Make solvent weld joints as follows:
a. Do not make solvent weld joints if ambient temperature is below 45 deg F.
b. Clean mating pipe and fitting with clean, dry cloth and apply one coat of P-70 primer to each.
Salt Lake City School District 32 84 00-12 East HS Baseball Field
c. Apply uniform coat of 711 solvent to outside of pipe.
d. Apply solvent to fitting in similar manner.
e. Give pipe or fitting a quarter turn to insure even distribution of solvent and make sure pipe is inserted to full depth of fitting socket.
f. Allow joints to set at least 24 hours before applying pressure to PVC pipe.
7. Tape threaded connections with teflon tape.
C. Sleeving:
1. Contractor to directionally bore sleeves per as needed.
2. Coordinate location of all sleeving prior to installation.
3. For sleeving under roadways install sleeving below the depth of the aggregate sub-base.
4. Install sleeving under asphalt paving and concrete walks to accommodate piping and wiring. Compact backfill around sleeves to prevent settling. Patch and repair asphalt and concrete damaged (if any) during sleeving installation including excavation, backfill, compaction, road base or gravel, concrete, asphalt, cutting and/or boring, etc. These costs shall be part of the base bid.
5. Cover sleeve ends until pipes and wires are installed to keep sleeve clean and free of dirt and debris.
D. Joint Restraint Harness:
1. Install joint restraint harness in the manner recommended by the manufacturer, in accordance with the drawings and manufacturers specifications and in accordance with accepted industry practices.
E. Thrust Blocks and Pipe Supports: Portland cement design mix, 3000 psi minimum, with 0.58 maximum water-cementitious materials ratio:
1. Install thrust blocks per details.
2. Use a form to provide the appropriate amount and shape of concrete for the thrust block. Do not cover the fitting with concrete.
The entire fitting must be serviceable when the thrust block is installed.
3. Wrap fittings with plastic that can form to fitting prior to installing concrete to aid in fitting replacement if needed.
F. Control Valves:
1. Install at plan locations and according to detail. Use Schedule 80
PVC pipe for nipples on valve header, length as necessary. Install valves, one maximum per box, plastic valve box and provide 12 inches of expansion loop slack wire at all connections inside valve box.
Salt Lake City School District 32 84 00-13 East HS Baseball Field
2. Arrange valve stations to operate in an easy-to-view progressive sequence around project site. Tag valves with waterproof labels showing final sequence station assignments.
G. Quick Coupling Valves: Install using 1 inch pre-assembled swing joints as detailed. Locations as indicated on plans.
H. Valve Access Boxes:
1. Install over all automatic control valves, manual control valves, pressure regulators or zone shutoff valves and sized to provide adequate room for maintenance.
2. Install valve boxes 1” above finish grade and place parallel or perpendicular to adjacent curbs, sidewalks, or driveways.
3. Imprint a valve control number on each valve box cover that corresponds to the valve controller clock. Imprint the valve box number a minimum of one inch high in a permanent and legible manner.
1. Place washed aggregate in sump as shown on plans. Place 3 inches minimum of pea gravel below bricks supporting valve boxes to drain box. Set valve boxes over valve so all parts of valve can be reached for service. Set cover of valve box even with finish grade. Valve box cavity shall be reasonably free from dirt and debris.
2. Arrange valve stations to operate in an easy-to-view progressive sequence around project site. Tag valves with waterproof labels showing final sequence station assignments
3. Do not install valve boxes within field of play of ballfield.
I. Automatic Controller:
1. Mount the panel enclosure so the operator can conveniently make adjustments.
2. Properly ground controller in accordance with Utah Laws and
Regulations and per manufacturer's requirements. Make all control wire connections to automatic controllers. Coordinate controller installation with electrical work.
3. Provide a laminated copy of the irrigation plan indicating valve station numbers and field locations and attach it inside the controller.
