IOI PH4-5 _Pre-Proposal Agenda_Final.pdf

PDF 235 KB Posted

Attached to
Nogales IOI Rehabilitation Phase 4 & 5
Solicitation number
191BWC22R0005
Issued by

View the file

Other files

File Type Posted
191BWC22R0005 Amendment A00004.pdf PDF
191BWC22R0005_Solicitation_Revised_A00002_draft.pdf PDF
191BWC22R0005 Amendment A00003.pdf PDF
CON_PenaBlancaHighlandsSouthOffsite_as builts.pdf PDF
191BWC22R0005_IOI_Rehab_PH45_Specs_20220602.pdf PDF
CityofNogales_20200924_Pena Blanca Outfall Sewer As-Built.pdf PDF
191BWC22R0005_Solicitation_Revised_A00002.pdf PDF
Responses_to_Additional_Questions_Received_Against_191BWC22R0005.pdf PDF
NIOI Hydrographs_20220524.pdf PDF
City of Nogales Flow Information Lift Station.pdf PDF
191BWC22R0005 Amendment A00002.pdf PDF
191BWC22R0005_Solicitation_Revised_A00001.pdf PDF
191BWC22R0005 A00001.pdf PDF
191BWC22R0005_IOI_Rehab_PH4-5_Specs_20220517.pdf PDF
IOI PH4-5_Pre-Proposal Sign-In.pdf PDF
Responses to Questions Received Against 191BWC22R0005.pdf PDF
Attachment 11. Nogales International Outfall Pipe Survey_20150423.pdf PDF
Attachment 09. NIWTP Flow Reports_Jan-Dec2020.pdf PDF
Attachment 13. Nogales Intl Sanitation Project Construction Report_1969-1972.pdf PDF
Attachment 19. 'IBWC Form 110.pdf PDF
Attachment 04. RFP Client Authorization Letter.docx DOCX document
Attachment 08. NIWTP & IOI EA and FONSI_1999.pdf PDF
Attachment 12. B&C Evaluation of IOI Report_200503.pdf PDF
Attachment 20. IBWC Form 116.pdf PDF
Attachment 02. 191BWC22R0005 Phase V Drawings_20220309.pdf PDF
Attachment 21. IBWC Form 117.pdf PDF
Attachment 06. IOI Rehab Design Report woE_20180411.pdf PDF
Attachment 07. IOI Rehab Geotechnical Report_20150121.pdf PDF
Attachment 18. UPRR Requirements & Guidelines.pdf PDF
Attachment 05. RFP Past Performance Questionnaire.pdf PDF
Attachment 16. NADB IOI Direct Laterals Design.pdf PDF
Attachment 03. 191BWC22R0005 IOI Rehab PH 4&5 20220419.pdf PDF
Attachment 14. Nogales International Sanitation Project As-Builts_19710501.pdf PDF
Attachment 10. NIWTP Flow Reports_Jan-Dec2021.pdf PDF
191BWC22R0005 Nogales IOI Phases 4 and 5.pdf PDF
Attachment 01. 191BWC22R0005 Phase IV Drawings_20220309.pdf PDF
Attachment 17. UPRR IOI MCL Folder03060-53.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

191BWC22R0005 Page 1 of 6

IOI REHABILITATION PHASES 4&5

191BWC22R0005

IOI REHABILITATION PHASES 4 & 5

Pre-Proposal Conference

Meeting Date: May 04, 2022 at 9:30 am Location: USIBWC Nogales Field Office

Please understand that the Pre-Proposal Conference is intended to aid Contractors and ensure that misunderstandings are minimized to provide a better project for all involved. However, the Government is not bound by verbal responses. Contractors shall submit written questions to the Contracting Officer (CO) for official clarification and responses. All written questions and answers received prior to the cutoff date shall be added to this Solicitation as an amendment;

only these written responses bind the Government during performance of this Contract.

