This is Amendment 0003 to Solicitation 19AQMM26R0342 for Seoul OBC Roof Replacements, issued by the Bureau of Global Acquisitions (GA) within the U.S. Department of State on September 4, 2026. The amendment extends the proposal submission deadline from the original date to September 16, 2026 at 3:00 PM ET.

The amendment accomplishes five primary objectives: (1) provides responses to questions submitted by offerors; (2) replaces Attachment 1—OBC Roof Replacement Specifications (dated July 1, 2026) with the amended version dated September 3, 2026; (3) replaces Attachment 2—OBC Roof Replacement Drawings (dated June 12, 2026) with the version amended September 3, 2026; (4) replaces Attachment 4 Price Sheet with a revised document; and (5) extends the proposal due date by three days. All other terms and conditions of the original solicitation remain unchanged. Offerors must acknowledge receipt of this amendment prior to the submission deadline through one of three methods: completing and returning the amendment with items 8 and 15 completed, acknowledging receipt on each copy of the offer submitted, or submitting separate written or electronic communication referencing both the solicitation and amendment numbers. The contracting officer is Ryan C. Edwards, and the administering office is the Maintenance Operations division at the Bureau of Global Acquisitions in Arlington, Virginia.

View the file

Other files

File Type Posted
Attch 4 - Price Sheet (Revised).xlsx XLSX spreadsheet
Attch 1 - OBC Roof Replacement Specifications (Amendment 01).pdf PDF
QandA 1.docx DOCX document
19AQMM26R0342 A002.pdf PDF
Attch 7 - Info For Offerors 1.docx DOCX document
19AQMM26R0342 A001.pdf PDF
Attch 2 - OBC Roof Replacement Drawings.pdf PDF
Attch 4 - Price Sheet.xlsx XLSX spreadsheet
Attch 3 - PPQ.docx DOCX document
Attch 6 - Public Release of Information 20250219.pdf PDF
Attch 5 - Bidders DD-254.pdf PDF
19AQMM26R0342.pdf PDF
Attch 1 - OBC Roof Replacement Specifications.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Number: 19AQMM26R0342 PROCESSED Page 1 of 3

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE RATING

2. AMENDMENT/MODIFICATION NUMBER

3. EFFECTIVE DATE

09/04/2026

4. REQUISITION/PURCHASE REQ. NUMBER 5. PROJECT NUMBER (If applicable)

GAAM_CODE

BUREAU OF GLOBAL ACQUISITIONS (GA)

1200 Wilson Blvd., SA-6B

ATTN: GA

ARLINGTON, VA 22209

US

Ryan C. Edwards

NAME

TEL.

EdwardsRC@state.gov

EMAIL

6. ISSUED BY GAAMCODE

Maintenance Operations

GA/AM/DMS/FAC/MO

Bureau of Global Acquisitions 1200 Wilson Blvd (SA-06B) Arlington, VA 22209

7. ADMINISTERED BY (If other than Item 6)

9A. AMENDMENT OF SOLICITATION NUMBER

19AQMM26R0342

CODE FACILITY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, country, state and ZIP Code) (X)

X 9B. DATED (SEE ITEM 11)

07/27/2026

10A. MODIFICATION OF CONTRACT/ORDER

NUMBER

10B. DATED (SEE ITEM 11)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X XThe above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended, Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning __1__copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______ copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to accomplish the following:

1. Provide responses to the questions received from offerors.

2. Replace Attachment 1 - OBC Roof Replacement Specifications, dated July 1, 2026 with Attachment 1 - OBC Rood Replacement Specifications (Amendment 01), dated September 3, 2026.

3. Replace Attachment 2 - OBC Roof Replacement Drawings, dated June 12, 2026 with Attachment 2 - OBC Roof Replacement Drawings, amended on September 3, 2026.

4. Replace Attachment 4 Price Sheet with the revised document.

5. Extend the proposal due date to September 16, 2026 by 3:00pm ET.

All other terms and conditions remain unchanged

CLOSING DATE/TIME:

09/16/2026 - 15:00 ET US/Eastern Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Ryan C. Edwards

(Signature of person authorized to sign)

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED

By (Signature of Contracting Officer)

16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

09/04/2026

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV.

11/2016) Prescribed by GSA FAR (48 CFR) 53.243

CGFS // CGFS

Document Number: 19AQMM26R0342 PROCESSED Page 2 of 3

Table of Contents

Section Description Page Number

Document Number: 19AQMM26R0342 PROCESSED Page 3 of 3

Line Item Summary

Solicitation Number:

19AQMM26R0342

Contract Number: Title:

Seoul OBC Roof Replacements

Date of Solicitation:

09/04/2026

CLIN Funding: Cost:

Base Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

Exercised Options Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

Unexercised Options Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

Base and Options Totals: Original: $0.00

Change: $0.00

Current: $0.00

Original: $0.00

Change: $0.00

Current: $0.00

File details come from the government source that posted it. Updated .