4. Program the controller to provide the appropriate amount of water for each station.
5. Supply the Owner with manufacturer's warranties and operating instructions for the controller.
6. Connect remote control valves to controller in numerical sequence as shown on Drawings.
Salt Lake City School District 32 84 00-14 East HS Baseball Field
J. Solvent Weld PVC Pipe - Lay pipe and make all plastic-to-plastic joints in accordance with solvent manufacturer's recommendations.
K. Control Wiring:
1. Low Voltage Wiring:
a. Install wiring in 1” conduit.
b. Bury conduit and control wiring between controller and electric valves in mainline trenches, or in separate trenches.
c. Make control wire connections and splices with 3M direct bury splice connectors, or approved equal.
d. Install all control wire splices not occurring at control valve in a separate splice valve box, 10” round minimum size.
L. Sprinkler Heads:
1. Before installation of sprinkler heads, open control valves and use full head of water to flush out system.
2. Set sprinkler heads and quick-coupling valves perpendicular to finish grade.
3. Do not install sprinklers using side inlets. Install using base inlets only, unless approved otherwise in writing by Landscape Architect.
a. Set sprinkler heads 2” away from existing walks, curbs, and other paved areas and to grade.
M. Valves - Install where shown on Drawings as detailed.
3.4 TESTING
A. Before backfilling main line, conduct piping tests before joints are covered, and after thrust blocks have sufficiently hardened (or mechanical joint restraints are in place). Fill pipeline with water 24 hrs prior to testing, and apply hydrostatic test pressure to stabilize system.
Test pressure at 150 psi minimum for 3 hours minimum and make certain there are no leaks. Notify Landscape Architect and owner 3 working days minimum before conducting the test.
1. Provide Photo documentation to owner and landscape architect of pressure testing with the photos clearly marked with a time stamp showing, indicating the pressure test has been completed per specifications.
B. Test connections for leaks prior to backfilling and repair all leaks. Lateral lines may be tested in sections to expedite backfilling work.
3.5 BACKFILL OPERATION
Salt Lake City School District 32 84 00-15 East HS Baseball Field
A. Bed all pipe a minimum of 2 inches, surrounding the pipe with native material excavated from the trench and passing through a ½ inch sieve, or imported sand.
B. Prevent soil, rocks, or debris from entering pipes or sleeves.
C. Compact backfilled trenches thoroughly to prevent settling damage to grades or plant materials. Repair irrigation system and plants at no additional cost to Owner.
D. Do not begin backfilling operations until required system tests have been completed. Leave trenches slightly mounded to allow for settlement after backfilling is completed. Finish grade trenches prior to walk-through of system by Owner.
1. Materials - Excavated material is generally considered satisfactory for backfill purposes. Remove from backfill material all rubbish, organic matter, and stone larger than 2 inches in maximum dimension. Do not mix subsoil with topsoil. Haul away all material not suitable for backfill. If excavated material is unacceptable or not sufficient to meet backfill, compaction and final grade requirements Contractor is responsible for providing suitable backfill.
2. Do not leave trenches open for a period of more than 48 hours.
Protect open excavations in accordance with OSHA regulations.
3.6 IRRIGATION INSTALLATION INSPECTION
A. Examine areas and conditions under which Work of this Section is to be performed. Do not proceed with inspection walk-through until unsatisfactory conditions have been corrected.
B. Completely install entire system and ensure proper operation prior to scheduling of walk-through.
C. Notify Owner a minimum of 48 hours prior to walk-through.
D. Remotely operate each zone in for Owner’s Representative at time of walk-through.
E. Contractor to generate a list of items to be corrected.
F. Furnish materials and perform Work required to correct all inadequacies at no additional cost to Owner.
G. During walk-through, expose all drip emitters outlets for observation by Owner’s Representative to demonstrate that they are performing and installed as designed. Schedule separate walk-through if necessary.
Salt Lake City School District 32 84 00-16 East HS Baseball Field
H. Adjusting
1. Upon completion of installation, "fine-tune" entire system to provide optimum and efficient coverage. Adjustments to be performed prior at no additional cost to Owner.
