1937.08_City_Hall_Computer_Room_HVAC_Drawings.pdf

PDF 2 MB Posted

Attached to
Computer Room HVAC Upgrade
Solicitation number
Quote- 26 - 205
Issued by
Pinellas County, Florida

About this file

This is a set of architectural and mechanical engineering drawings for the City of St. Petersburg, Florida's Computer Room HVAC Upgrade project at City Hall, located at 175 5th Street North, St. Petersburg, FL 33701. The project, identified as City Project No. 1937.08, involves the installation of additional HVAC equipment and associated electrical work, infill wall opening at the HVAC unit removal location, and associated finishes. The drawings, dated January 25, 2023, and prepared for 100% Owner Review, were developed by Engineering Matrix, Inc. (consulting mechanical, electrical, and plumbing engineer) and Renker Eich Parks Architects. The project is classified as an Alteration Level 2 work under Building Occupancy Group A (Assembly, A-3 Community Hall) and Group B (Business, Civic Administration), with construction type VB (unprotected, fully sprinklered). The drawing set includes architectural floor plans, mechanical symbols and schedules, mechanical details, and electrical plans for the basement level work.

The project scope includes demolition of the existing 5-ton Liebert HVAC unit and installation of a new 3.5-ton conventional split-style air conditioning system with floor-mounted indoor air handler unit, outdoor condenser unit, and associated refrigerant piping. A separate standalone humidifier system with a capacity of 5 pounds per hour must also be installed. The contractor is responsible for field verification of all existing conditions, obtaining all necessary permits and inspections, protecting existing finishes during construction, maintaining building security and water tightness throughout construction, and coordinating all work with subcontractors. The contract is designated as a sheltered bid requiring that at least 20 percent of the contracting effort, including supply costs, be self-performed by the SBE (Small Business Enterprise) prime contractor. All work must comply with applicable 2020 Florida Building Codes and the 2020 Florida Fire Prevention Code.

View the file

Other files

File Type Posted
Computer_Room_HVAC_Upgrade.pdf PDF
Subcontractor_Summary_Spreadsheet.xlsx XLSX spreadsheet
SSC_-_SS-1-5_-_As_Built_Drawings.pdf PDF
Light_Construction_Agreement.docx DOCX document
SSC_-_SS-1-5_-_Product_Report.pdf PDF
Public_Construction_Bond.docx DOCX document
1937.08_City_Hall_-_Computer_Room_HVAC_-_Drawings_100%_CD's_Review.pdf PDF
Subcontractor_Summary_-_Sheltered_.xlsx XLSX spreadsheet
Quote_Addendum.docx DOCX document
Subcontractor_Utilization_Plan.docx DOCX document
Performance_&_Payment_Bond_.DOCX DOCX document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX OF DRAWINGS

I ARCHITECTURAL

00000- 01 - COVER

00000- 02 GA1.0 GENERAL ARCHITECTURAL

00000- 03 A1.0 BASEMENT FLOOR PLAN

II MECHANICAL

00000- 04 M0.0 MECHANICAL SYMBOLS LEGEND

00000- 05 M0.1 MECHANICAL DETAILS

00000- 06 M0.2 MECHANICAL SCHEDULES

00000- 07 M1.0 BASEMENT FLOOR PLANS - MECHANICAL

III ELECTRICAL

00000- 08 E0.0 ELECTRICAL GENERAL

00000- 09 E1.0 BASEMENT FLOOR PLANS - ELECTRICAL

CITY PROJECT NO.

BREJESH PRAYMAN, PE., ENV SP

E N G I N E E R I N G a n d C A P I T A L I M P R O V E M E N T S D E P A R T M E N T C I T Y o f S T . P E T E R S B U R G , F L .