Items of Note for Contractors

1. There are multiple ways to access the project via public roadways. Some areas can only be accessed through private property or a right-of-way (ROW).

a. The access points and work are located within multiple properties and ROWs, including City of Nogales, ADOT, Santa Cruz County, and UPRR.

b. Reference the GC Series Sheets in the drawings for maps of the parcel data along the

IOI pipeline.

c. The City of Nogales has a pipeline easement from various property owners for the

IOI that is 50 feet wide as shown in the drawings.

d. Contractor shall decide which routes to utilize for access to the work sites and coordinate with each respective property owner for permission and agreement or construction easement to use their property.

e. Access to some manholes located near or along the slopes of the Potrero Creek may be constrained or limited due to the grades, surrounding vegetation, or riprap.

f. Approved traffic control plans through the City of Nogales, Santa Cruz County, or ADOT, as applicable, is required for work within or adjacent to public street/road rights-of-way and any access points. Section 01.55.26 1.8.

g. Roads and parking areas within or near the pipeline easement shall not be blocked off.

h. The Contractor's activities shall not hinder the normal operations of any adjacent or nearby owners, tenants, occupants, businesses, customers, etc. and shall maintain access at all times to the existing facilities.

2. UPRR ROW

a. Significant part of construction for the IOI is within the UPRR ROW.

b. Work is not permitted until the Contractor has obtained all their necessary rights of entry from UPRR under the Maintenance Agreement that USIBWC is in process of obtaining. This Maintenance Agreement for the project may take up to 180 days past the Contract award.

c. UPRR Contractor Right of Entry (CROE) Agreement is required for submission including their applicable fees, insurance policies, and any proposed work plans.

191BWC22R0005 Page 2 of 6

(1) A separate CROE Agreement is required for the prime contractor and each subcontractor to work within the UPRR ROW. Once USIBWC obtains the maintenance agreement, contractors may proceed with submitting their applications.

d. A separate, individual utility installation application and fee is required for the bypass system for any portion to be installed within UPRR ROW and crossing the tracks.

e. See Section 00.31.43 for additional information regarding work within UPRR ROW.

f. No construction or equipment is permitted within 15 feet of the nearest track centerline.

g. A flagman is required any time equipment comes within 25 feet of the centerline of the tracks. Contractor shall request the services of a flagman directly from UPRR or RailPros, as directed by UPRR. Only flagman from UPRR or a company approved by UPRR shall be used for the construction observation and flagging near the tracks.

h. Contractor is responsible for any shoring system required for the protection of the UP railways and tracks during excavation for pipe or manholes within their ROW Zone A. This includes all reviews and approvals by UPRR prior to installation.

Contractor shall comply with the current Railroad standards and requirements for design and construction of all shoring. See Section 31.40.00 for more details.

i. Track and ground monitoring are required continuously 24/7 per UPRR guidelines when construction is within Zone A.

3. Must maintain continuous access through site to USIBWC employees, UPRR crews and railroad employees, U.S. Customs and Border Patrol, and city/county/state officials. The Contractor must schedule operations and coordinate all work with these entities.

4. Diversion of Water (Section 02.02.00)

a. Diversion of water with Phases 4 & 5 for the IOI rehabilitation is anticipated to be minimal. All other diversion of water will depend on the Contractor's proposed bypass alignment.

b. Contractor shall divert any water to access their work areas within the waterways, if needed.

c. A few IOI manholes are located along drainage structures or waterways, such as the Potrero Creek, as well as their tributaries. The Potrero Creek is continuously flowing and is subject to unexpected flooding or overflows of stormwater and wastewater.

d. Flows within the Potrero Creek can increase suddenly due to standard practice upstream in Mexico of diverting their sanitary sewer overflows to the stormwater in the Wash.

e. These overflows of wastewater mixing with stormwater in the Nogales Wash have resulted in ADEQ classifying both the Nogales Wash and Potrero Creek as Impaired Waters. Contractor shall use caution when handling flows in these streams.

f. Historical data for flows in the Nogales Wash may be found in Section 00.31.19.

5. Bypass Piping

a. Contractor shall determine their own alignment and obtain any landowner agreements or easements for use of the various properties to laydown piping.

Contract drawings only show a potential bypass alignment.

b. Permitting from UPRR:

191BWC22R0005 Page 3 of 6

(1) For bypass system alignment, permit application will likely require UPRR's "Exhibit A: Overhead Pipeline Crossing" for any temporary crossings below the tracks. Note that although this exhibit shows an overhead pipeline structure, bypass pipe(s) crossing under the tracks through an existing UPRR bridge or culvert does not require this type of structure but UPRR still refers to this type of crossing as "overhead".

(2) For bypass system alignment, permit application will likely require UPRR's "Exhibit A: Non-Flammable Liquid Pipeline" for a temporary encroachment at the closest point from the bypass pipeline to the centerline of track.

