This is a 100% design document package for the Repair Base Switching Station project at Mountain Home Air Force Base (MHAFB), delivered on October 21, 2025, under Delivery Order FA4897-25-F-0026 against Contract FA4897-20-D-0001. The project encompasses the design and construction of two buildings: Building 1017 (new Power Station/Switching Station) and Building 1406 (Base Switching Station), totaling approximately 2,073 square feet. The design includes comprehensive architectural, structural, mechanical, electrical, fire protection, and civil engineering drawings across 81 sheets covering foundations, roofing, exterior elevations, HVAC systems, 12.47kV electrical switchgear, 208Y/120V distribution panels, lightning protection, fire alarm systems with mass notification capability, and site work including demolition, grading, stormwater management, and underground electrical conduits. The facility is designed as a mixed-occupancy industrial building (Type II-B construction) with Group F-1 factory/industrial classification, featuring unsprinklered design with fire detection systems, multiple 1200-amp medium-voltage circuit breakers, packaged terminal heat pump units for climate control, and emergency backup power systems.
The design incorporates substantial electrical infrastructure requirements including three main medium-voltage buses (12.47kV), dual main breakers with automatic transfer switching capability, fourteen feeder circuits with provisions for future renewable generation, a control power transformer station, arc flash protection relays, and comprehensive grounding systems with lightning strike protection. HVAC design includes four split-system air conditioning units serving the switchgear, control, battery, and communications rooms, with dedicated exhaust fans and passive radon mitigation. The facility must interface with Idaho Power Company's distribution system and existing base circuits (A through H), with specific coordination requirements for temporary and permanent electrical feeds. Life safety provisions include multiple exit doors, emergency lighting and signaling, manual fire alarm pull stations, fire detection through air sampling smoke detection systems with hydrogen gas monitoring in the battery room, and mass notification speakers integrated with the fire alarm system. Site work encompasses utility relocation, construction of a stormwater retention pond, installation of anti-ram security fencing compliant with ASTM M50/P1 standards, and complete decommissioning of the existing switching station after load transfer.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4897-25-F-0026
21 OCTOBER 2025
FA4897-20-D-0001
MOUNTAIN HOME AIR FORCE BASE, ID
REPAIR BASE SWITCHING STATION, BLDG 1406 &
POWER STATION, BLDG 1017
100% DESIGN DOCUMENTS
366 CES/CEN
DELIVERY ORDER NO.:
CONTRACT NO.:
ISSUE DATE:
U .S . A
IR
F O R C E
SHEET ID
H D R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2 ) 3 -7
C
ES
/C
EN
M O U N
TA
IN
H O M E
AI
R F O R C E
BA
SE
O C
TO
BE
R
SH
EE
T N O
AN
SI
D
FA
-2 5- F-
M O U N
TA
IN
H O M E
AI
R F O R C E
BA
SE
R
EP
AI
R B
AS
E
SW
IT
C H
IN
G S
TA
TI
O N , B
LD
G
PO
W
ER
ST
AT
IO
N , B
LD
G
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N O
D
ES
IG
N
ED
B Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B Y:
D
AT
E
PR
O
JE
C T N O
C H
EC
KE
D B Y:
D R
AW
N B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D R P R O
JE
C T N O
BLDG 1406
BLDG 1017
P.
D
ER
R
M O U N
TA
IN
H O M E, ID
AH
O
FA
-2 0- D -0
GI001
C O
VE
R S H
EE
T
J.
B R
AN
D T
S.
S U H R
R . M C
KI
N
LE
Y
O F
SHEET INDEX
PublishOrder_ USACE Sheet Number Sheet Name 90% 100%
01-GENERAL
1 GI001 COVER SHEET • •
2 GC001 CONTRACTOR ACCESS AND HAUL ROUTE • •
3 GE001 ELECTRICAL LEGEND • •
4 BB101 BORING LOCATION PLAN • •
5 BB601 BORING LOG • •
6 LS101 CODE ANALYSIS • •
7 LS102 CODE COMPLIANCE SITE PLAN • •
8 LS103 LIFE SAFETY PLAN • •
05-CIVIL
9 C-001 SURVEY CONTROL MAP • •
10 CD101 SITE DEMOLITION PLAN • •
11 CD102 SWITCHING STATION DEMOLITION PLAN • •
12 CS101 SITE PLAN • •
13 CS102 SITE GRADING PLAN • •
14 CS103 SPOT ELEVATION PLAN • •
15 CS104 SITE LAYOUT PLAN • •
16 CS501 DETAILS • •
17 CS502 DETAILS • •
18 CS503 DETAILS • •
19 CS504 DETAILS • •
07-STRUCTURAL
20 S-001 GENERAL STRUCTURAL NOTES • •
21 S-101 FOUNDATION PLAN • •
22 S-102 ROOF FRAMING PLAN • •
23 S-501 TYPICAL STRUCTURAL DETAILS • •
24 S-502 TYPICAL STRUCTURAL DETAILS • •
25 S-503 TYPICAL STRUCTURAL DETAILS • •
26 S-504 TYPICAL STRUCTURAL DETAILS • •
27 S-505 GRAVITY AND LATERAL LOAD DIAGRAMS • •
08-ARCHITECTURAL
28 A-101 FLOOR PLAN • •
29 A-102 REFLECTED CEILING PLAN • •
30 A-103 ROOF PLAN • •
31 A-201 EXTERIOR ELEVATIONS • •
32 A-202 EXTERIOR ELEVATIONS • •
33 A-301 BUILDING CROSS SECTIONS • •
34 A-302 WALL SECTIONS • •
35 A-501 DETAILS • •
36 A-601 SCHEDULES AND DETAILS • •
12-FIRE PROTECTION
37 FA001 FIRE ALARM LEGEND AND NOTES • •
38 FA100 FIRE ALARM PLAN • •
39 FA501 FIRE ALARM DETAILS • •
40 FA502 FIRE ALARM ANTENNA DETAILS • •
41 FA601 FIRE ALARM RISER DIAGRAM • •
42 FA602 FIRE ALARM MATRIX • •
43 FA603 CODE ANALYSIS • •
15-MECHANICAL
44 M-001 MECHANICAL GENERAL NOTES, ABBREVIATIONS • •
45 M-101 FIRST FLOOR PLAN - HVAC • •
46 M-501 HVAC DETAILS • •
47 M-601 HVAC SCHEDULES • •
16-ELECTRICAL
48 EP101 POWER AND TELECOMMUNICATION PLAN • •
49 EG101 LIGHTNING PROTECTION PLAN • •
50 EL101 LIGHTING PLAN • •
51 ET101 UMCS NETWORK RISER DIAGRAM • •
52 E-501 ELECTRICAL DETAILS • •
53 E-502 ELECTRICAL DETAILS AND DIAGRAMS • •
54 E-601 ELECTRICAL SCHEDULES • •
55 E-001 ELECTRICAL LEGEND • •
56 E-002C SWITCHING DIAGRAM • •
57 E-002R SWITCHING DIAGRAM • •
58 E-003C SINGLE LINE DIAGRAM • •
59 E-003R SINGLE LINE DIAGRAM • •
60 E-101C FRONT VIEW AND FLOOR PLAN • •
61 E-101R FRONT VIEW AND FLOOR PLAN • •
62 E-102C CONDUIT PLAN • •
63 E-102R CONDUIT PLAN • •
64 E-103 CONDUIT DETAILS • •
65 E-104 VAULT AND POLE DETAILS • •
66 E-301 SECTION VIEWS • •
67 EI001 TYPICAL MAIN BREAKER 3-LINE AND CONTROL SCHEMATIC • •
68 EI002 TIE BREAKER 3-LINE AND CONTROL SCHEMATIC • •
69 EI003 TYPICAL GENERATOR MAIN BREAKER 3-LINE AND CONTROL SCHEMATIC • •
70 EI004 TYPICAL FEEDER BREAKER 3-LINE AND CONTROL SCHEMATIC • •
71 EI005 MAIN BUS A DIFFERENTIAL RELAY 3-LINE AND CONTROL SCHEMATIC • •
72 EI006 MAIN BUS B DIFFERENTIAL RELAY 3-LINE AND CONTROL SCHEMATIC • •
73 EI007 ETHERNET SWITCH CONTROL SCHEMATIC • •
74 EI008 ANNUNCIATOR CONTROL SCHEMATIC • •
75 EP001 CPT & ATS 3-LINE AND CONTROL SCHEMATIC • •
76 EP002 AC PANEL/BATTERY CHARGER/DC PANEL • •
77 EP003 AC & DC BUS ACCESSORY & CONDUIT SCHEMATIC • •
78 ES101 ELECTRICAL SITE PLAN • •
79 ES102 SITE GROUNDING PLAN • •
80 ES103 TYPICAL GROUNDING DETAILS • •
81 ES104 TYPICAL GROUNDING DETAILS • •
Grand total: 81
JWAGES
Snapshot
ATCT
(BUILDING
3600)
BUILDING
ALPINE ST
PHANTOM AVE
LIBERATOR STREET
AARDVARK AVENUE
FALCON STREET
ALPINE STREET
BOMBER STREET
PE
R
IM
ET
ER
R
O
AD
PHANTOM AVENUE
CIVIL ENGINEERING
BUILDING 1300
WATER FILL STATION
NEAR BUILDING 1406
SECURITY FORCES
BUILDING 1013
FIRE DEPT.
BUILDING 206 RECYCLING CENTER
BASE EXCHANGE (BX)
HOSPITAL
GRAND VIEW ROAD
(TO HIGHWAY 167)
GRAND VIEW GATE
(CONTRACTOR ACCESS)
GUNFIG
HTER AVENUE
2N
D AVENUE
1S
T AVENUE
WING HQ
BUILDING 512
th
AVENUE
TH AVENUE
STAGING AREA.
SEE NOTE 6
AAFES SERVICE STATION
MAIN GATE
VISITOR'S CENTER
G U
N
FI
G H
TE
R
A
VE
N U
E
PROJECT LOCATION
7T
H AVENUE
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
0 800 1600
1. REFER TO SPECIFICATION 01 14 00 WORK RESTRICTIONS FOR INSTRUCTIONS
ON ACQUIRING BASE ACCESS.
2. MAINTAIN STRICT DUST CONTROL TO PREVENT BLOWING DUST AT ALL TIMES.
DUST CONTROL METHODS AND PROCEDURES MUST BE APPROVED BY THE
CONTRACTING OFFICER AND PROJECT MANAGER/PROJECT INSPECTOR.