APPROVED FOR BID

ENGINEERING DIRECTOR

DATE

CENTRAL

AV NO

AV NO

AV NO

AV NO

AV NO

AV

AV SO

AV SO

AV SO

AV SO

AV SO

AV SO

PINELLAS POINT DR

ST

ST

ST

ST

ST

ST

ST

ST

ST

54 AV NO

54 AV NO

83 AV NO

CITY LIMIT

TYRONE

PIN

ELLAS TR

AIL

PARK ST

BLVD

CITY LIMIT

PA

SA

D

EN

A

V

LAKE

MAGGIORE

CITY

L

IM

IT

PINELLAS

BAYWAY

HAINES

RD

ROOSEVELT BLVD

ULMERTON RD

CITY LIMIT

GANDY BLVD

B O C A C I E G A B A Y

T

M

P

B

Y

ALT

ALT

S C A L E :

1.00" = 4,000'

2000 0

4000 8000

GULFPORT

CITY HALL

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

JANUARY 25, 2023

COMPUTER ROOM HVAC UPGRADES FOR

21203

100% OWNER REVIEW

00000- 01

PROJECT LOCATION

175 5TH STREET N

A1.1

TYP

*101

Name Elevation

A1.1

TYP

1i

N

1 DRAWING TITLE

1/8" = 1'-0"A1.1

A1.1

TYP

DRAWING TITLE

VIEW SCALE

SECTION NUMBER

LOCATION SHEET

DETAIL NUMBER

LOCATION SHEET

DETAIL NUMBER

LOCATION SHEET

ELEVATION MARK

DOOR TAG

SPECIFIC NOTE

PARTITION TYPE

1t WINDOW / LOUVER TYPE

?X

MECHANICAL, ELECTRICAL, PLUMBING ENGINEER

ENGINEERING MATRIX, INC.

2860 Scherer Drive, Suite 640 St. Petersburg, FL 33716

(t) 727.573.4656

ARCHITECT

RENKER EICH PARKS ARCHITECTS

1609 Dr. MLK Jr. Street North St. Petersburg, FL 33704

(t) 727.821.2986 reparch.com

PROJECT DESCRIPTION: ADDITIONAL HVAC EQUIPMENT & ASSOCIATED ELECTRICAL

WORK, INFILL WALL OPENING AT HVAC UNIT REMOVAL &

ASSOCIATED FINISHES

OCCUPANCY CLASSIFICATION:

GROUP A, ASSEMBLY (A-3) Community Hall GROUP B, BUSINESS (B) Civic Administration

(MAINTAINING EXISTING OCCUPANCY AND FIRE SEPARATION)

CLASSIFICATION OF WORK: ALTERATION LEVEL 2

THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT.

CONSTRUCTION TYPE: TYPE VB - UNPROTECTED, FULLY SPRINKLERED

FIRE RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:

STRUCTURAL FRAME: 0 HOURS

BEARING WALLS: 0 HOURS

NONBEARING WALLS EXTERIOR: 0 HOURS

NONBEARING WALLS INTERIOR: 0 HOURS

FLOOR CONSTRUCTION: 0 HOURS

ROOF CONSTRUCTION: 0 HOURS

ENGINEERING and CAPITAL

IMPROVEMENTS DEPARTMENT

CITY of ST. PETERSBURG

DATE:

DATE:

DATE:DRAWN BY:

CHECKED BY:

DESIGNED BY: DATE:

DRAWING No.

SCALE:

R E V I S I O N S BY DATE

APPROVED BY:

SHEET NO.:

PROJECT NO.:

SHEET TITLE:

CITY PROJECT NO.

As indicatedCITY HALL

PCP

GA1.0

GENERAL

ARCHITECTURAL

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

1937.08

JANUARY 25, 2023COMPUTER ROOM HVAC UPGRADES FOR

21203 00000- 02

100% OWNER REVIEW

ARCHITECTURAL ABBREVIATIONS

DRAWING LEGEND

DIMENSION NOTES

1 ALL DOOR FRAME OPENINGS IN MASONRY SHALL BE 3'-4" MO UNO

2 ALL DIMENSION STRINGS SHALL BE TO FACE OF WALL STRUCTURE (IE

CMU, MTL STUD FRAMING)

3 DIMENSION STRINGS NOTED AS CLEAR SHALL BE TO FACE OF FINISHED

WALL OR PARTITION (IE FACE OF GWB, PLASTER, OR TILE)