2. Immediately correct areas that do not conform to designated operation requirements due to unauthorized changes or poor installation practices at no additional cost to the Owner.
3. Adjust sprinkler heads to proper grade when turf is sufficiently established to allow walking on it without appreciable harm. Such lowering and raising of sprinkler heads shall be part of original contract with no additional cost to Owner.
4. Adjust sprinkler heads for proper distribution and trim so spray does not fall on buildings. Adjust sprinkler heads for proper distribution and trim so that spray is minimized on sidewalks or parking areas.
3.7 CLEANUP
A. Promptly remove soil and debris created by any work from paved areas.
Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.
B. Upon completion of work, remove from the site all machinery, tools, excess materials, excess excavated soils, rock and other debris and rubbish at no additional cost to the Owner. In addition, contractor shall sweep, clean, power wash, etc. all areas of construction as may be required to leave the site clean.
3.8 FINAL INSPECTION
A. At the end of installation the site shall be returned to the pre-construction state. The Contractor shall call for a final inspection of the sprinkler irrigation system. There shall be five (5) business days notice given, in writing, to the Owner and Landscape Architect, prior so that the appropriate people may attend.
B. Prior to that time, all heads shall have been adjusted to their proper pattern, radii, and height. The system will have been flushed out, checked for operation, and any defects corrected. A final list of items found in need or correction (if any), will be made and the Contractor shall correct them. Upon acceptance of the system, the Owner shall assume all responsibility for the system.
END OF SECTION
SOIL PREPARATION 32 91 13
Salt Lake City School District 329113 - 1 East HS Baseball Field Perimeter Landscaping
SECTION 32 91 13
SOIL PREPARATION
PART 1 - GENERAL
1.1 SUMMARY
A. Includes But Not Limited To:
1. Perform soil preparation work as described in Contract Documents.
2. Furnish and apply soil additives as described in Contract Documents.
B. Related Sections:
1. Section 32 9119 Topsoil Placement and Grading
2. Section 32 9200 Turf and Grasses
3. Section 32 9300 Plants
1.2 REFERENCES
A. Reference Standards:
1. American Society For Testing And Materials:
a. ASTM 1557-02, 'Standard Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort.'
1.3 ADMINISTRATIVE REQUIREMENTS
A. Pre-Installation Conference: Participate in pre-installation conference prior to excavation of existing or import of new topsoil. Provide certifications as stated in section 32 9119 and submittals of any product data, and samples as listed below at this pre-installation conference.
1.4 SUBMITTALS
A. Action Submittals:
1. Product Data: Product literature and chemical / nutrient analysis of soil amendments and fertilizers.
2. Samples: Sample of soil conditioner for approval before delivery to site.
Include product analysis list.
B. Quality Assurance/Control
Salt Lake City School District 329113 - 2 East HS Baseball Field Perimeter Landscaping
1. Submit test on imported topsoil by licensed laboratory before use. Topsoil report to include recommended fertilizers for shrubs and turf areas, recommended amendments such as gypsum, recommended quantities of organic matter to be added to the soil, and recommended long term fertilizing. Imported topsoil shall meet minimum specified requirements and be approved by Architect before use.
2. Informational Submittals:
1. Installer Reports: Delivery slips indicating amount of soil conditioner delivered to Project site.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Incorporate following amendments, fertilizers and Soil conditioners into topsoil:
a. Acceptable Fertilizers And Application Rates:
1) Spread 30-10-0 fertilizer at label rate and 0-0-0-15 fertilizer at label rate.
2) Equal as approved by Architect before installation.
b. Acceptable Soil Conditioners And Application Rates:
1) Type One Acceptable Product.
a) Composted Soil Pep 3/8” minus from Mountain West Products in Rexburg, Idaho (208) 359-5646 or rbanta@mwpllc.com.
b) “Other’ EPA Class 'A' co-compost or compost with SAR less than 3.0, EC less than 4.0, and CN ratio of 15 to 25:1 passing through 1/2 inch mesh screen or other product approved by Architect before use. See Section 01 6000.
c) After topsoil has been placed in lawn areas, apply one of the above acceptable soil conditioners at a rate of 5 cubic yards per 1000 s.f. for every 5” depth of soil. Till evenly into topsoil to a 5” min. depth.
