This document is a Questions and Answers file (Q&A #4) for the Department of State's Worldwide Envelope, Roofing, and Waterproofing Architect & Engineering (A&E) Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The solicitation (19AQMM25R0079) seeks A&E services for building envelope repairs, with a focus on cleared American personnel performing work on the Department of State's existing 18,000-building inventory. Key requirements include submitting fixed labor rates for the first year plus four option years, conducting site surveys, performing design reviews (typically at 60%/90%/100% stages), and executing quality assurance inspections.
The Q&A clarifies multiple technical and procedural aspects of the contract, emphasizing that task orders will define specific scope, performance periods, and requirements. Important notes include: only cleared American personnel are allowed on-site, the A&E must perform their own testing and repairs, and local or uncleared contractors are prohibited. The contract's scale is flexible, with OBO potentially awarding between one to five IDIQ contracts based on qualification package reviews. Proposals are due by March 17, 2025, at 3:00 PM ET, with a question submission deadline of March 4, 2025, at 4:00 PM ET.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
19AQMM25R0079 Questions and Answers #4
1. SOW_C.5.4 & C.5.5: Can OBO confirm that it is OBO’s intention for Post to provide the list of pre-vetted local roofing and/or general contractors for the A/E teams utilize during site surveys?
DOS Response: The Statement of Work standard operating procedure (SOP) requires the A&E to preform local research and develop a list of local contractors to the USG.
2. SOW_C.5: Is the A/E Contractor responsible for repairing damages from testing and investigating during the survey or will Post make the repairs?
a. If the repair responsibility falls to the A/E, can OBO confirm its intention for Post to provide security-vetted local general and roofing contractors to avoid pre-survey vetting delays?
b. For local contractor support during surveys (e.g., scaffolding), does OBO typically structure these costs as:
i. Reimbursable expenses requiring PM coordination hours, or
ii. Fixed-price line items with risk contingencies?
DOS Response: The Statement of Work standard operating procedure (SOP) requires the A&E to perform testing and if destruction to repair after the test. All A&E in the past have carried a test kit to include tools and patch materials during site-visits. If the A&E firm cannot perform this service, do not submit a proposal.
This IDIQ Contract is for A&E services requires cleared American personnel. Local or uncleared contractors shall not be allowed on USG property in association with the A&Es work.
3. SOW_C.5: Could OBO clarify whether time/personnel allocations for site surveys are typically defined per task order or left to A/E discretion during pricing?
DOS Response: The Statement of Work shall define time and personnel requirements under each Task Order. This IDIQ Contract is for A&E services requires submission of cleared American personnel fixed labor rates for first year plus four option years.
4. SOW_C.5.2: Can OBO clarify expectations for sub-grade waterproofing inspections? Does OBO typically require A/Es to perform/document test cuts (with photos) or coordinate excavation efforts with local contractors?
DOS Response: The Statement of Work shall define specific scope requirements under each Task Order.
5. SOW_C.6 & C.7: Does OBO intend to establish separate Periods of Performance for Bridging vs. Contract Design phases in most task orders?
a. What is OBO's typical timeframe for IFC design reviews/issuance to roofing contractors?
DOS Response: The Statement of Work shall define specific period of performance tasks under each Task Order.
6. SOW_C.7: Does OBO prefer individual labor rates for support roles (Schedulers, Cost Estimators) or blended rates?
DOS Response: This IDIQ Contract is for A&E services requires submission of cleared American personnel fixed labor rates for first year plus four option years.
7. SOW_C.7: How will design reviews be scheduled, e.g., 60%/90%/100%?
DOS Response: The Statement of Work shall define specific scope requirements under each Task Order. Generally, OBO design reviews follow the 60% / 90% / 100% and Final Submission format.
8. SOW_C.9.3: Submitting QA Daily Reports at the end of each day may not allow sufficient time for Home Office/Designer review. Would a 48-hour grace period after the end of each workday be acceptable?
DOS Response: The Statement of Work standard operating procedure (SOP) requires the A&E to submit Quality Assurance Inspection Daily Reports – Keyword is daily. If the A&E firm cannot perform this service, do not submit a proposal.
9. SOW_C.10: Does OBO typically define timeframes/team sizes for warranty inspections per task order, or are these factors generally determined by the A/E during proposal pricing based on project scope?