3. ALL TRUCKS MUST BE COVERED WHEN HAULING TO MINIMIZE HAZARD FROM
FALLING OBJECTS.
4. CLEAN UP (BY SWEEPING, VACUUMING, AND/OR OTHER APPROVED MEANS)
THE PROJECT SITE AND ANY ROUTE WHERE MATERIAL IS SPILLED AS
NEEDED OR DIRECTED BY THE CONTRACTING OFFICER AND PROJECT
MANAGER/PROJECT INSPECTOR.
5. RESTORE HAUL ROUTE, STAGING AND STORAGE AREAS TO
PRE-CONSTRUCTION CONDITION AND TO THE SATISFACTION OF THE
CONTRACTING OFFICER AND PROJECT MANAGER/PROJECT INSPECTOR.
PROVIDE SEEDING AND APPROPRIATE GROUND COVER FOR AREAS BEING
RESTORED DUE TO CONSTRUCTION ACTIVITY.
6. USE THE AREA SHOWN FOR STAGING AND MATERIAL STORAGE UNLESS
OTHERWISE GIVEN DIRECTION/APPROVAL BY THE CONTRACTING OFFICER
AND PROJECT MANAGER/PROJECT INSPECTOR.
7. COORDINATE HAUL ROUTES, LAYDOWN AREAS, AND UTILITY CONNECTIONS
FOR CONTRACTING OFFICER AND PROJECT MANAGER/PROJECT INSPECTOR
APPROVAL.
8. THIS SHEET APPLIES TO CONSTRUCTION WORK AND REPAIR WORK.
CONTRACTOR ACCESS / HAUL ROUTE
PROJECT LOCATION / WORK AREA
STAGING AREA
BUILDINGS
A1 CONTRACTOR ACCESS AND HAUL ROUTE
SCALE: 1" = 800'
GENERAL SHEET NOTES
LEGEND
PLAN
NORTH
GC001
C O
N
TR
A C
TO
R
A C
C
ES
S A
N D
H A
U L
R O
U
TE
J.
B
R
AN
D T
J.
B
R
AN
D T
C . S
TA
TS
ER 2
O
F
JWAGES
Snapshot
GENERAL ELECTRICAL NOTES:
1.
2.
THIS SHEET APPLIES TO CONSTRUCTION WORK AND REPAIR
WORK.
SCREENING OR SHADING OF WORK IS USED TO INDICATE
EXISTING COMPONENTS OR TO DE-EMPHASIZE PROPOSED
IMPROVEMENTS TO HIGHLIGHT SELECTED TRADE WORK. REFER
TO CONTEXT OF EACH SHEET FOR USAGE.
ONE-LINE, POWER, AND LIGHTING SYMBOLOGY
S
J
LP100
208/120V 3 , 4W
GROUND
TWO RECEPTACLES IN 2-GANG BOX UNDER COMMON
COVER PLATE
X
Y
SWITCHBOARD OR PANELBOARD; NAME, VOLTAGE,
PHASE, NUMBER OF WIRES WHEN INDICATED
W
CONDUIT STUBBED OUT AND CAPPED
CIRCUIT CONTINUATION
GROUND ROD
GROUND CABLE
Y
X
DUPLEX RECEPTACLE
WALL SWITCH
Y
X
Y
X
Y
X
SINGLE-FACED CEILING OR WALL MOUNTED EXIT LIGHT;
DIRECTIONAL ARROWS (IF REQUIRED) AS INDICATED ON PLANS
DOUBLE-FACED CEILING OR WALL MOUNTED EXIT LIGHT;
DIRECTIONAL ARROWS (IF REQUIRED) AS INDICATED ON PLANS
X
Y
X
Y EMERGENCY LIGHT, NUMBER OF ATTACHED HEADS AS SHOWN
CEILING/PENDANT MOUNTED LUMINAIRE, LAMP TYPE AS SPECIFIED
Y X
Z
WALL MOUNTED LUMINAIRE, LAMP TYPE AS SPECIFIED
X
Y Z
HOMERUN TO SOURCE (E.G. PANELBOARD, MCC)
NUMBER IN PARENTHESES REPRESENTS CONDUCTOR
SIZE OTHER THAN #12
SINGLE PHASE: 2#12, 1#12G IN 3/4"C
THREE PHASE: 3#12, 1#12G IN 3/4"C
UNLESS OTHERWISE NOTED, CONDUCTOR SIZE IS FOR
ENTIRE CIRCUIT, SOURCE TO LAST DEVICE. ALSO, SEE
ONE LINE DIAGRAM FOR CIRCUIT REQUIREMENTS
CONDUIT TURNING DOWN
CONDUIT TURNING UP
PANELBOARD (LESS THAN 250V)
PANELBOARD (250V TO 600V)
JUNCTION OR PULL BOX
NON-FUSED SAFETY SWITCH, 30A, 3P, X
INDICATES AMP RATING GREATER THAN 30A
OR
X Y
SUBSCRIPTS:
X - INDICATES TYPE
GFCI - GROUND FAULT CIRCUIT INTERRUPTER
Y - INDICATES CIRCUIT NUMBER FROM PANELBOARD
FUSED SAFETY SWITCH, 3P, X INDICATES AMP RATING
GREATER THAN 30A, Y INDICATES FUSE SIZE
Y
X
X 20A 3P
X
100AF
80AT
3P
X - INDICATES TYPE
NONE
SINGLE POLE
DOUBLE POLE
THREE-WAY
FOUR-WAY
Y - INDICATES CONTROLLING SWITCH (IF REQUIRED)
X - INDICATES LUMINAIRE TYPE PER LUMINAIRE SCHEDULE
Y - INDICATES AC CIRCUIT NUMBER FROM PANELBOARD
Z - INDICATES CONTROLLING SWITCH (IF REQUIRED)
NL - NIGHT LIGHT UNSWITCHED
SUBSCRIPTS:
LIGHTING FIXTURE SUBSCRIPTS:
MCCB
ICCB
LVP
MCP
TYPES:
MOLDED CASE
INSULATED CASE
LOW VOLTAGE POWER
MOTOR CIRCUIT
PROTECTOR
(RATING PER CONNECTED
LOAD)
LOW VOLTAGE CIRCUIT BREAKER (CB). RATING
AND NO. OF POLES AS SHOWN. WHEN SPECIFIC
TYPE, OTHER THAN MCCB, IS REQUIRED, X
INDICATES TYPE.
L S I G A
TRIP UNIT:
LONG TIME PICKUP
SHORT TIME PICKUP
INSTANTANEOUS PICKUP
GROUND FAULT PICKUP
ARC ENERGY REDUCTION
MODE
CONDUIT CONNECTION TO EQUIPMENT
X
(#X)
J OR
W - INDICATES DC CIRCUIT NUMBER FROM PANELBOARD
COMMUNICATION SYMBOLOGY
WALL MOUNTED COMBINATION TELEPHONE AND DATA OUTLET
SECURITY SYMBOLOGY
DOOR POSITION SWITCH
COMBINATION ELECTRIC DOOR STRIKE AND
POSITION SWITCH
PROXIMITY KEYPADR
K
SITE SYMBOLOGY
EXTERIOR PAD MOUNTED TRANSFORMER
ELECTRICAL HANDHOLE OR MANHOLE
X - INDICATES SEQUENCE NUMBER
Y- MHX OR HHX
X
Y
DOWNGUY
U .S . A
IR
F O R C E
SHEET ID
H D R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2 ) 3 -7
C
ES
/C
EN
M O U N
TA
IN
H O M E
AI
R F O R C E
BA
SE
O C
TO
BE
R
SH
EE
T N O
AN
SI
D
FA
-2 5- F-
M O U N
TA
IN
H O M E
AI
R F O R C E
BA
SE
R
EP
AI
R B
AS
E
SW
IT
C H
IN
G S
TA
TI
O N , B
LD
G
PO
W
ER
ST
AT
IO
N , B
LD
G
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N O
D
ES
IG
N
ED
B Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B Y:
D
AT
E
PR
O
JE
C T N O
C H
EC
KE
D B Y:
D R
AW
N B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D R P R O
JE
C T N O
BLDG 1406
BLDG 1017
P.
D
ER
R
M O U N
TA
IN
H O M E, ID
AH
O
FA
-2 0- D -0
GE001
EL
EC
TR
IC
A L
LE
G
EN
D
W . D
AV
ID
SO
N
J.
S
PE
N C
ER
K.
V
AN
D
ER
K O
LK
O F
X
X X
X
XX
X X X X X X X X X X X X X X X
G G G G G G G G G G G G G G G
G G
G G
G G
G G
G G
G G
G G
G
WWWWWWW
W W
W W
W
W W
W W
W
W
WWWWWWWWWWW
W W
W
WWW
W W
W
W W
W
W
WW
W
W
WWWWWWWWWW
W
SA
N
SA
N
SA
N
SA
N
SANSANSANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SA
N
SAN SAN
SAN SAN
SA
N
SA
N
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E
E E E E E E E E E E E
E E EE E
EEEEEEEEEEEEE
EEEEEEEEEE
E
E
E
E E
EEEEEEEEE
E
E E
E E
E
E E
E E
E E
E E
ESESES
ES
ES
ES
ES
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMMCOMMCOMMCOMMCOMM
C O
M M
COMM
COMM
COMM
COMM
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
COMMCOMMCOMMCOMMCOMM
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM COMM COMM COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM COMM
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W
WW
W W
W
W W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
J
E
E E
E E
W W
W W
COMM COMM COMM COMM COMM
NATIVE G
RASSES
GRAVEL
LIBERATOR STREET
X X X X X X X X X X X X X X X X X X X X X
X X
X X
G R
AV
EL
GRAVEL
RP-01 BH-A
G-01
RP-07
RP-02
RP-03
RP-06
RP-05
RP-04NATIVE G
RASSES
W W
W W
W W
W W
W W
W W
W W
W
E E E
G G G G G G G G G G G G G G G G G G G G
G G
COMM
S/W
E E E E E E E E E E
CONIFER TREES - 6RR TIES
7T H
A
VE
N U
E
RP-08
RP-10
RP-11
RP-12
RP-09
ELE
CTRIC
AL
VAULT
VAULT
ELE
CTRIC
AL
VAULT
BUILDING 1403 MHAFB SWITCHING
SUBSTATION
IDAHO POWER COMPANY
DISTRUBUTION SUBSTATION
1. SEE SHEET GC001 FOR GENERAL NOTES TO CONTRACTOR.
2. THIS SHEET INCLUDES CONSTRUCTION WORK AND REPAIR WORK.
ROCK PROBE
BORE HOLE
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
GENERAL SHEET NOTES
LEGEND
A1 BORING LOCATION PLAN
SCALE: 1" = 20'
RP-
BH-A
G-01
0 20 40
NAME EASTINGNORTHINGELEVATION
ROCK PROBES AND BORE HOLES
2991.56
2991.62
2991.79
2992.09
2991.86
2991.91
2991.80
2991.91
15640561.52
15640526.09
15640553.18
15640519.28
15640490.90
15640503.27
15640455.49
15640484.19
1942852.73
1942886.79
1942914.64
1942948.87
1942921.52
1942922.78
1942956.81
1942984.19
RP_01
RP_02
RP_07
RP_06
RP_03
BH-AG-01
RP_04
RP_05
DEPTH
8.90
10.00
11.50
7.90
7.90
7.15
5.50
7.70
7.40
11.50
12.00
8.00
11.7
2992.04 15640574.24 1942908.83RP_08*
2991.98 15640535.75 1942940.13RP_09*
2992.09 15640475.30 1942965.58RP_10*
2991.91 15640468.42 1942972.51RP_11*
2991.93 15640455.23 1942941.85RP_12*
* : LOCATIONS ARE APPROXIMATE.