PART 3 - EXECUTION
3.1 PERFORMANCE
A. Add specified soil amendments at specified rates to lawn areas. Roto-till or otherwise mix amendments evenly into top 5 inches of topsoil. Incorporate and leach soil amendments which require leaching, such as gypsum, within such time limits that soil is sufficiently dry to allow proper application of fertilizer and soil conditioners.
Salt Lake City School District 329113 - 3 East HS Baseball Field
TURF AND GRASSES 32 92 00
Salt Lake City School District 32 90 00-1 East HS Baseball Field
SECTION 32 92 00
TURF AND GRASSES
APWA STANDARD SPECIFICATIONS ARE HEREBY AMENDED TO INCLUDE THE FOLLOWING:
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including Supplemental General Conditions and Special Provisions, apply to this Section.
1.2 SUMMARY
A. This Section includes the following:
1. Sodding.
1.3 DEFINITIONS
A. Finish Grade: Elevation of finished surface of planting soil.
B. Planting Soil: Native soil or surface soil modified to become topsoil;
mixed with soil amendments.
C. Subgrade: Surface or elevation of subsoil remaining after completing excavation, or top surface of a fill or backfill immediately beneath planting soil.
1.4 SUBMITTALS
A. Product Data: For each type of product indicated.
B. Certification of Bluegrass Sod: From sod producer - each grass-seed monostand or mixture stating the botanical and common name and percentage by weight of each species and variety, and percentage of purity, germination, and weed seed. Include the year of production and date of packaging.
1. Certification of sod mixture for turfgrass, identifying source, including name and telephone number of supplier.
2.
3.
Salt Lake City School District 32 90 00-2 East HS Baseball Field
C. Product Certificates: For soil amendments and fertilizers, signed by product manufacturer.
1.5 QUALITY ASSURANCE
A. Preinstallation Conference: Conduct conference at Project site as requested by the Owner.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Storage:
1. Materials shall be stored in areas designated by the Owner.
2. Fertilizers and other soil amendments shall be stored in cool, dry locations away from contaminants.
3. Chemical treatment materials shall not be stored with other landscape materials.
B. Handling:
1. Materials: Except for bulk deliveries, materials shall not be dropped or dumped from vehicles.
1.7 SCHEDULING
A. Planting Restrictions: Coordinate planting periods as follows:
1. No sodding operations shall take place if ground is muddy, standing water present, frozen, snow covered.
2. Sod installation- March 15th to October 15th or until ground is frozen.
B. Weather Limitations: Proceed with planting only when existing and forecasted weather conditions permit.
1.8 FINAL ACCEPTANCE
A. Final Acceptance shall be issued to the Contractor for Sod areas per the following procedures:
1. The Owner will perform a final walk through to judge the completeness and quality of sod repair installation. This will include evaluating layout and location, health of grass, finished grading, etc.
2. The Owner will provide a Punch List of items for the Contractor to remedy.
3. The Contractor shall notify the Owner when all punch list items are complete.
Salt Lake City School District 32 90 00-3 East HS Baseball Field
4. A Verification Walk will be performed by the Owner to verify all punch list items are adequately completed.
5. Based on a successful Verification Walk, the Owner will issue Final Acceptance to the Contractor and will take over all maintenance and care of sod.
6. If Substantial Completion is achieved after October 15th, the Verification Walk and Final Acceptance will occur the following spring. The Contractor will be responsible to maintain the sod repair areas through the winter as required.
1.9 WARRANTY
A. Special Warranty: Warrant the sod, for the warranty of 30 days after verification walk against defects including death and unsatisfactory growth, except for defects resulting from lack of adequate maintenance, neglect, or abuse by Owner, or incidents that are beyond Contractor's control.