4 DOOR JAMB RETURNS IN MASONRY WALLS TO HINGE SIDE SHALL BE 8"

NOM UNO

5 DOOR JAMB RETURNS IN MTL FRAMING WALLS TO HINGE SIDE SHALL BE

4" NOM UNO

KIT KITCHEN

KW KILOWATT

L LENGTH

LAM LAMINATE

LAV LAVATORY

LF LINEAR FEET

LKR LOCKER

LL LEAD LINED

MFD MANUFACTURED

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIR MORROR

MISC MISCELLANEOUS

MLDG MOLDING

MO MASONRY OPENING

MR MOISTURE RESISTANT

MT METAL THRESHOLD

MTD MOUNTED

MTL METAL

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLUMB PLUMBING

PLWD PLYWOOD

PNT PAINT

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PVC POLYVINYL CHLORIDE

QT QUARRY TILE

R RADIUS

RCP REINFORCED CONCRETE PIPE

RD ROOF DRAIN

REC RECEPTACLE

REF REFRIGERATOR

REG REGLET

REINF REINFORCED

REQD REQUIRED

RM ROOM

RO ROUGH OPENING

SCHD SCHEDULE

SCRN SCREEN

SEC SECTION

SH SHELF

SHT SHEET

SIM SIMILAR

SP SPACE

SPECS SPECIFICATIONS

SS STAINLESS STEEL

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

TB TOGGLE BOLT

TC TOILET COMPARTMENT

TEL TELEPHONE

TEMP TEMPERATURE

TPD TOILET PAPER DISPENSER

TYP TYPICAL

UC UNDERCOUNTER

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

VB VINYL BASE

VERT VERTICAL

VEST VESTIBULE

VIF VERIFY IN FIELD

VWC VINYL WALLCOVERING

W WIDTH

W/ WITH

WC WATER CLOSET

WD WOOD

WP WEATHER PROOF

WWF WELDED WIRE FABRIC

AB ANCHOR BOLT

ACOUST ACOUSTICAL

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

AP ACCESS PANEL

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AT ACOUSTICAL TILE

BD BOARD

BFE BASE FLOOD ELEVATION

BLDG BUILDING

BM BEAM

BOT BOTTOM

BUR BUILT-UP ROOFING

C.F.C.I. CONTRACTOR FURNISHED

AND CONTRACTOR

INSTALLED

CAB CABINET

CG CORNER GUARD

CI CAST IRON

CJ CORNER JOINT

CL CLEAR

CLO CLOSET

CMU CONCRETE MASONRY UNIT

CNT COUNTER

COL COLUMN

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

CONTR CONTRACTOR

CORR CORRIDOR

CPT CARPET

CT CERAMIC TILE

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DWG DRAWING

EB EXPANSION BOLT

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATION

EP ELECTRICAL PANEL

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

FC FURRING CHANNEL

FD FLOOR DRAIN

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FHC FIRE HOSE CABINET

FIN FINISH

FL FLOOR

FR FIRE RATED

GA GUAGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GFRC GLASS FIBER REINFORCED

CEMENT

GFRG GLASS FIBER REINFORCED

GYPSUM

GL GLASS

GR GRADE

GWB GYPSUM WALLBOARD

GYP GYPSUM

HB HOSE BIB

HT HEIGHT

HVAC HEATING, VENTILATING, & AIR

CONDITIONING

ID INSIDE DIAMETER

INSUL INSULATION

INT INTERIOR

JT JOINT

APPLICABLE CODES

2020 FLORIDA BUILDING CODE - BUILDING

2020 FLORIDA BUILDING CODE - EXISTING BUILDING

2020 FLORIDA BUILDING CODE - MECHANICAL

2020 FLORIDA BUILDING CODE - PLUMBING

2020 FLORIDA BUILDING CODE - FUEL GAS

2020 FLORIDA BUILDING CODE - TEST PROTOCOLS

2020 FLORIDA BUILDING CODE - ENERGY (Chapter 13)

2020 FLORIDA BUILDING CODE - ACCESSIBILITY

2020 FLORIDA FIRE PREVENTION CODE, 7th EDITION

2018 NFPA 70 NATIONAL ELECTRICAL CODE

2016 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE

2018 NFPA 101 FIRE SAFETY CODE

GENERAL PROJECT NOTES

THE FOLLOWING GENERAL NOTES PERTAIN TO THE ENTIRE SET OF

CONTRACT DOCUMENTS: DRAWINGS AND SPECIFICATIONS

1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE

FEDERAL, STATE, COUNTY, AND CITY CODES, RULES, REGULATIONS AND

ORDINANCES.

2. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DETAILS,

AND DIMENSIONS OF THE WORK PRIOR TO FABRICATION. NOTIFY

ARCHITECT OF ANY DISCREPANCIES BETWEEN THESE CONDITIONS AND

THE DRAWINGS. ALL SUB-CONTRACTORS ARE REQUIRED TO

COORDINATE THEIR WORK WITH OTHER TRADES.

3. CONTRACTOR SHALL PROTECT EXISTING FINISHES AND DEVICES DURING

DEMOLITION AND CONSTRUCTION TYP. ALL EXISTING CEILING, FLOOR,

AND WALL FINISHES INDICATED TO REMAIN, THAT ARE LEFT IN A STATE

OF DISREPAIR BY THE DEMOLITION OR CONSTRUCTION PROCESS SHALL

BE REPAIRED TO MATCH SIMILAR AND/ OR ADJOINING SURFACES.

4. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS AND

INSPECTIONS REQUIRED, AND SHALL PAY FOR ALL.

5. THE CONTRACTOR IS TO ENSURE THAT THE BUILDING IS SEALED AND

SECURED AT THE END OF EACH WORK DAY. VERIFY BUILDING SPECIFIC

SECURITY REQUIREMENTS WITH OWNER PRIOR TO PROCEEDING WITH

WORK. THE CONTRACTOR SHALL MAINTAIN A CLEAN AND ORGANIZED

JOB SITE ACCEPTABLE TO THE OWNER.

6. THE CONTRACTOR SHALL SCHEDULE AND PERFORM ALL CONSTRUCTION

WORK SUCH THAT SECURITY AND WATER TIGHTNESS OF THE EXISTING

BUILDING IS MAINTAINED 100% OF THE TIME THROUGHOUT THE

CONSTRUCTION PERIOD. COORDINATE WITH AND FOLLOW THE OWNERS

DIRECTIONS.

7. THE CONTRACTOR IS TO COORDINATE ALL WORK WITH THE

REQUIREMENTS OF EACH OF THE CONTRACT DRAWINGS AND THE

PROJECT MANUAL CONTAINING THE TECHNICAL SPECIFICATIONS.

8. THE CONTRACTOR SHALL COORDINATE AND BE RESPONSIBLE FOR

FURNITURE AND EQUIPMENT RELOCATION/ PROTECTION AS REQUIRED

FOR THE COMPLETE RENOVATION WORK. THE GENERAL CONTRACTOR

SHALL COORDINATE WITH THE WORK OF ALL SUBCONTRACTORS.

9. THE CONTRACTOR SHALL BE RESPONSIBLE FOR/ AND OVERSEE THE

PROPER AND NEAT INSTALLATION OF ALL NEW WORK BY HIS SUB

CONTRACTORS AND OTHER VENDORS. CONTRACTOR SHALL FURNISH

ALL LABOR, MATERIALS, AND EQUIPMENT AS REQUIRED TO COMPLETE

WORK.

10. SEAL ALL PENETRATIONS IN WALLS, FLOORS AND CEILINGS. SEALANTS

SHALL BE COMPATIBLE WHERE IN CONTACT WITH ONE ANOTHER.

ISOLATE ALL DISSIMILAR MATERIALS.

11. ALL FIRE RATED WALLS TO BE NOTED IN STENCIL ABOVE FINISHED

CEILING PER APPLICABLE CODE.

12. CONTRACTOR TO HAVE PORTABLE FIRE EXTINGUISHER PLACED ON

FLOOR DURING CONSTRUCTION.

13. TO THE GREATEST EXTENT POSSIBLE, THE RESTORATION WORK SHALL

BE IN ACCORDANCE WITH:

"THE SECRETARY OF THE INTERIOR'S STANDARDS FOR REHABILITATION

AND GUIDELINES FOR REHABILITATING HISTORIC BUILDINGS", U.S.