MHAFB SWITCHING
SUBSTATION
BUILDING 1403
LIBERATOR STREET
7T H
A
VE
N U
E
8T H
A
VE
N U
E
IDAHO POWER COMPANY
DISTRIBUTION SUBSTATION
BLDG
PLAN
NORTH
BB101
B O
R
IN
G L
O C
A
TI
O N
P
LA
N
J.
B
R
AN
D T
J.
B
R
AN
D T
C . S
TA
TS
ER 4
O
F
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text X
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text
IRR
AutoCAD SHX Text
IRR
AutoCAD SHX Text
IRR
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text S
AutoCAD SHX Text
ASV
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
1. THIS SHEET INCLUDES CONSTRUCTION WORK AND REPAIR WORK.
NOTES
BB601
B O
R
IN
G L
O G
J.
B
R
AN
D T
J.
B
R
AN
D T
C . S
TA
TS
ER 5
O
F
U .S
. A
IR
F O
R C
E
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
R
EP
AI
R B
AS
E
SW
IT
C H
IN
G
S
TA
TI
O
N , B
LD
G
PO
W
ER
ST
AT
IO
N , B
LD
G
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
BLDG 1406
BLDG 1017
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
LS101
C O D E A N A
LY
SI
S
P.
P
H
EL
AN
T.
F
R
EE
M
AN
J.
W
AR
BO
YS 6
O
F
• EVERY EXIT OR DIRECTIONAL SIGN WILL BE ILLUMINATED BY A RELIABLE LIGHT SOURCE. NFPA 101 § 7.10.5.1
LOCATIONS WHERE DIRECTION OF TRAVEL TO REACH THE NEAREST EXIT IS NOT APPARENT.
• A SIGN WITH DIRECTIONAL INDICATOR SHOWING DIRECTION OF TRAVEL WILL BE PLACED IN NFPA 101 § 7.10.2.1
THE EXIT OR WAY TO REACH EXITIS NOT READILY APPARENT TO OCCUPANTS.
• ACCESS TO EXITS WILL BE MARKED BY APPROVED, READILY VISIBLE SIGNS IN ALL CASES WHERE NFPA 101 § 7.10.1.5.1
EXITS, WILL BE MARKED BY APPROVED SIGNS.
• EXITS OTHER THAN MAIN EXTERIOR EXIT DOORS THAT ARE OBVIOUSLY AND CLEARLY IDENTIFIED AS NFPA 101 § 7.10.1.2.1
MARKING MEANS OF EGRESS
• MINIMUM ILLUMINATION FOR FLOORS AND OTHER WALKING SURFACES WILL BE AT LEAST 1 FC. NFPA 101 § 7.8.1.3 (2)
WALKING SURFACE DURING OCNDITIONS OF STAIR USE).
• MINIMUM ILLUMINATION FOR MEANS OF EGRESS WILL BE AT LEAST 10 FC (MEASURED FROM NFPA 101 § 7.8.1.3 (1)
ILLUMINATION OF MEANS OF EGRESS
• SPECIAL PURPOSE INDUSTRIAL (UNSPRINKLERED): 50 FT NFPA 101 § 40.2.5.1
• INDUSTRIAL, (UNSPRINKLERED): 50 FT (GENERAL INDUSTRIAL) NFPA 101 § 40.2.5.1
• BUSINESS, (UNSPRINKLERED): 50 FT NFPA 101 § 39.2.5.3
DEAD-END LIMITS
• SPECIAL PURPOSE INDUSTRIAL (UNSPRINKLERED):50 FT NFPA 101 § 40.2.5.1
• INDUSTRIAL, (UNSPRINKLERED): 50 FT (GENERAL INDUSTRIAL) NFPA 101 § 40.2.5.1
• BUSINESS, (UNSPRINKLERED): 50 FT NFPA 101 § 39.2.5.2.1
COMMON PATH OF TRAVEL
• SPECIAL PURPOSE INDUSTRIAL (UNSPRINKLERED):300 FT NFPA 101 § 40.2.6.1
• INDUSTRIAL, (UNSPRINKLERED): 200 FT (GENERAL INDUSTRIAL) NFPA 101 § 40.2.6.1
• BUSINESS, (UNSPRINKLERED): 200 FT NFPA 101 § 39.2.6.3
TRAVEL DISTANCE TO AN EXIT
THAN ONE-HALF THE MAXIMUM OVERALL DIAGONAL DIMENSION OF THE BUILDING OR AREA TO BE SERVED.
• MINIMUM DISTANCE SEPARATION BETWEEN EXITS AND EXIT ACCESS DOORS WILL BE NOT LESS NFPA 101 § 7.5.1.3.2
REMOTENESS OF EXITS
• IT EQUIPMENT ROOMS: 300 SQ FT/PERSON GROSS FLOOR AREA
• MECHANICAL/ELECTRICAL ROOMS: 500 SQ FT/PERSON GROSS FLOOR AREA UFC 3-600-01, TABLE 10-1
• INDUSTRIAL USE: 100 SQ FT /PERSON GROSS FLOOR AREA
• STORAGE USE: MAXIMUM PROBABLE
• BUSINESS USE: 150 SQ FT/PERSON GROSS FLOOR AREA NFPA 101 TABLE 7.3.1.2
OCCUPANCY LOAD FACTORS
• NOT LESS THAN 32" FOR DOOR CLEAR WIDTH IN MEANS OF EGRESS NFPA 101 § 7.2.1.2.3.2
• NOT LESS THAN 28" FOR DOOR CLEAR WIDTH IN EXISTING BUILDINGS
MINIMUM WIDTH:
OF THE REQUIRED EGRESS WIDTH.
• DOOR LEAVES SWINGING INTO THE THE MEANS OF EGRESS WILL LEAVE NOT LESS THAN ON HALF NFPA 101 § 7.2.1.4.3.1
DOOR LEAF ENCROACHMENT
• EQUIPMENT RATED 800 A OR MORE, DOORS SHALL OPEN IN DIRECTION OF TRAVEL AND HAVE PANIC HARDWARENFPA 70 § 110.26 (C) (3)
• DOORS WILL SWING IN THE DIRECTION OF TRAVEL WHERE SERVING MORE THAN 50 PERSONS. NFPA 101 § 7.2.1.4.2 (1)
DOOR LEAF SWING DIRECTION
LIGHTING IN ACCORDANCE WITH NFPA 101 § 7.9.
• THE EGRESS SIDE OF ACCESS-CONTROLLED EGRESS DOORS WILL BE PROVIDED WITH EMERGENCY NFPA 101 § 7.2.1.6.2(7)
FIRE PROTECTIVE SIGNALLING SYSTEM IS MANUALLY RESET.
UNLOCK THE EGRESS DOORS IN THE DIRECTION OF EGRESS AND THEY WILL REMAIN UNLOCKED UNTIL THE
• ACTIVATION OF THE BUILDING SPRINKLER SYSTEM OR FIRE PROTECTION SIGNALING SYSTEM WILL NFPA 101 § 7.2.1.6.2(6)
THE LOCK, INDEPENDENT OF LOCKING SYSTEM ELECTRONICS.
• WHEN OPERATED, THE MANUAL RELEASE DEVICE WILL RESULT IN DIRECT INTERRUPTION OF POWER TO
READS "PUSH TO EXIT".
• THE MANUAL RELEASE DEVICE WILL BE READILY ACCESSIBLE AND CLEARLY IDENTIFIED BY A SIGN THAT
AND WITHIN 60 IN. OF THE SECURED DOOR OPENING.
• MANUAL RELEASE DEVICE WILL BE LOCATED ON THE EGRESS SIDE 40 IN TO 48 IN ABOVE THE FLOOR
DEVICE COMPLYING WITH THE FOLLOWING:
• DOOR LOCKS WILL BE ARRANGED TO UNLOCK IN THE DIRECTION OF EGRESS FROM A MANUAL RELEASE NFPA 101 § 7.2.1.6.2(3)
THE SENSOR OR TO THE PART OF THE SYSTEM THAT LOCKS THE DOOR.
• DOOR LEAVE WILL AUTOMATICALLY UNLOCK IN THE DIRECTION OF TRAVEL UPON LOSS OF POWER TO NFPA 101 § 7.2.1.6.2(2)
OF EGRESS UPON DETECTION OF APPROACHING OCCUPANT.
• SENSOR WILL BE PROVIDED ON THE EGRESS SIDE, ARRANGED TO UNLOCK THE DOOR IN THE DIRECTION NFPA 101 § 7.2.1.6.2(1)
LOCKING HARDWARE THAT PREVENTS EGRESS, PROVIDED THAT THE FOLLOWING ARE MET:
• DOOR ASSEMBLIES IN THE MEANS OF EGRESS WILL BE PERMITTED TO BE EQUIPPED WITH ELECTRICAL NFPA 101 § 7.2.1.6.2
ACCESS-CONTROLLED EGRESS DOOR ASSEMBLIES:
OF THE 2015 IBC ARE ACCPETABLE.
• WHERE ABA STANDARDS REFERENCES PREVIOUS VERSIONS OF IBC, THE APPLICABLE REQUIREMENTS
ACT (ABA) STANDARDS.