(3) Bypass piping installed near or through UPRR structures shall not reduce the existing structure’s hydraulic opening greater than 5%.

(4) Maximum allowable duration for installation of temporary bypass piping is 6 months.

(5) See Section 00.31.43 1.10 E. for additional requirements regarding temporary bypass piping alignment installed within UPRR ROW.

c. Bypassing performed during monsoon season will have IOI flows significantly higher than usual because of combined storm flows coming from Mexico.

d. Flows within the IOI can increase suddenly due to standard practice upstream in Mexico of diverting stormwater overflows into the sewer line. O&M at times also diverts stormwater flows from the Nogales Wash into the IOI because of high sewage content found in the stormwater.

6. No work within the waterways, if needed, shall be performed during the monsoon season, which typically occurs between mid-June through September.

7. Although work is not directly adjacent to the international border with Mexico, illegal drug trafficking activities from Mexico could impact the IOI.

a. Contractor shall fully cooperate with the directions of the U.S. Customs and Border

Patrol in the event of a security alert and may be required to stop work for security reasons in the area.

8. Many properties adjacent to work.

a. Contractor is required to notify adjacent entities/landowners/renters/occupants of construction work. See Section 02.01.00 1.13 B.1.

b. Contractor is required to notify adjacent entities/landowners/renters/occupants of seeding. USIBWC has had significant issues with people spraying herbicides to stop the growth of weeds on the areas that are revegetated. See Section 02.01.00 1.13 B.2.

9. Davis Bacon project

a. Applies to all subcontractors.

b. Certified payrolls required for all workers, including truck drivers (unless owner-operator).

c. Owner-operators have special reporting requirements.

d. Federal minimum wage for Contractors of $15/hour applies regardless of wage determination.

10. SF-1413 forms are required for all subcontractors. This includes service providers but not suppliers.

191BWC22R0005 Page 4 of 6

11. Review requirements for Safety and Health Officer. Section 01.35.23 1.12.

12. CPR and first aid required for all employees onsite, including subcontractors. Section

01.35.23 1.19.

13. Prime contract and all subcontractors working onsite during any month shall complete

Form 153 (Monthly Exposure and First Aid Report). Sections 01.35.23.

14. Construction Quality Control Systems Manager must be an engineer and shall have no other duties on the project. Section 01.45.00 1.11.

15. Testing laboratories shall be unaffiliated with the Construction Contractor and with any part of the design of this project (URS/AECOM and Terracon). Section 01.43.26 1.14.

16. All engineering test results shall be signed and sealed by an Arizona professional engineer.

Section 01.43.26 1.9 C.

17. Review premobilization submittals: Section 01.11.00 3.1.

(1) Code of Business Ethics (Section 01.31.75)

(2) Baseline Schedule (Section 01.32.16)

(3) Scheduler Qualifications (Section 01.32.16)

(4) Video and Photographs of Existing Conditions (Section 01.32.33)

(5) Submittal Register (Section 01.33.00)

(6) Accident Prevention Plan (Section 01.35.23)

(7) Applicable AHAs to start mobilization and construction (Section 01.35.23)

(8) Site Safety and Health Officer Qualifications (Section 01.35.23)

(9) Employee First-Aid and CPR Training Records (Section 01.35.23)

(10) Contingency Evacuation Plan (Section 01.35.23)

(11) Quality Control Plan (Section 01.45.00)

(12) Contractor Quality Control System Manager Qualifications (Section 01.45.00)

(13) Staging Area/Haul Routes/Trailer Location/Storage (Section 01.52.13 and

01.57.00)

(14) SWPP Plan (Section 01.57.19)

(15) SWPP NOI (Section 01.57.19)

(16) Resource Conservation Construction Plan (Section 01.74.19)

(17) Diversion and Care of Water Plan (Section 02.02.00)

(18) Preconstruction Survey (Section 02.21.00)

18. Mobilization and construction are not permitted to begin until all premobilization submittals have been compliance confirmed and the Contractor has obtained all the necessary permits and rights of entry from each respective owner for the applicable phase of work.

19. All surveys shall be performed by or under the direction of an Arizona professional surveyor. (Multiple specification references)

20. Surveys are required: prior to site disturbance, after excavation, after backfill of each type of material, to measure/verify work, for pipe repairs and new manholes, and upon completion of the project areas. See Section 02.21.00 3.2 and 3.3 for more specifics.