Salt Lake City School District 32 90 00-4 East HS Baseball Field
PART 2 - PRODUCTS
2.1 SOD
A. Bluegrass Sod: Sod supplied by the Contractor shall be grown by a sod grower, well established, pest and weed free, one (1) and one quarter (1- 1/4”) inches thick, and supplied in rolls or sheets of the industry size. Sod shall be the current year’s crop, guaranteed by the supplier.
2.2 SOIL AMENDMENTS
A. Soil amendments are not required if existing on-site soil is used. If additional soil is needed the below specifications shall be followed.
B. Compost: Dairy based organic compost material. Well-composted, stable, and weed-free organic matter, pH range of 5.5 to 8; moisture content 35 to 55 percent by weight; 100 percent passing through 1-inch sieve; soluble salt content of 5 to 10 decisiemens/m; not exceeding 0.5 percent inert contaminants and free of substances toxic to plantings; and as follows:
1. Organic Matter Content: 35%- 50% percent of dry weight.
2.3 TOPSOIL
A. Imported Topsoil is not required if existing on-site soil is used. If additional soil is needed the below specifications shall be followed.
B. Imported or amended native soil to meet the following:
1. Topsoil Quality Guidelines:
a. pH: 5.5-7.5
b. Soluble Salts dS/m or mmho/cm: <4
c. Sodium Absorption Ratio (SAR): <10
d. Organic Matter %: ≥4.0, <20
e. Sand %: >20, <70
f. Silt %: >20, <70
g. Clay %: >10, <30
h. Texture Class: Loam, Sandy Loam, Silt Loam
2. Topsoil free of:
a. Subsoils
b. Coarse sand and gravel
c. Stiff clay, hard clods, or hard pan soils
d. Rock larger than 1 inch in any dimension
e. Roots larger than 1/2 inch in diameter
Salt Lake City School District 32 90 00-5 East HS Baseball Field
f. Trash, litter, or refuse
g. Noxious weeds and weed seeds
3. Topsoil may contain a maximum of 5 percent rock smaller than 1 inch.
4. Material test reports shall provide amendment recommendations with minimum quality standards and volumes.
2.4 PLANTING ACCESSORIES
A. Selective Herbicides: EPA registered and approved, of type recommended by manufacturer for application.
2.5 FERTILIZER
A. Contact owner’s representative if contractor deems fertilization is needed at any part of the construction process.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine areas to receive sod or seed for compliance with requirements and other conditions affecting performance. Proceed with installation only after unsatisfactory conditions have been corrected.
3.2 PREPARATION
A. Protect structures, utilities, sidewalks, pavements, and other facilities, trees, shrubs, and plantings from damage caused by planting operations.
B. Provide erosion-control measures to prevent erosion or displacement of soils and discharge of soil-bearing water runoff or airborne dust to adjacent properties and walkways.
3.3 SOD BED PREPARATION AND INSTALLATION
A. Limit subgrade preparation to areas to be planted. Install on site topsoil to a 4” depth. If imported planting soil or imported topsoil is required, ensure they meet the requirements of this section.
B. Finish Grading: Grade planting areas to a smooth, uniform surface plane with loose, uniformly fine texture. Grade to within plus or minus 1/2 inch of finish elevation. Roll and rake, remove ridges, and fill depressions to
Salt Lake City School District 32 90 00-6 East HS Baseball Field meet finish grades. Limit fine grading to areas that can be planted in the immediate future.
1. The Installer shall prepare no more ground than can be sodded in a twenty-four (24) hour period. Sod shall be placed within 24 hours of ground preparation. The ground shall be re-prepared if weather or traffic has compromised the friability of the prepared area.
2. No sodding shall be done immediately after a rainstorm or if a prepared surface has been compacted without first loosening the surface to a smooth, loose, uniformly fine texture just prior to sodding.
C. Apply Biosol mix fertilizer at a rate of 33lbs. / 1000 SF. Apply fertilizer directly to fine grade. Remove stones larger than 1 inch in any dimension and sticks, roots, rubbish, and other extraneous matter and legally dispose of them off Owner's property.