• DO NOT USE IBC CHAPTER 10, EXCEPT WHERE REFERENCED BY ARCHITECTURAL BARRIERS
USE UFC 3-600-01 IN LIEU OF IBC CHAPTER 10. UFC 1-200-01 § 2-10
MEANS OF EGRESS (SEE LIFE SAFETY PLANS):
• MONITORING OF MECHANICAL EXHAUST VENTILATION. NFPA 855 § 4.9.3.1.3
ENERSYS POWERSAFE HYDROGEN MONITORING
(VESDA SENSEPOINT XCL - LARGE BORE)
• SMOKE AND FIRE DETECTION ASSD & ASSD COMBUSTIBLE GAS DETECTION (VESDA-E VEP)
• ALARM AND MNS EQUIPMENT.
• SURGE PROTECTION DEVICE WILL BE PROVIDED FOR ALL 120 VAC POWERED FIRE UFC 3-600-01 § 9-18.11.2
• BREAKER LOCK WILL BE PROVIDED FOR FIRE ALARM AND MNS IAW UFC 3-520-01. UFC 3-600-01 § 9-18.11.1
• THE FIRE ALARM EVACUATION SIGNAL WILL BROADCAST OVER THE MNS SYSTEM. UFC 3-600-01 § 9-18.1.2.1
• VOICE INTELLIGIBILITY TO BE PROVIDED THROUGHOUT (CIS >0.8 OR STI > 0.70). UFC 4-021-01 § 4-6.1.2
• CRITICAL FACILITY REQUIRES MASS NOTIFICATION SYSTEM UFC 4-010-01 § 1-15.3 & 2-3.5
• NOTIFICIATION TO BE PROVIDED THROUGHOUT ENTIRE BUILDING. UFC 3-600-01 § 9-18.6.1
• MANUAL PULL STATION AT ALL EXIT DOORS. UFC 3-600-01 § 9-18.7.4
• DETECTOR COVERAGE AREA WILL BE REDUCED BY 50% WHERE HVLS FANS ARE USED. UFC 3-600-01 § 9-18.5.1.2
• REMOTE ANNUNCIATOR PROVIDED AT DESIGNATED FIRE DEPARTMENT ENTRANCE. UFC 3-600-01 § 9-18.4.4
• ANALOG / ADDRESSABLE FIRE ALARM SYSTEM WILL BE PROVIDED. UFC 3-600-01 § 9-18.4
• MASS NOTIFICIATION SYSTEM TO BE INSTALLED IN ACCORDANCE WITH UFC 4-021-01. UFC 3-600-01 § 9-18.4
• FIRE ALARM SYSTEM TO BE INSTALLED IN ACCORDANCE WITH UFC-3-600-01, NFPA 70, NFPA 72 AND ABA. UFC 3-600-01 § 9-18.3.1
• MASS NOTIFICIATION SYSTEM IS REQUIRED. UFC 4-010-01 § 1-15.3 & 2-3.5
• CRITICAL FACILITY REQUIRES MASS NOTIFICATION SYSTEM UFC 4-010-01 § 1-15.3 & 2-3.5
• FIRE ALARM SYSTEM IS REQUIRED DUE TO CRITICAL FACILITY UFC 4-010-01 § 1-15.3 & 2-3.5
FIRE ALARM AND MASS NOTIFICATION SYSTEM (MNS)
ELECTRONICS (EG: CLEAN AGENT).
• EXTINGUISHERS FOR ELECTRONIC EQUIPMENT AREAS SPACES WILL BE SUITABLE FOR UFC 3-600-01 § 9-17.2.2
• PORTABLE FIRE EXTINGUISHERS WILL BE LOCATED IN ACCORDANCE WITH NFPA 10. UFC 3-600-01 § 9-17.2.1
• GENERAL PURPOSE FIRE EXTINGUISHERS ARE REQUIRED. UFC 3-600-01 § 9-17.1
PORTABLE FIRE EXTINGUISHERS
• THE DISTANCE FROM EXTERIOR DOORS TO ANY PORTION OF THE
BUILDING DOES NOT EXCEED 450 FT. UFC 3-600-01 § 9-10.2.2
• THE BUILDING DOES NOT EXCEED 4 STORIES. UFC 3-600-01 § 9-10.2.1
• STANDPIPE SYSTEM IS NOT REQUIRED.
STANDPIPE SYSTEMS
EXCEEDING 15,000 SQFT.
• AUTOMATIC SPRINKLER PROTECTION IS REQUIRED FOR SINGLE STORY
TYPE I OR II CONSTRUCTION
UFC 3-600-01 § 9-7.2.1.1
• AUTOMATIC SPRINKLER PROTECTION IS NOT REQUIRED.
AUTOMATIC SPRINKLER PROTECTION
ENERSYS POWERSAFE HYDROGEN MONITORING
FIRE DETECTION (VESDA SENSEPOINT XCL - LARGE BORE)
SMOKE AND FIRE DETECTION ASSD & ASSD COMBUSTIBLE GAS DETECTION (VESDA-E VEP)UFC 3-520-05 § 2-6 & NFPA 850
BATTERY STORAGE: NFPA 70 ARTICLE 480
BATTERY PROTECTION: UFC 3-520-01 § 3-11.3.5
• FIRE PROTECTION: COMPLY WITH THE REQUIREMENTS OF 3-520-05 NO FIRE SUPPRESSION REQUIRED. UFC 3-520-05 § 2-6
PORTABLE FACLILITES SHALL BE IN ACCORDANCE WITH ISEA Z358.1
POWERSAFE VRLA AGM BATTERY IS SUSPENDED MAT TYPE BATTERY WHICH GREATLY REDUCES POSSIBLE SPILL.
MANUAL REFILL TYPE PORTABLE EYE AND FACE WASH IS ACCEPTABLE WITH VRLA BATTERIES
• EMERGENCY FACILITIES: COMPLY WITH THE REQUIREMENTS OF 3-520-05 FOR EMERGENCY EYEWASH. UFC 3-520-05 § 2-5
• ELECTRICAL REQUIREMENTS: COMPLY WITH THE REQUIREMENTS OF 3-520-05. UFC 3-520-05 § 2-4
• MECHANICAL REQUIREMENTS: COMPLY WITH THE REQUIREMENTS OF 3-520-05. UFC 3-520-05 § 2-3
• ARCHITECTURAL REQUIREMENTS: COMPLY WITH THE REQUIREMENTS OF UFC 3-520-05 UFC 3-520-05 § 2-2
• STATIONARY BATTERIES AND BATTERY CHARGERS UFC 3-520-01 § 3-11
• BATTERY ENERGY STORAGE SYSTEMS – LEAD ACID (RM 103) UFC 3-600-01 § 4-8 DOES NOT APPLY
• BATTERY ENERGY STORAGE SYSTEMS – LEAD ACID ONLY (NO LITHIUM CHEMISTRY BATTERIES PRESENT)
USE UFC 3-600-01 CHAPTER 4 IN LIEU OF IBC CHAPTER 4. UFC 1-200-01 § 2-4
SPECIAL DETAILED REQUIREMENTS BASED ON USE:
NOTES: • ORDINARY HAZARD CONTENTS, SINCE NO FLAMMABLE LIQUID IS PRESENT (NFPA 101 §A.6.2.2.4, A.3.3.196.8.2
INDUSTRIAL USE ORDINARY HAZARD (BATTERY ROOM) NFPA 101 CHAPTER 40
INDUSTRIAL USE HIGH HAZARD (POWER SUBSTATION) NFPA 101 CHAPTER 40
• NFPA OCCUPANCY CLASSIFICATIONS - MIXED OCCUPANCIES: NFPA 101 § 6.1.14.3
FINISH, FIRE PROTECTION FEATURES AND MEANS OF EGRESS.
RATING OF INTERIOR LOAD-BEARING PARTITIONS (OTHER THAN OCCUPANCY SEPARATION), INTERIOR NFPA 101 APPLIES TO OCCUPANCY CLASSIFICATION AS IT RELATES TO FIRE/SMOKE RESISTANCE UFC 3-600-01 § 3-3
GROUP F-1 MODERATE HAZARD FACTORY INDUSTRIAL (POWER PLANTS) IBC § 306 (FACTORY INDUSTRIAL)
• IBC OCCUPANCY CLASSIFICATIONS - MIXED USE AND OCCUPANCY - NON-SEPARATED OCCUPANCY: IBC § 508.3
AREA, BUILDING SEPARATION AND OCCUPANCY SEPARATION.
IBC APPLIES TO OCCUPANCY CLASSIFICATION AS IT RELATES TO BUILDING HEIGHT, BUILDING UFC 3-600-01 § 3-2
IBC CHAPTER 3 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-3
USE AND OCCUPANCY CLASSIFICATION:
• BUILDING IS NOT PROTECTED WITH AN AUTOMATIC SPRINKLER SYSTEM UFC 3-600-01 § 9-7.2.1 AND IBC § 903.2.4
• BUILDING IS CONSTRUCTED USING TYPE II-B CONSTRUCTION IBC § 602 & TABLE 601
BUILDING DESCRIPTION (GENERAL INFORMATION)
ONLY THE PORTIONS OF BUILDING CODE CORRESPONDING TO APPLICABLE SECTIONS OF IBC, PER UFC 1-200-01 APPLY.
UFC'S OVER-RULE ALL CRITERIA; AIR FORCE ENGINEERING TECHNICAL LETTERS OVER-RULE NFPA STANDARDS.
WHERE DISCREPANCIES BETWEEN REGULATIONS AND TECHNICAL LETTERS OCCUR, THE FOLLOWING HIERARCHY WILL BE USED:
APPLICATION HIERARCHY
AFMAN 32-1065 - GROUNDING AND ELECTRICAL SYSTEMS, TAKES PRECEDENCE OVER UFC 3-575-01
NATIONAL ELECTRIC SAFETY CODE, 2023 EDITION, IEEE/AMERICAN NATIONAL STANDARD C2
FM GLOBAL DATA SHEET 5-4 TRANSFORMERS JULY 2019, INTERIM REVISION APRIL 2025
ANSI/UL 555S STANDARD FOR SMOKE DAMPERS
ANSI/UL 555 STANDARD FOR FIRE DAMPERS
AWWA M31 DISTRIBUTION SYSTEM REQUIREMENTS FOR FIRE PROTECTION
ASME/ANSI A13.1- SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS.
ASTM D523 - STANDARD TEST METHOD FOR SPECULAR GLOSS.