21. Staging areas to be proposed by Contractor; all areas require landowner agreements.

191BWC22R0005 Page 5 of 6

22. All areas disturbed by construction shall be revegetated.

a. All areas with topsoil shall be seeded.

b. All additional areas disturbed during construction shall be seeded.

23. Contract duration is 840 calendar days after the Notice to Proceed.

a. 660 calendar days for construction

b. 180 calendar days after substantial completion of construction for closeout paperwork

c. Time for completion includes final cleanup of the premises

24. Standard USIBWC forms and items are available at USIBWC's website at www.ibwc.gov/Organization/Engineering/construction.html

25. Any questions about Solicitation or proposal submission requirements?

26. Any questions about Solicitation attachments?

27. Any questions about Bid Schedule?

CLIN DESCRIPTION QTY UNIT

1 Mobilization/Demobilization 1 LS 2 Contract Closeout 1 LS 3 Diversion and Care of Water 1 LS 4 IOI Sewage Flow Management 1 LS 5 Lateral Sewage Flow Management 23 EA

6 30” CIPP 18,009 LF

7 MH Protective Lining System 6,405 SF 8 Carbon Fiber Structural MH Rehab 465 SF 9 Raise MH to Grade 4 EA

10 New SS Manhole 2 EA 11 Demolish Manhole 1 LS 12 Pipe Repair 200 LF 13 Excavation* 1,000 CY** 14 Backfill and Compaction* 1,000 CY** 15 Revegetation* 200 SY 16 Aggregate Base Course* 200 CY** 17 Pavement Remove/Replace* 200 SY

*Measurement and payment under these bid items apply only for pipe repairs and new manhole installations. All other costs of work for excavation, backfill and compaction, aggregate base course, pavement, and revegetation shall be included in the applicable prices offered for the various Bid Items under this Contract.

**Note that Solicitation Bid Schedule shows a Unit of "CD" for these CLINs which represents cubic yard. CD is the acronym used in USIBWC's financial system for CY.

28. We are going to start the site visit between Manhole 51 and Manhole 52 which is the start of Phase 4 to show the non-standard Manhole to be removed. I plan on stopping there, at Manhole 59 to MH 60 where we bypass piping may potentially cross the Railroad, Manhole 69 near UPRR ROW, at Manhole 85 where CIPP ends, and end the site visit at Manhole 86 near Potrero Creek where bypassing ends. Are there other areas where people wish to stop?

a. Most IOI manholes are available to pedestrian access all the time. You are welcome to go back and revisit any of the things that you see today on your own time. Be http://www.ibwc.gov/Organization/Engineering/construction.html

191BWC22R0005 Page 6 of 6 cautious about opening up manholes since the IOI is active at all times. If manhole is sealed, do not break seal. Properly replace all opened covers.

Final written questions are due to the CO by May 13, 2022 at 10:00AM MDT (El Paso time). Submit questions in Microsoft Word file.

RFP Deadline is June 21, 2022 at 2:00 pm MDT.