1. Delay mixing fertilizer with planting soil if planting will not proceed within a few days.
D. Moisten prepared sod areas before planting if soil is dry. Water thoroughly and allow surface to dry before planting. Do not create muddy soil.
E. Areas where sod is to be laid shall be cut, trimmed, or shaped to receive full width sod (minimum 16”). No partial strips or pieces will be accepted.
F. On site lawn may be cut at a minimum 16” width with a one (1) and one quarter (1/4) inches soil profile. If this option is selected in lieu of importing sod rolls, cut lawn shall be re-laid within 72 hours of being cut, and shall be kept from drying out. Utilization of existing lawn does not release contractor from any other requirements within construction documents.
G. Place sod on prepared surface so that joints between courses are matched against the last line laid.
H. All work shall be done from boards laid on top of the prepared surface or on already laid sod or existing established lawn. Care shall be taken to prevent footprints or other disturbances to the prepared bed. Any such disturbances shall be promptly repaired so that the sod will be laid on a proper bed to ensure the necessary bonding between it and the sod.
I. Sod shall be tamped lightly as each piece is set to ensure that good contact is made between edges and also with the ground. Sod laid on any sloped areas shall be anchored with wooden dowels or other materials which are accepted by the sodding industry. Roll sod immediately after placing using a hand roller half filled with water.
Salt Lake City School District 32 90 00-7 East HS Baseball Field
3.4 CLEANUP AND PROTECTION
A. Promptly remove soil and debris created by any work from paved areas.
Clean wheels of vehicles before leaving site to avoid tracking soil onto roads, walks, or other paved areas.
B. Erect barricades and warning signs as required to protect newly planted areas from traffic. Maintain barricades throughout maintenance period and remove after lawn is established.
C. Remove erosion-control measures after grass establishment period.
D. Maintenance During Lawn Establishment:
1. General: Begin maintenance of the lawn areas immediately after each area is planted and continue until acceptable lawn is established. Maintenance shall include watering, fertilizing, eradicating weeds, mowing, trimming, protecting slopes from erosion, maintaining mulch material, protecting lawn areas from traffic, replanting and other operations. Roll, re-grade, and re-sod bare or eroded areas and re-mulch to provide a uniformly smooth lawn.
2. Repair: Lawn areas shall be re-established as specified herein for eroded, damaged or barren areas.
3. Mowing Installed Sod: Mow sodded areas as soon as top growth is tall enough to cut. Repeat mowing to maintain specified height without cutting more than 33 percent of grass height. Remove no more than 33 percent of grass-leaf growth in initial or subsequent mowings. Do not delay mowing until grass blades bend over and become matted. Do not mow when the grass is wet. Schedule initial and subsequent mowings to maintain the following grass height:
a. Mow grass 3 inches high.
4. Watering: Provide and maintain permanent irrigation system to convey water from sources and to keep lawn uniformly moist to a depth of 4 inches.
a. Schedule watering to prevent wilting, puddling, erosion, and displacement of mulch.
b. Water lawn at a minimum rate of 1 inch per week through establishment period.
5. Lawn Post Fertilization: Apply fertilizer immediately after installation initial mowing and when grass is dry. Water after application.
a. Use a commercial fertilizer 20-20-20+ iron that will provide actual nitrogen of at least 1 lb./1000 sq. ft. to lawn area at a total rate of 5 lbs./1000 sq. ft.. Apply no more than 1 lb./1000
sq. ft. for each application.
6. Chemical Treatment:
Salt Lake City School District 32 90 00-8 East HS Baseball Field
a. When a pest or disease becomes apparent during the Lawn Establishment Period, a state-certified applicator shall apply required chemicals in accordance with EPA label restrictions and recommendations. Hydraulic equipment for the liquid application of chemicals shall be provided with a leak-proof tank, positive agitation methods, controlled application pressure and metering gages. Pre-emergent herbicides will not be used.
b. A Chemical Treatment Plan shall be…
This is the start of the file's text. The full file is on GovTribe.