DEPARTMENT OF THE INTERIOR, NATIONAL PARK SERVICE. WHERE

DECISIONS REGARDING HISTORIC APPROPRIATENESS ARE REQUIRED,

THE ARCHITECT SHALL BE NOTIFIED AND BE REQUESTED TO PROVIDE

INTERPRETATION OF APPROPRIATENESS IN CONSULTATION WITH THE

OWNER, PRIOR TO PROCEEDING ON THE WORK IN QUESTION.

CONTRACTOR TO OBTAIN LOCAL C.O.A. FOR ALL EXTERIOR

MODIFICATIONS.

14. CONTRACTOR TO USE WIRE TRAYS IN CORRIDORS WHERE WIRE TRAYS

ARE INSTALLED.

BUILDING CODE SUMMARY

ET

P

P

V-5

V-4 6"�

4"�

6"� 6"�

4"�

VENDVEND

X X

X X

X X

X X

X X

X X

X X

X

DN

005A

ELECT.

005B

BATTERY

TELE/COMM.

ROOM

005C

ELECT/TELEPHONE

006A

CONTROL

STORAGE

TV

CONTROL

CORRIDOR

040403

NEW INFILL WALL

3-5/8" MTL STUD

(2) LAYERS 5/8" GWB, EACH SIDE

4" SOUND ATTENUATION BATT

MATCH EXIST WIDTH AND FINISH

005A

ELECT.

005B

BATTERY

TELE/COMM.

ROOM

005C

ELECT/TELEPHONE

006A

CONTROL

STORAGE

TV

CONTROL

CORRIDOR

D1

7' - 7"

TELE/COMM. ROOM

ELECT/TELEPHONE

005CCONTROL

006A

STORAGE

006 02

ENGINEERING and CAPITAL

IMPROVEMENTS DEPARTMENT

CITY of ST. PETERSBURG

DATE:

DATE:

DATE:DRAWN BY:

CHECKED BY:

DESIGNED BY: DATE:

DRAWING No.

SCALE:

R E V I S I O N S BY DATE

APPROVED BY:

SHEET NO.:

PROJECT NO.:

SHEET TITLE:

CITY PROJECT NO.

As indicatedCITY HALL

JMV

A1.0

BASEMENT FLOOR

PLAN

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

1937.08

JANUARY 25, 2023COMPUTER ROOM HVAC UPGRADES FOR

21203 00000- 03

100% OWNER REVIEW

N

1/4" = 1'-0"A1.0

1 BASEMENT FLOOR PLAN

PLAN LEGEND

BASEMENT KEY

N

1/4" = 1'-0"A1.0

BASEMENT FLOOR

DEMOLITION PLAN

N

1/4" = 1'-0"A1.0

BASEMENT REFLECTED

CEILING PLAN

SPECIFIC DEMO NOTES

D1 DEMOLISH EXISTING LIEBART UNIT, REFER TO MECH

SPECIFIC NOTES

01 PROVIDE CARPET TILE TO MATCH EXIST

02 PROVIDE APC SYSTEM TO MATCH EXIST

03 ACOUSTICAL JOINT SEALANT, FULL PERIMETER AND PAINT NEW WALL, BOTH SIDES

04 NEW EQUIPMENT, REFER TO MECHANICAL AND ELECTRICAL

05 COORDINATE MANUFACTURER EQUIPMENT MOUNTING REQUIREMENTS AND PROVIDE

STUD WALL BLOCKING AS NECESSARY

XXX

M0.0

XXXX - XX

XXX

CITY PROJECT NO.

ENGINEERING and CAPITAL

IMPROVEMENTS DEPARTMENT

CITY of ST. PETERSBURG

DATE:

DATE:

DATE:DRAWN BY:

CHECKED BY:

DESIGNED BY: DATE:

DRAWING No.

SCALE:

R E V I S I O N S BY DATE

APPROVED BY:

© 2023 Engineering Matrix, Inc.