ASTM C423-09A - STANDARD TEST METHOD FOR SOUND ABSORPTION AND SOUND ABSORPTION COEFFICIENTS BY THE REVERBERATION ROOM METHOD.
AFM 32-1084, FACILITY REQUIREMENTS.
CFR TITLE 14, PART 77 SAFE, EFFICIENT USE, AND PRESERVATION OF THE NAVIGABLE AIRSPACE, 9 JAN 2017
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS, 2015 EDITION
IEEE 979 GUIDE FOR SUBSTATION FIRE PROTECTION, 2012 EDITION
IEEE 80 GUIDE FOR SAFETY IN AC SUBSTATION GROUNDING, 2013 EDITION
INTERNATIONAL CODE COUNCIL, INTERNATIONAL BUILDING CODE (IBC), 2024 EDITION (AS AMENDED BY UFC 1-200-01)
OTHER REFERENCES
NFPA 1963 FIRE HOSE CONNECTIONS, 2019 EDITION
NFPA 291 RECOMMEND PRACTICE FOR FIRE FLOW TESTING AND MARKING OF HYDRANTS, 2025 EDITION NFPA 855 STANDARD FOR THE INSTALLATION OF STATIONARY ENERGY STORAGE SYSTEMS, 2023 EDITION
STATIONS 2020 EDITION
NFPA 850 RECOMMENDED PRACTICE FOR FIRE PROTECTION FOR ELECTRICAL GENERATING PLANTS AND HIGH VOLTAGE DIRECT CONVERTER
NFPA 241 SAFEGUARDS DURING CONSTRUCTION, 2022 EDITION
NFPA 220 STANDARD ON TYPES OF BUILDING CONSTRUCTION, 2024 EDITION
NFPA 170 FIRE SAFETY SYMBOLS, 2024 EDITION
NFPA 101 LIFE SAFETY CODE, 2024 EDITION.
NFPA 90A STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATION SYSTEMS, 2024 EDITION
NFPA 80 STANDARD FOR FIRE DOORS AND OTHER OPENING PROTECTIVES, 2025 EDITION
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE, 2025 EDITION
NFPA 70 NATIONAL ELECTRIC CODE, 2023 EDITION
NFPA 68 STANDARD ON EXPLOSION PROTECTION BY DEFLAGRATION VENTING, 2018 EDITION
NFPA 51B STANDARD FOR FIRE PREVENTION DURING WELDING, CUTTING AND OTHER HOT WORK, 2024 EDITION
NFPA 30 FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE, 2024 EDITION
NFPA 24 STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND THEIR APPURTENANCES, 2025 EDITION
NFPA 10 STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2022 EDITION
NFPA 1 FIRE CODE, 2024 EDITION
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA) LATEST ADOPED EDITIONS OF NFPA STANDARDS
UFC 4-021-01 DESIGN AND O&M MASS NOTIFICATION SYSTEMS, 9 APRIL 2008, CHANGE 1, JANUARY 2010 UFC 4-010-01 DOD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS, 12 DECEMBER 2018, CHANGE 3, 24 MAY 2024
UFC 3-740-05 CONSTRUCTION COST ESTIMATING, 9 DECEMBER 2022.
UFC 3-730-01 PROGRAMMING COST ESTIMATES FOR MILITARY CONSTRUCTION,01 MARCH 2024.
UFC 3-601-02 FIRE PROTECTECTION SYSTEMS INSPECTION, TESTING, AND MAINTENANCE, 7 OCTOBER 2021, CHANGE 1, 18 APRIL 2025 UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, 8 AUGUST 2016, CHANGE 6, 6 MAY 2021 UFC 3-560-01 OPERATION AND MAINTENANCE: ELECTRICAL SAFETY,24 JULY 2017, CHANGE 3, 15 MAY 2023.
UFC 3-520-05 STATIONARY AND MISSION BATTERIES, 1 MAY 2015, CHANGE 2, 9 JANUARY 2020
UFC 3-520-01 INTERIOR ELECTRICAL SYSTEMS, 16 JANUARY 2025
UFC 3-410-04 INDUSTRIAL VENTILATION, 13 DECEMBER 2017
UFC 3-400-02 DESIGN: ENGINEERING WEATHER DATA, 20 SEPTEMBER 2018, CHANGE 2, 20 SEPTEMBER 2024
UFC 3-301-01 STRUCTURAL ENGINEERING, 11 APRIL 2023, CHAGE 4, 3 JUNE 2025
UFC 3-260-01 AIRFIELD AND HELIPORT PLANNING AND DESIGN, 4 FEBRUARY 2019, CHANGE 1, 5 MAY 2020
UFC 3-120-10 INTERIOR DESIGN, 16 MAY 2018, CHANGE 3, 22 MAY 2025
UFC 1-300-02 UNIFIED FACILITIES GUIDE SPECIFICATIONS FORMAT STANDARD, 1 APRIL 2014, CHANGE 3, 18 MAY 2021 UFC 1-200-01 GENERAL BUILDING REQUIREMENTS, 01 SEPTMEBER 2022, CHANGE 4, 17 DECEMBER 2024
UNIFIED FACILITIES CRITERIA (UFC)
REFERENCED CODES AND STANDARDS:
FIRE PROTECTION / LIFE SAFETY CODE ANALYSIS
GIVEN TO ACCESSIBILITY AND OBSTRUCTIONS (INCLUDING FENCES).
• ALL PARTS OF THE FACILITY EXTERIOR MUST BE WITHIN 350 FT OF A HYDRANT WITH CONSIDERATION UFC 3-600-01 § 9-3.5.8.2
FROM HYDRANTS.
• BOLLARDS, FENCING, LANDSCAPING AND SIMILAR OBSTRUCTIONS WILL BE LOCATED AT LEAST 24 IN. UFC 3-600-01 § 9-3.5.7(G)
• HYRANTS MUST BE INSTALLED ADJACENT TO PAVED AREAS, ACCESSIBLE TO FIRE DEPARTMENT APPARATUS. UFC 3-600-01 § 9-3.5.7(B)
• HYDRANTS WILL NOT BE LOCATED LESS THAN 40 FT. FROM BUILDINGS. NFPA 24 § 7.2.3
FIRE HYDRANT PLACEMENT AND COVERAGE (SEE CODE COMPLIANCE SITE PLAN)
OF FIRE FLOW OR SPRINKLER SYSTEM DEMAND.
• MINIMUM RESIDUAL PRESSURE IN A SERVICE LATERAL MUST NOT BE LESS THAN 20 PSI AT THE GREATER UFC 3-600-01 § 9-3.3.3
• MINIMUM SERVICE LATERAL FOR SPRINKLER SYSTEMS MUST NOT BE LESS THAN 6 IN. UFC 3-600-01 § 9-3.3.2
• NOT MORE THAN 2 HYDRANTS CAN BE LOCATED ON A SERVICE LATERAL. UFC 3-600-01 § 9-3.3.1
THE REQUIRED FIRE FLOW IN CASE OF A SINGLE BREAK.
• SERVICE MAINS MUST NOT BE DEAD-ENDED AND MUST BE LOOPED TO PROVIDE AT LEAST 50 PERCENT OF UFC 3-600-01 § 9-3.2.2-3
• SERVICE MAINS MUST BE SIZED TO CARRY FIRE FLOW AND DOMESTIC AND INDUSTRIAL DEMANDS. UFC 3-600-01 § 9-3.2.1
• SERVICE MAINS AND SERVICE LATERALS MUST COMPLY WITH AWWA M31, NFPA 24 AND UFC 3-230-01. UFC 3-600-01 § 9-3.1.1
SERVICE MAINS AND LATERALS:(EXISTING TO REMAIN)
AVAILABLE FIRE FLOW 2,634 GPM AT 20 PSI
• FLOW TEST RESULTS STATIC 50 PSI RESIDUAL 45 PSI FLOWING 1,000 GPM
NFPA 1 - 18.4.4.3 AND TABLE 18.4.4.2.1 BUILDING AREA <5900 SQ FT & TYPE IIB CONSTRUCTION
• FIRE FLOW FOR NON-SPRINKLERED FACILITIES MUST BE PER NFPA 1 - , REQUIRES 1,500 GPM AT 20 PSI. UFC 3-600-01 § 9-2.2
FIRE FLOW FOR FACILITIES:
NOTES: THE FIRE HYDRANTS LOCATIONS ARE EXISTING SEE CODE COMPLIANCE SITE PLAN FOR ACTUAL DISTANCES.
• ALL-WEATHER GROUND ACCESS WILL BE LOCATED WITHIN 150 FT OF FIRE DEPARTMENT CONNECTIONS. UFC 3-600-01 § 9-1.4
• DIMENSIONS OF FIRE LANES AND TURNAROUNDS WILL COMPLY WITH NFPA 1.
UFC 3-600-01 § 9-1.3
FROM AN EXTERIOR DOOR ACCESSIBLE TO FIRE DEPARTMENT INGRESS.
• ALL-WEATHER PAVED ACCESS WILL START AT THE ROAD AND TERMINATE NO FARTHER THAN 33 FT UFC 3-600-01 § 9-1.1
ACCESS TO THE FACILITY WILL BE PROVIDED.
• ONE MEANS OF PAVED ALL-WEATHER GROUND ACCESS TO ALLOW EMERGENCY VEHICLES UNIMPEDED UFC 3-600-01 § 9-1.1
FIRE DEPARTMENT VEHICLE ACCESS (SEE CODE COMPLIANCE SITE PLAN)(EXISTING)
USE UFC 3-600-01 IN LIEU OF IBC CHAPTER 9. UFC 1-200-01 § 2-9
FIRE PROTECTION SYSTEMS:
INDUSTRIAL A OR B A, B, OR C A, B, OR C CLASS I OR II
STORAGE A, B OR C A, B, OR C A, B, OR C CLASS I OR II
BUSINESS A, B OR C A, B, OR C A, B, OR C CLASS I OR II
GROUP
EXITS EXIT ACCESS
CORRIDORS
ROOMS AND
ENCLOSED...
INTERIOR FINISH
FLOOR
INTERIOR WALL, CEILING, AND FLOOR FINISHES: NFPA 101 CHAPTER 10 TABLE A.10.2.2
CONFORM TO THE REQUIREMENTS OF NFPA 101 CHAPTER 10. UFC 3-600-01 § 8-1
USE UFC 3-600-01 AND UFC 3-120-10 IN LIEU OF IBC CHAPTER 8. UFC 1-200-01 § 2-8
INTERIOR FINISHES:
DESIGNED AND TESTED IN ACCORDANCE WITH ANSI/UL 555 AND ANSI/UL555S WILL BE INSTALLED.