DOS Response: The Statement of Work shall define specific scope, team composition, and period of performance requirements under each Task Order.
10. SOW_C.10.2: Could OBO outline typical roles for tracking/communicating 2-year warranty inspections between A/E, Post, and OBO Roofing teams?
11. SOW_C.11.1: Could OBO confirm if projects typically follow:
a) Base IBC standards without state amendments
b) Regional adaptations for seismic/hurricane zones per post location
c) Hybrid approach determined per task order?
DOS Response: The Statement of Work shall define specific scope and industry references requirements under each Task Order.
12. SOW General: Will OBO require regular progress reports during the design phases?
DOS Response: The Statement of Work shall define specific scope requirements under each Task Order. Generally, building envelop design phases are very short duration; the phased 60% / 90% / 100% and Final submissions are considered progress reports.
13. SOW General: Does OBO anticipate any projects on New Embassy Compounds (NECs)?
DOS Response: This IDIQ Contract is for A&E services with OBO Facility Management which requires cleared American personnel to perform on the existing inventory of structures. OBO has spent over $90.0M on building envelope repairs on less than ten-year old New Embassy Compound buildings.
14. SOW General: Is there a limit of subconsultants the A/E can submit/collaborate with?
DOS Response:This IDIQ Contract is for A&E services requires cleared American personnel. Local or uncleared contractors shall not be allowed on USG property in association with the A&Es work.
15. SOW General: How many A/E’s does OBO intend to award IDIQ contracts to?
DOS Response: Unknown until the qualification packages are reviewed for selection. OBOs past number of Building Envelope A&E IDIQ contracts has ranged from one to five firms.
16. IDIQ_B.2.1: May subconsultants be added or removed during the yearly optional IDIQ contract renewals based on new needs for the Prime A/E team?
DOS Response: This IDIQ Contract is for A&E services requires cleared American personnel. Local or uncleared contractors shall not be allowed on USG property in association with the A&Es work.
Keep in mind the time to obtain a facility security clearance followed by individual clearances for personnel ranges from three-months to two-years.
17. IDIQ_B.5.1: Are we required to list and price all potential equipment that may be needed to complete this IDIQ, or may these be determined for each individual Task Order?
DOS Response: This IDIQ Contract is for A&E services requires submission of cleared American personnel fixed labor rates for first year plus four option years. A&E may include rates for specific specialized equipment.
18. IDIQ_B.7.2: Given the Fly America Act requirements in Sect H.15, does OBO anticipate granting blanket travel waivers for non-U.S.-based personnel traveling between foreign locations when no U.S. carriers operate directly between the two countries?
DOS Response: This IDIQ Contract is for A&E services requires firms to follow the government travel regulations which includes Fly America Act. Generally, US air carriers only fly from US cities to aboard, then use a co-chair airlines.
19. IDIQ_G.3: Will OBO consider a 2-week team assembly/qualification submittal period to Task Orders to allow flexibility for complex task orders?
DOS Response: The Statement of Work shall define specific scope requirements under each Task Order.
20. IDIQ_L.2.4: Are there any page or format requirements, e.g., page maximum, for the Technical Volume?
DOS Response: Generally there is a double sided page maximum specified in the announcement.
21. IDIQ_General: How many Task Orders does OBO intend to issue each year under this IDIQ, approximately? Are the locations for these Task Orders known? Can OBO share a potential list of locations?
DOS Response: This IDIQ Contract is for A&E services to perform on the existing inventory of structures. OBO has an inventory of 18,000 buildings, and we haven’t found one without a roof. The locations and number of task orders shall be issued based on funds available within a fiscal year. Generally, there is a maximum yearly and overall contract sum specified in the announcement.
22. IDIQ_General: For recognized holidays where there is no work on site, can the time and reimbursable costs for the QA Construction Inspectors be included in the time-and-material contract?
23. IDIQ_General: Could OBO clarify how material testing (e.g., core samples, membrane integrity checks) is typically handled? Should A/Es include testing lab coordination in proposals, or does OBO prefer these services be managed through separate contracting vehicles suggested in Section B.6?
DOS Response: The Statement of Work standard operating procedure (SOP) requires the A&E to perform testing and if destruction to repair after the test. All A&E in the past have carried a test kit to include tools and patch materials during site-visits. If the A&E firm cannot perform this service, do not submit a proposal.
A&E SECTION