CONSULTING ENGINEERS

SHEET NO.:

PROJECT NO.:

SHEET TITLE:

CITY HALL

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

COMPUTER ROOM HVAC UPGRADES FOR

21203

100% OWNER REVIEW

As Indicated

JANUARY 25, 2023

1937.08

GFB

MECHANICAL

SYMBOLS

LEGEND

XXX

M0.1

XXXX - XX

XXX

CITY PROJECT NO.

ENGINEERING and CAPITAL

IMPROVEMENTS DEPARTMENT

CITY of ST. PETERSBURG

DATE:

DATE:

DATE:DRAWN BY:

CHECKED BY:

DESIGNED BY: DATE:

DRAWING No.

SCALE:

R E V I S I O N S BY DATE

APPROVED BY:

© 2023 Engineering Matrix, Inc.

CONSULTING ENGINEERS

SHEET NO.:

PROJECT NO.:

SHEET TITLE:

CITY HALL

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

COMPUTER ROOM HVAC UPGRADES FOR

21203

100% OWNER REVIEW

As Indicated

JANUARY 25, 2023

1937.08

GFB

MECHANICAL

DETAILS

XXX

M0.2

XXXX - XX

XXX

CITY PROJECT NO.

ENGINEERING and CAPITAL

IMPROVEMENTS DEPARTMENT

CITY of ST. PETERSBURG

DATE:

DATE:

DATE:DRAWN BY:

CHECKED BY:

DESIGNED BY: DATE:

DRAWING No.

SCALE:

R E V I S I O N S BY DATE

APPROVED BY:

© 2023 Engineering Matrix, Inc.

CONSULTING ENGINEERS

SHEET NO.:

PROJECT NO.:

SHEET TITLE:

CITY HALL

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

COMPUTER ROOM HVAC UPGRADES FOR

21203

100% OWNER REVIEW

As Indicated

JANUARY 25, 2023

1937.08

GFB

MECHANICAL

SCHEDULES

005A

ELECT.

005B

BATTERY

TELE/COMM.

ROOM

005C

ELECT/TELEPHONE

006A

CONTROL

STORAGE

TV

CONTROL

CORRIDOR

VENDVEND

X X

X X

X X

X X

X X

X X

X X

X

DN

ET

P

P

V-5

V-4 6"∅

4"∅

6"∅ 6"∅

4"∅

005A

ELECT.

005B

BATTERY

TELE/COMM.

ROOM

005C

ELECT/TELEPHONE

006A

CONTROL

STORAGE

TV

CONTROL

CORRIDOR

SMW

M1.0

XXXX - XX

SMW

CITY PROJECT NO.

ENGINEERING and CAPITAL

IMPROVEMENTS DEPARTMENT

CITY of ST. PETERSBURG

DATE:

DATE:

DATE:DRAWN BY:

CHECKED BY:

DESIGNED BY: DATE:

DRAWING No.

SCALE:

R E V I S I O N S BY DATE

APPROVED BY:

© 2023 Engineering Matrix, Inc.

CONSULTING ENGINEERS

SHEET NO.:

PROJECT NO.:

SHEET TITLE:

CITY HALL

175 5th STREET NORTH, ST. PETERSBURG, FL 33701

COMPUTER ROOM HVAC UPGRADES FOR

21203

100% OWNER REVIEW

As Indicated

JANUARY 25, 2023

1937.08

GFB

BASEMENT

FLOOR PLANS -

MECHANICAL

N

1/4" = 1'-0"M1.0

1 BASEMENT FLOOR PLAN - MECHANICAL

BASEMENT KEY

N

1/4" = 1'-0"M1.0

BASEMENT FLOOR

DEMOLITION PLAN - MECHANICAL

Sheets
- - COVER
A1.0 - BASEMENT FLOOR PLAN
GA1.0 - GENERAL ARCHITECTURAL
COSP City Hall Computer Room HVAC upgrades MEP Dwgs.pdf
M0.0
Sheets and Views
M0.0
M0.1
Sheets and Views
M0.1
M0.2
Sheets and Views
M0.2
M1.0
Sheets and Views
M1.0
E0.0
E1.0

File details come from the government source that posted it. Updated .