• WHERE A SMOKE BARRIER IS ALSO CONSTRUCTED AS A FIRE BARRIER, A COMBINATION FIRE/SMOKE DAMPER NFPA 101 § 8.5.5.2.2
DAMPER DESIGNED AND TESTED IN ACCORDANCE WITH ANSI/UL555S WILL BE INSTALLED.
• WHERE SMOKE BARRIERS ARE PENETRATED BY DUCT OR AIR TRANSFER OPENING, A SMOKE NFPA 101 § 8.5.5.2.1
FIRE AND SMOKE DAMPERS
NFPA 850 § 18.3 AND 6.1.1.4
• 2 HOUR FIRE BARRIER SEPARATING SWITCHGEAR ROOM AND BATTERY, CONTROL ROOM. IBC § TABLE 509 AND
• 2 HOUR FIRE BARRIER SEPARATING BATTERY ROOM FROM CONTROL ROOM AND MECHANICAL ROOM. NFPA 855 § 4.3.6
• 1 HOUR FIRE BARRIER SEPARATING MECHANICAL ROOM. UFC 3-600-01 § 7-1
SUBSTATION INTERIOR RATED SEPARATIONS (SEE LIFE SAFETY PLAN)
SPECIFICALLY REFERENCE IBC CHAPTER 7.
CONFORM TO THE REQUIREMENTS OF NFPA 101 CHAPTER 8, EXCEPT WHERE IBC CHAPTERS 5 AND 6 UFC 3-600-01 § 7-1
IBC CHAPTER 7 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-7
FIRE AND SMOKE PROTECTION FEATURES:
• ROOF CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS): 0 HOUR
• FLOOR CONSTRUCTION (INCLUDING SUPPORTING BEAMS AND JOISTS): 0 HOUR
• NON-BEARING WALLS & PARTITIONS - INTERIOR: 0 HOUR
• NON-BEARING WALLS - EXTERIOR SEPARATION DISTANCE >30 FT: 0 HOUR
• BEARING WALLS - INTERIOR: 0 HOUR
• BEARING WALLS - EXTERIOR SEPARATION DISTANCE >30 FT: 0 HOUR
• STRUCTURAL FRAME (INCLUDING COLUMNS, GIRDERS, AND TRUSSES): 0 HOUR
IBC 601 & TABLE 602 ALL
ALLOWABLE COMBUSTIBLE
MATERIALS AS DEFINED IN
SECTION 603
REQUIRED STRUCTURAL ELEMENTS:
• TYPE II-B CONSTRUCTION (IBC) - (000) PER NFPA 220 IBC § 602 & TABLE 601
IBC CHAPTER 6 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-6
TYPES OF CONSTRUCTION:
15 FT AND 1 STORY (GROUP F-1 - SUBSTATION) DEFINITION
• ACTUAL BUILDING HEIGHT AND STORIES: 15 FT AND 1 STORY (OFFICES AND SHOPS) IBC § 502 BUILDING HEIGHT
• ALLOWABLE HEIGHT: 55 FT AND 2 STORIES FOR UNSPRINKLED F-1 BUILDINGS IBC § 504.1 TABLE 504.3/504.4
DEFINITION
• ACTUAL TOTAL BUILDING AREA: 2,073 SF IBC § 502 BUILDING AREA
• ALLOWABLE GROSS SQUARE FEET OF BUILDING: LIMITED FOR UNSPRINKLERED F-1 IBC § Table 506.2
• ALLOWABLE GROSS SQUARE FEET OF BUILDING: UNSPRINKLERED II-B/F-1 = 15,500 IBC § 506.2.1
• BUILDING IS NOT PROTECTED WITH AUTOMATIC SPRINKLERS. IBC § 903.2.4
• TYPE II-B CONSTRUCTION (IBC) - (000) PER NFPA 220 IBC § 602 & TABLE 601
IBC CHAPTER 5 AND UFC 3-600-01 APPLY. UFC 1-200-01 § 2-5
GENERAL BUILDING HEIGHTS AND AREAS:
a If FM-approved transformers are used; the separation distances must follow the requirements of FM Global Data Sheet 5-4, which allows for reduced separation distances.
Less Flammable: See NFPA 70.
Mineral Oil
<500 (1.9)
500 - 5,000 (1.9 - 19)
>5,000 (19)
5 (1.5)
15 (4.6)
25 (7.6)
15 (4.6)
25 (7.6)
50 (15.2)
25 (7.6)
50 (15.2)
100 (30.5)
25 (7.6)
50 (15.2)
100 (30.5)
Less flammable
<10,000 (37.9)
>10,000 (37.9)
5 (1.5)
15 (4.6)
5 (1.5)
15 (4.6)
25 (7.6)
50 (15.2)
25 (7.6)
50 (15.2)
LIQUID
LIQUID
VOLUME
GAL
2-hr Fire-Resistant \6\
Wall /6/
ft. (m)
Non-Combustible \6\ Wall /6/
ft. (m)
Combustible \6\ Wall /6/
ft. (m)
Vertical Distance
ft. (m)
Table 4-4 Separation Distance Between Outdoor Insulated Transformer \6\ Containment /6/ and Buildings
NFPA 70, ARTICLE 450
• INDOOR TRANSFORMERS MUST COMPLY WITH: UFC 3-520-01 §4-24.2 3-1.2
AND 3-520-01 § 3-2.3
• INDOOR SWITCHGEAR MUST COMPLY WITH: NFPA 70, ARTICLE 408
• OCCUPANCY CLASSIFICATION: SPECIAL PURPOSE INDUSTRIAL OCCUPANCY. UFC 3-600-01 §3-2.1.2 IBC 306.1
NFPA 850 § 18.3 AND 6.1.1.4
• OCCUPANCY SEPARATION. UFC 3-600-01 § 3-2.1.2 IBC 509
• APPLIES TO SWITCH GEAR ROOM NFPA 850
• COMPLY WITH NFPA 70 WHEN SPECIFICALLY ADDRESSED BY UFC 3-600-01.
• SWITCHGEAR ROOM
JWAGES
Snapshot
X X
X
XX
X X X X X X X X X X X X X X X
WWWWWWW
W
W W
W W
W W
W W
W W
W W
W
W W
W W
W
W W
W W
W
W
WWWWWWWWWWW
W W
W
WWW
W W
W
W W
W
W
WW
W
W
WWWWWWWWWW
W
W
W
WW
W
W
W
W
W W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W
W W
LIBERATOR STREET
X X X X X X X X X X X X X X X X X X X X X
W W
W W
W W
W W
W W
W W
W W
W
7T H
A
VE
N U
E
BUILDING 1403 MHAFB SWITCHING
SUBSTATION
IDAHO POWER COMPANY
DISTRUBUTION SUBSTATION
.0
0'
27.27'
HOSE LAY - 310'-0" (UP
TO 350FT ALLOWED)
FIRE SEPARATION
DISTANCE
HOSE LAY - 305'-0" (UP
TO 350FT ALLOWED)
HOSE LAY - 310'-0" (UP
TO 350FT ALLOWED)
.0
0'
EXISTING
FIRE HYDRANT
EXISTING
FIRE HYDRANT
FIRE SERVICE ENTRANCE
FIRE SEPARATION
DISTANCE
BLDG 1017
COMM COMMUNICATIONS
ELECTRICAL - PRIMARY
ELECTRICAL - SECONDARY
NATURAL GAS
SANITARY SEWER
STORM DRAIN
POTABLE WATER
EXISTING FIRE HYDRANT
EXISTING WATER VALV
FIRE SEPARATION DISTANCE
HOSE LAY DISTANCE
LEGEND
A1 CODE COMPLIANCE SITE PLAN
SCALE: 1" = 20'
W
E
ES
G
SD
SAN
W
0 20 40
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
PLAN
NORTH
LS102
C O
D E
C O
M
PL
IA
N
C E
SI
TE
P
LA
N
P.
P
H
EL
AN
T.
F
R
EE
M
AN
J.
W
AR
BO
YS 7
O
F
AutoCAD SHX Text X
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text X
AutoCAD SHX Text
WV
TD-1 TD-1TD-1
TD
-1
TD
-1
TD
-1
TD-1 TD-1TD-1
TD
-1
TD
-1
TD
-1
SWITCH
GEAR
CONTROL
COMM
BATTERY
DOOR
2' - 8"
101C
DOOR
2' - 8"
101B
DOOR
2' - 8"
102B
DOOR
3' - 4"
104A
CP-1 BLDG 1017
CLEAR DOOR WIDTH [FEET - INCHES]
OCCUPANT LOAD CAPACITY [NO.OF PEOPLE]
EXIT DOOR TAG
FIRE EXTINGUISHER
OTHERS
LIFE SAFETY NOTES:
1. FOR EXIT LIGHTS AND EMERGENCY LIGHTING, SEE ELECTRICAL
LIGHTING DRAWINGS (E SERIES).
LINE TYPES FOR MEANS OF EGRESS :
TRAVEL DISTANCE
COMMON PATH
SYMBOLCOMPONENT
LIFE SAFETY SYMBOLS:
TD
CP
EXIT DISCHARGE ARROW
EXIT DISCHARGE
EXIT SYMBOL
WALL RATING
2 HOUR FIRE BARRIER
A
B
U .S
. A
IR
F O
R C
E
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
R
EP
AI
R B
AS
E
SW
IT
C H
IN
G
S
TA
TI
O
N , B
LD
G
PO
W
ER
ST
AT
IO
N , B
LD
G
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
BLDG 1406
BLDG 1017
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
LS103
LI
FE
S A
FE
TY
P
LA
N
P.
P
H
EL
AN
T.
F
R
EE
M
AN
J.