CO is Carmella Speer carmella.speer@ibwc.gov mailto:carmella.speer@ibwc.gov

1. There are multiple ways to access the project via public roadways. Some areas can only be accessed through private property or a right-of-way (ROW).
a. The access points and work are located within multiple properties and ROWs, including City of Nogales, ADOT, Santa Cruz County, and UPRR.
b. Reference the GC Series Sheets in the drawings for maps of the parcel data along the IOI pipeline.
c. The City of Nogales has a pipeline easement from various property owners for the IOI that is 50 feet wide as shown in the drawings.
d. Contractor shall decide which routes to utilize for access to the work sites and coordinate with each respective property owner for permission and agreement or construction easement to use their property.
e. Access to some manholes located near or along the slopes of the Potrero Creek may be constrained or limited due to the grades, surrounding vegetation, or riprap.
f. Approved traffic control plans through the City of Nogales, Santa Cruz County, or ADOT, as applicable, is required for work within or adjacent to public street/road rights-of-way and any access points. Section 01.55.26 1.8.
g. Roads and parking areas within or near the pipeline easement shall not be blocked off.
h. The Contractor's activities shall not hinder the normal operations of any adjacent or nearby owners, tenants, occupants, businesses, customers, etc. and shall maintain access at all times to the existing facilities.
2. UPRR ROW
a. Significant part of construction for the IOI is within the UPRR ROW.
b. Work is not permitted until the Contractor has obtained all their necessary rights of entry from UPRR under the Maintenance Agreement that USIBWC is in process of obtaining. This Maintenance Agreement for the project may take up to 180 days past th...
c. UPRR Contractor Right of Entry (CROE) Agreement is required for submission including their applicable fees, insurance policies, and any proposed work plans.
(1) A separate CROE Agreement is required for the prime contractor and each subcontractor to work within the UPRR ROW. Once USIBWC obtains the maintenance agreement, contractors may proceed with submitting their applications.
d. A separate, individual utility installation application and fee is required for the bypass system for any portion to be installed within UPRR ROW and crossing the tracks.
e. See Section 00.31.43 for additional information regarding work within UPRR ROW.
f. No construction or equipment is permitted within 15 feet of the nearest track centerline.
g. A flagman is required any time equipment comes within 25 feet of the centerline of the tracks. Contractor shall request the services of a flagman directly from UPRR or RailPros, as directed by UPRR. Only flagman from UPRR or a company approved by U...
h. Contractor is responsible for any shoring system required for the protection of the UP railways and tracks during excavation for pipe or manholes within their ROW Zone A. This includes all reviews and approvals by UPRR prior to installation. Contra...
i. Track and ground monitoring are required continuously 24/7 per UPRR guidelines when construction is within Zone A.
3. Must maintain continuous access through site to USIBWC employees, UPRR crews and railroad employees, U.S. Customs and Border Patrol, and city/county/state officials. The Contractor must schedule operations and coordinate all work with these entities.
4. Diversion of Water (Section 02.02.00)
a. Diversion of water with Phases 4 & 5 for the IOI rehabilitation is anticipated to be minimal. All other diversion of water will depend on the Contractor's proposed bypass alignment.
b. Contractor shall divert any water to access their work areas within the waterways, if needed.
c. A few IOI manholes are located along drainage structures or waterways, such as the Potrero Creek, as well as their tributaries. The Potrero Creek is continuously flowing and is subject to unexpected flooding or overflows of stormwater and wastewater.
d. Flows within the Potrero Creek can increase suddenly due to standard practice upstream in Mexico of diverting their sanitary sewer overflows to the stormwater in the Wash.
e. These overflows of wastewater mixing with stormwater in the Nogales Wash have resulted in ADEQ classifying both the Nogales Wash and Potrero Creek as Impaired Waters. Contractor shall use caution when handling flows in these streams.
f. Historical data for flows in the Nogales Wash may be found in Section 00.31.19.
5. Bypass Piping
a. Contractor shall determine their own alignment and obtain any landowner agreements or easements for use of the various properties to laydown piping. Contract drawings only show a potential bypass alignment.
b. Permitting from UPRR:
(1) For bypass system alignment, permit application will likely require UPRR's "Exhibit A: Overhead Pipeline Crossing" for any temporary crossings below the tracks. Note that although this exhibit shows an overhead pipeline structure, bypass pipe(s) c...
(2) For bypass system alignment, permit application will likely require UPRR's "Exhibit A: Non-Flammable Liquid Pipeline" for a temporary encroachment at the closest point from the bypass pipeline to the centerline of track.
(3) Bypass piping installed near or through UPRR structures shall not reduce the existing structure’s hydraulic opening greater than 5%.
(4) Maximum allowable duration for installation of temporary bypass piping is 6 months.