W
AR
BO
YS 8
O
F
3/16" = 1'-0"A1 LIFE SAFETY PLAN
MEANS OF EGRESS ARRANGEMENT DISTANCE SCHEDULE
- BUILDING SUMMARY
EGRESS PATH ID
EGRESS DISTANCE
PROVIDED MAXIMUM PERMITTED
CP-1 27' - 6" 50' - 0"
TD-1 132' - 6" 200' - 0"
MEANS OF EGRESS WIDTH CAPACITY - BUILDING
SUMMARY
EXIT ID
PROVIDED EGRESS CAPACITY - LEVEL
COMPONENTS & RAMPS
EGRESS
CAPACITY
FACTOR
CLEAR
WIDTH
OCCUPANT
LOAD
CAPACITY
101B 0.2 2' - 8" 160 101C 0.2 2' - 8" 160 102B 0.2 2' - 8" 160 104A 0.2 3' - 4" 200
LEGEND
SCHEDULES
*SOURCE: NFPA 101§ 7.3.1.2 AND UFC 3-600-01 TABLE 10-1
TOTAL FACILITY AREA 1973 9
104 MECH/ELEC 76 MECHANICAL 500 1
103 BATTERY 70 ELECTRICAL 500 1
102 CONTROL ROOM 335 INDUSTRIAL 100 4
101 SWITCH GEAR 1492 ELECTRICAL 500 3
ROOM
NUMBER ROOM DESCRIPTION
ROOM
AREA
SQ.FT.
ROOM USE
LOAD FACTOR
(SQ.FT. /
PERSON)*
OCCUPANCY
LOAD
OCCUPANCY LOAD SCHEDULE
NOTE: DOUBLE DOORS 101 A EXCEED PERMITTED WIDTH
FOR EGRESS AND ARE FOR MAINTENANCE ACCESS ONLY.
0 2' 4' 8' 12'
PLAN NORTH
1. THIS SHEET INCLUDES CONSTRUCTION WORK AND REPAIR WORK.
GENERAL NOTE:
NORTHING ELEVATION DESCRIPTION
MHAFB 1
KMOA
KMOC
MHAFB 2
15643822.6431 STAINLESS STEEL ROD IN SLEEVE
1942551.4070 2990.30 1951234.8080
15640238.7521 1937609.4120 2986.46
15636250.1971 1941272.9580 3004.05 BRASS CAP IN CONCRETE
1946754.6500 3010.22
BRASS CAP IN CONCRETE
BRASS CAP IN CONCRETE
STAINLESS STEEL ROD IN SLEEVE
PRIMARY SURVEY CONTROL - NORTHINGS AND EASTINGS ARE GRID VALUES
NAME EASTING
KMOB
MHAFB 4
1935889.4980 2984.25
15639271.8481
15635565.6221 3015.41
15631351.2181
STAINLESS STEEL ROD IN SLEEVE
ATCT(BUILDING3600)
BUILDING3601
ALPINE ST
PHANTOM A
VE
NORTHING ELEVATION DESCRIPTION
MHAFB 1
KMOA
KMOC
MHAFB 2
15643822.6431 STAINLESS STEEL ROD IN SLEEVE
1942551.4070 2990.30 1951234.8080
15640238.7521 1937609.4120 2986.46
15636250.1971 1941272.9580 3004.05 BRASS CAP IN CONCRETE
1946754.6500 3010.22
BRASS CAP IN CONCRETE
BRASS CAP IN CONCRETE
STAINLESS STEEL ROD IN SLEEVE
SECONDARY SURVEY CONTROL - NORTHINGS AND EASTINGS ARE GROUND VALUES
NAME NORTHING ELEVATION DESCRIPTION
1/2" REBAR W/YELLOW PLASTIC CAP MARKED LS7881
1/2" REBAR W/YELLOW PLASTIC CAP MARKED LS7881
1/2" REBAR W/YELLOW PLASTIC CAP MARKED LS7881
PRIMARY SURVEY CONTROL - NORTHINGS AND EASTINGS ARE GRID VALUES
NAME EASTING
KMOB
MHAFB 4
1935889.4980 2984.25
15639271.8481
15635565.6221 3015.41
15631351.2181
STAINLESS STEEL ROD IN SLEEVE
EASTING
FIRE HYDRANT
MANHOLE-SANITARY SEWER
BORE HOLE
LEGEND
WATER LINE
SANITARY SEWER
CONTROL POINT
TREE-DECIDUOUS
TRAFFIC SIGN
S/W SIDEWALK
JUNCTION BOX
UNDERGROUND COMMUNICATIONS
NAME EASTINGNORTHINGELEVATION
BORE HOLES
TREE-CONIFEROUS
MANHOLE-COMMUNICATION
NATURAL GAS LINE
ANTI-SIPHON VALVE
IRRIGATION VALVE
FENCE-CHAINLINK
CP_A
MAGNETIC NAIL IN ASPHALT
CP_B
CP_C
CP_D
FENCE-WROUGHT IRON
UNDERGROUND ELECTRICAL LINE
LIBERATOR STREET
2991.56
2991.62
2991.79
2992.09
2991.86
2991.91
2991.80
2991.91
15640561.52
15640526.09
15640553.18
15640519.28
15640490.90
15640503.27
15640455.49
15640484.19
1942852.73
1942886.79
1942914.64
1942948.87
1942921.52
1942922.78
1942956.81
1942984.19
RP_01
RP_02
RP_07
RP_06
RP_03
BH_AG-01
RP_04
RP_05
S/W
2992.56 2992.35 2991.68 2992.11
15640710.9319 15640493.1681 15640372.9574 15640571.6667
1942892.4670 1943122.8450 1943006.7773 1942811.3452
WATER VALVE
MANHOLE-ELECTRIC
7T H A
VENUE
BUILDING 1403
MHAFB SWITCHING
SUBSTATION
IDAHO POW
ER COMPANY
DISTRUBUTION SUBSTATION
GATE
MHAFB 4
KMOA
KMOB
MHAFB 1
KMOC
CP_B
CP_A
LIBERATOR STREET
AARDVARK AVENUE
FALCON STREET
ALPINE STREET
BOMBER STREET
PE
R
IM
ET
ER
R
O
AD
PE
R
IM
ET
ER
R
O
AD
PHANTOM AVENUE
CIVIL ENGINEERING
BUILDING 1300
WATER FILL STATION
NEAR BUILDING 1406
FIRE DEPT.
BUILDING 206 RECYCLING CENTER
BASE EXCHANGE (BX)
HOSPITAL
GRAND VIEW ROAD
(TO HIGHWAY 167)
GRAND VIEW GATE
(CONTRACTOR ACCESS)
GUNFIG
HTER AVENUE WING HQ
BUILDING 512
th
AVENUE
FLIGHTLINE ROAD
AAFES SERVICE STATION
VISITOR'S CENTER
G U
N
FI
G H
TE
R
A
VE
N U
E
MHAFB 2
CP_C
CP_D
7T
H AVENUE
SECONDARY SURVEY CONTROL - NORTHINGS AND EASTINGS ARE GROUND VALUES
NAME NORTHING ELEVATION DESCRIPTION
1/2" REBAR W/YELLOW PLASTIC CAP MARKED LS7881
1/2" REBAR W/YELLOW PLASTIC CAP MARKED LS7881
1/2" REBAR W/YELLOW PLASTIC CAP MARKED LS7881
EASTING
CP_A
MAGNETIC NAIL IN ASPHALT
CP_B
CP_C
CP_D
2992.56 2992.35 2991.68 2992.11
15640710.9319 15640493.1681 15640372.9574 15640571.6667
1942892.4670 1943122.8450 1943006.7773 1942811.3452
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
A1 SURVEY CONTROL MAP
SCALE: 1" = 1000' 0 1000 2000
1. THE HORIZONTAL COORDINATES ARE BASED ON WGS 1984 UTM ZONE 11
NORTH DATUM. THE COORDINATES WERE GLOBALLY SCALED BY A FACTOR
OF 3.2808333333 TO CONVERT FROM METERS TO U.S. SURVEY FEET. THE
PRIMARY SURVEY CONTROL IS THE PERMANENT SURVEY CONTROL
MONUMENTS LOCATED ON THE BASE. THE DATA FOR THE EXISTING BASE
MONUMENTS MHAFB 1, MHAFB 2, AND MHAFB 4 CAN BE OBTAINED FROM THE
NGS DATA SHEETS. THE DATA FOR THE EXISTING BASE MONUMENTS KMOA,
KMOB, AND KMOC WERE PROVIDED BY THE BASE. THE DATA FOR ALL 6
PRIMARY CONTROL MONUMENTS WAS VERIFIED BY A COMBINATION OF
STATIC AND RTK GPS OBSERVATIONS. THE PRIMARY CONTROL HORIZONTAL
COORDINATES SHOWN HEREON ARE GRID VALUES AND HAVE NOT BEEN
SCALED TO GROUND.
2. ELEVATIONS ARE BASED ON NAVD88 DATUM. THE ELEVATIONS SHOWN FOR
THE SECONDARY CONTROL WERE ESTABLISHED BY DIFFERENTIAL LEVELING
FROM THE PRIMARY CONTROL MONUMENT MHAFB 4.
3. THE CONTROL MONUMENTS SHOWN HEREON WERE LOCATED USING
STANDARD TERRESTRIAL TRAVERSE METHODS MEETING THE REQUIRED
ACCURACIES FOR TOPOGRAPHIC CONTROL SURVEYS. THE RESULTING
COORDINATES SHOULD NOT BE USED FOR REPLACING THESE MONUMENTS.
4. THIS SHEET INCLUDES CONSTRUCTION WORK AND REPAIR WORK.
SECURITY FORCES
BUILDING 1013
GENERAL CIVIL NOTES
SUBSTATION
PROJECT SITE
PLAN
NORTH
C-001
SU
R
VE
Y
C O
N
TR
O L
M A
P
J.
B
R
AN
D T
J.
B
R
AN
D T
C . S
TA
TS
ER 9
O
F
AutoCAD SHX Text X
AutoCAD SHX Text S
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text C
AutoCAD SHX Text
IRR
AutoCAD SHX Text
ASV
AutoCAD SHX Text X
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
IRR
AutoCAD SHX Text
IRR
AutoCAD SHX Text
IRR
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
ASV
G G G G G G G G G G G G G G
G G
G G
G G
G G
G G
G G
G
WWWWWWW
W W
W
W W
W W
W W
W
W
WWWWWWWWWWW
W W
W W
W
WWW
W W
W
W
WW
WWWWWWWWWW
SA
N
SA
N
SANSANSANSANSANSANSANSANSANSANSANSANSANSAN
SA
N
SANSAN
SA
N
SA
N
E
E E E E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E
E E E E E E E E E
E
E E
E E
E E
E E E E E E E
EEEEEEEEEEEE E
EEEEEEEEEEEEE
E
E E
E E
E E
E
EEEEEEEEEEE
E E
E
E E
E E
E E
E E
ESESES
ES
ES
ES
ES
COMM
COMM
COMM
COMM
COMM
COMM
COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
C O
M M
COMM
COMM
COMM
COMM
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
COMMCOMMCOMMCOMM
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM COMM COMM COMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMMCOMMCOMMCOMMCOMMCOMMCOMMCOMMCOMM
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
C O
M M
COMM
C O
M M
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
COMM
W
WW
W W
W
W W
W
W
W
W
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
J
W W
W W
COMM COMM COMM COMM COMM
NATIVE G
RASSES
GRAVEL
LIBERATOR STREET
X X X X X X X X X X X X X X X X X X X X X
X X
X X
G R
AV
EL
GRAVEL
NATIVE G
RASSES
W W
W W
W W
W W
W W
W W
W W
W
E E E
G G G G G G G G G G G G G G G G G G G G
G G
COMM
S/W
E E E E E E E E E E
CONIFER TREES - 6RR TIES
7T H
A
VE
N U
E
ELE
CTRIC
AL
VAULT
VAULT
ELE
CTRIC
AL
VAULT
BUILDING 1403 MHAFB SWITCHING
SUBSTATION
IDAHO POWER COMPANY
DISTRUBUTION SUBSTATION
X X
X X
X X
X X
X X
X
X X
X X
X
XXXXXXXX
X X
XXXXX
X X X X X X X X X X X X X X X
7R
7R
7R
7R
7C
7C
11 12
E
E
WW
SA
N
SA
N
SA
N
C O
M M
COMM
W
E
J
E
E E
E E
E
IN
V B=29
.7
IN
V C
=29
.8
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
1. SEE SHEET GC001 FOR GENERAL NOTES TO CONTRACTOR.
2. ASPHALT CONCRETE REMOVALS MUST BE INITIATED WITH A SINGLE FULL DEPTH, VERTICAL SAWCUT.
3. UTILITIES SHOWN ARE APPROXIMATE. LOCATE UTILITIES PRIOR TO COMMENCING WORK. HYDROEXCAVATION OR AIR KNIFE MUST BE USED FOR EXCAVATION IN ANY AREA WHERE EXISTING UTILITY MAY BE ENCOUNTERED. UTILITIES NOT IDENTIFIED TO BE DEMOLISHED, THAT ARE DAMAGED AS PART OF PROJECT WORK, MUST BE REPAIRED AT THE COST OF THE
CONTRACTOR.
4. BOLDED FEATURES REPRESENT FEATURES TO DEMOLISH OR ALTER. PROTECT IN PLACE FEATURES SHOWN IN GRAY.
5. THIS SHEET APPLIES TO CONSTRUCTION WORK AND REPAIR WORK. REFER TO KEYNOTE TABLE FOR CONSTRUCTION AND
REPAIR ITEMS.
6. SUBMIT TRAFFIC CONTROL PLAN TO MHAFB FOR REVIEW AND APPROVAL PRIOR TO BEGINNING CONSTRUCTION.
7. SEE SHEET CS104 FOR COORDINATE LOCATIONS OF DEMOLITION.
8. SEE DETAIL A1 ON CS501 FOR DETAIL OF BASALT REMOVAL.
1 DEMOLISH EXISTING MHAFB SWITCHING SUBSTATION SECURITY FENCE. EXISTING FENCE
ALONG LIBERATOR STREET TO REMAIN. REPAIR
2 DEMOLISH RAILROAD TIES. REPAIR
3 DEMOLISH TREES AND REMOVE STUMPS. REPAIR
4 DEMOLISH IRRIGATION PIPES AND VALVES. PLUG PIPE AS NECESSARY. REPAIR
5 END FENCE REMOVAL. REPAIR
DEMOLISH EXISTING MHAFB SWITCHING SUBSTATION EQUIPMENT AFTER NEW SUBSTATION
IS OPERATIONAL. SEE TRANSITIONING PLAN AND INFORMATION ON SHEET CD102 AND
E-002.
REPAIR
7R 7C
REMOVE ASPHALT ROADWAY SECTION (AND CONCRETE CURB AND GUTTER WHERE IT
EXISTS) TO INSTALL NEW / REMOVE ABANDONED UTILITIES.
REPAIR (R) &
CONSTRUCTION (C)
8 DEMOLISH EXISTING ELECTRICAL. REPAIR
9 DEMOLISH EXISTING SIDEWALK. REPAIR
10 PROTECT EXISTING STRUCTURE IN PLACE. CONSTRUCTION
11 REMOVE ASPHALT PARKING LOT WITHIN LIMITS SHOWN. SAWCUT FULL DEPTH AT REMOVAL
LIMITS. CONSTRUCTION
12 REMOVE CONCRETE CURB AND GUTTER. CONSTRUCTION
SAWCUT AND REMOVE 2 FEET WIDTH OF ASPHALT (ASPHALT TO BE REPLACED AFTER
CURB AND GUTTER PLACEMENT). REPAIR
W
SD
G
SAN
COMM
E
ES
AND REPLACED AFTER TRENCHING IS COMPLETE
DEMO AREA
EXISTING COMMUNICATIONS
EXISTING ELECTRICAL - PRIMARY
EXISTING ELECTRICAL - SECONDARY
EXISTING NATURAL GAS
EXISTING SANITARY SEWER
EXISTING STORM DRAIN
EXISTING FUEL LINE
EXISTING WATER LINE
EXISTING JUNCTION BOX
EXISTING FIRE HYDRANT
EXISTING WATER VALVE
EXISTING IRRIGATION VALVE
EXISTING ANTI-SIPHON VALVE
EXISTING MANHOLE - SANITARY SEWER
EXISTING MANHOLE - ELECTRIC
EXISTING MANHOLE - COMMUNICATION
EXISTING TRAFFIC SIGN
FENCE - CHAINLINK
FENCE - WROUGHT IRON
F
X X
W
GENERAL CIVIL NOTES
SHEET KEYNOTES
LEGEND
A1 SITE DEMOLITION PLAN
SCALE: 1" = 20'
D R
IV
EW
AY
MATCHLINE - SEE THIS SHEET
MATCHLINE - SEE THIS SHEET
0 20 40
MHAFB SWITCHING
SUBSTATION
BUILDING 1403
BLDG
LIBERATOR STREET
7T H
A
VE
N U
E
8T H
A
VE
N U
E
IDAHO POWER COMPANY
DISTRIBUTION SUBSTATION
REMOVE AND STOCKPILE ROCK TO BE KEPT CLEAN
PLAN
NORTH
CD101
SI
TE
D
EM
O
LI
TI
O
N P
LA
N
J.
B
R
AN
D T
J.
B
R
AN
D T
C . S
TA
TS
ER 10
O
F
AutoCAD SHX Text X
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text E
AutoCAD SHX Text
IRR
AutoCAD SHX Text
IRR
AutoCAD SHX Text
IRR
AutoCAD SHX Text C
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text
ASV
AutoCAD SHX Text X
AutoCAD SHX Text S
AutoCAD SHX Text X
AutoCAD SHX Text J
AutoCAD SHX Text C
AutoCAD SHX Text
IRR
AutoCAD SHX Text
ASV
AutoCAD SHX Text
WV
AutoCAD SHX Text E
SHEET ID
H D
R E ng in ee rin g, In c.
E.
P
AR
KC
EN
TE
R B
LV
D
BO
IS
E, ID
(2
) 3
-7
C
ES
/C
EN
M O
U N
TA
IN
H O
M E
AI
R
F O
R C
E
BA
SE
O
C
TO
BE
R
SH
EE
T N
O
AN
SI
D
FA
-2
5- F-
100% DESIGN DOCUMENTS
D
EL
IV
ER
Y N
O
D
ES
IG
N
ED
B
Y:
D
ES
C R
IP
TI
O N
M
AR
K
SI
ZE
SU
BM
IT
TE
D B
Y:
D
AT
E
PR
O
JE
C
T N
O
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
IS
SU
E D
AT
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
H D
R P
R O
JE
C
T N
O
P.
D
ER
R
M O
U N
TA
IN
H O
M E, ID
AH
O
FA
-2 0-
D -0
U .S
. A
IR
F O
R C
E M
O U
N
TA
IN
H
O M
E
AI
R F
O R
C E
BA
SE
R
EP
AI
R
B
AS
E
SW
IT
C
H
IN
G S
TA
TI
O N
, B
LD
G
PO
W
ER
ST
AT
IO
N
, B
LD
G
BLDG 1406
BLDG 1017
1. SEE SHEET GC001 FOR GENERAL NOTES TO CONTRACTOR.
2. COORDINATE ALL DEMOLITION WITH CONTRACTING OFFICER AND PROJECT
MANAGER/PROJECT INSPECTOR PRIOR TO STARTING WORK.
3. THIS SHEET APPLIES TO REPAIR WORK ONLY. ITEMS SHOWN IN RED ON THIS
SHEET MUST BE REMOVED AS REPAIR WORK. DEMOLITION MUST OCCUR
AFTER THE NEW SWITCHGEAR IS OPERATIONAL.
4. STEEL STRUCTURE, POLES, INSULATORS, SWITCHES, FUSE DISCONNECTS,
AUTOMATIC CIRCUIT RECLOSERS, ELECTRICAL BUS, SURGE ARRESTERS,
TRANSFORMERS, PAD MOUNT GEAR, AND OTHER ELECTRICAL APPARATUS
MUST BE TAKEN TO BASE RECYCLING CENTER FOR PROCESSING.
COORDINATE WITH CONTRACTING OFFICER AND PROJECT
MANAGER/PROJECT INSPECTOR PRIOR TO HAULING.
5. ABOVE GRADE CONDUITS AND GROUNDING CONDUCTORS MUST BE
REMOVED AT LEAST 12" BELOW GRADE.
6. BELOW GRADE CONDUITS AND GROUNDING CONDUCTORS MAY BE
ABANDONED IN PLACE.
7. CONCRETE FOUNDATIONS MUST BE COMPLETELY REMOVED AND DISPOSED
AT AN APPROPRIATE WASTE FACILITY. DRILL PIER FOUNDATIONS MUST BE
KNOCKED DOWN AT LEAST 24" BELOW GRADE AND MAY BE ABANDONED IN
PLACE.
8. SURFACE MATERIAL (ROCK) MUST REMAIN IN PLACE.
9. ANY CAVITIES, HOLES OR RUTS CREATED AS A RESULT OF FOUNDATION
REMOVAL AND DEMO WORK MUST BE BACKFILLED WITH SATISFACTORY
MATERIAL PER SPECIFICATION 31 00 00,…