c. Bypassing performed during monsoon season will have IOI flows significantly higher than usual because of combined storm flows coming from Mexico.
d. Flows within the IOI can increase suddenly due to standard practice upstream in Mexico of diverting stormwater overflows into the sewer line. O&M at times also diverts stormwater flows from the Nogales Wash into the IOI because of high sewage conte...
6. No work within the waterways, if needed, shall be performed during the monsoon season, which typically occurs between mid-June through September.
7. Although work is not directly adjacent to the international border with Mexico, illegal drug trafficking activities from Mexico could impact the IOI.
a. Contractor shall fully cooperate with the directions of the U.S. Customs and Border Patrol in the event of a security alert and may be required to stop work for security reasons in the area.
8. Many properties adjacent to work.
a. Contractor is required to notify adjacent entities/landowners/renters/occupants of construction work. See Section 02.01.00 1.13 B.1.
b. Contractor is required to notify adjacent entities/landowners/renters/occupants of seeding. USIBWC has had significant issues with people spraying herbicides to stop the growth of weeds on the areas that are revegetated. See Section 02.01.00 1.13...
9. Davis Bacon project
a. Applies to all subcontractors.
b. Certified payrolls required for all workers, including truck drivers (unless owner-operator).
c. Owner-operators have special reporting requirements.
d. Federal minimum wage for Contractors of $15/hour applies regardless of wage determination.
10. SF-1413 forms are required for all subcontractors. This includes service providers but not suppliers.
11. Review requirements for Safety and Health Officer. Section 01.35.23 1.12.
12. CPR and first aid required for all employees onsite, including subcontractors. Section 01.35.23 1.19.
13. Prime contract and all subcontractors working onsite during any month shall complete Form 153 (Monthly Exposure and First Aid Report). Sections 01.35.23.
14. Construction Quality Control Systems Manager must be an engineer and shall have no other duties on the project. Section 01.45.00 1.11.
15. Testing laboratories shall be unaffiliated with the Construction Contractor and with any part of the design of this project (URS/AECOM and Terracon). Section 01.43.26 1.14.
16. All engineering test results shall be signed and sealed by an Arizona professional engineer. Section 01.43.26 1.9 C.
17. Review premobilization submittals: Section 01.11.00 3.1.
(1) Code of Business Ethics (Section 01.31.75)
(2) Baseline Schedule (Section 01.32.16)
(3) Scheduler Qualifications (Section 01.32.16)
(4) Video and Photographs of Existing Conditions (Section 01.32.33)
(5) Submittal Register (Section 01.33.00)
(6) Accident Prevention Plan (Section 01.35.23)
(7) Applicable AHAs to start mobilization and construction (Section 01.35.23)
(8) Site Safety and Health Officer Qualifications (Section 01.35.23)
(9) Employee First-Aid and CPR Training Records (Section 01.35.23)
(10) Contingency Evacuation Plan (Section 01.35.23)
(11) Quality Control Plan (Section 01.45.00)
(12) Contractor Quality Control System Manager Qualifications (Section 01.45.00)
(13) Staging Area/Haul Routes/Trailer Location/Storage (Section 01.52.13 and 01.57.00)
(14) SWPP Plan (Section 01.57.19)
(15) SWPP NOI (Section 01.57.19)
(16) Resource Conservation Construction Plan (Section 01.74.19)
(17) Diversion and Care of Water Plan (Section 02.02.00)
(18) Preconstruction Survey (Section 02.21.00)
18. Mobilization and construction are not permitted to begin until all premobilization submittals have been compliance confirmed and the Contractor has obtained all the necessary permits and rights of entry from each respective owner for the applicabl...
19. All surveys shall be performed by or under the direction of an Arizona professional surveyor. (Multiple specification references)
20. Surveys are required: prior to site disturbance, after excavation, after backfill of each type of material, to measure/verify work, for pipe repairs and new manholes, and upon completion of the project areas. See Section 02.21.00 3.2 and 3.3 for...
21. Staging areas to be proposed by Contractor; all areas require landowner agreements.
22. All areas disturbed by construction shall be revegetated.
a. All areas with topsoil shall be seeded.
b. All additional areas disturbed during construction shall be seeded.
23. Contract duration is 840 calendar days after the Notice to Proceed.
a. 660 calendar days for construction
b. 180 calendar days after substantial completion of construction for closeout paperwork
c. Time for completion includes final cleanup of the premises
24. Standard USIBWC forms and items are available at USIBWC's website at www.ibwc.gov/Organization/Engineering/construction.html
25. Any questions about Solicitation or proposal submission requirements?
26. Any questions about Solicitation attachments?
27. Any questions about Bid Schedule?
28. We are going to start the site visit between Manhole 51 and Manhole 52 which is the start of Phase 4 to show the non-standard Manhole to be removed. I plan on stopping there, at Manhole 59 to MH 60 where we bypass piping may potentially cross the...
a. Most IOI manholes are available to pedestrian access all the time. You are welcome to go back and revisit any of the things that you see today on your own time. Be cautious about opening up manholes since the IOI is active at all times. If manho...