CityofNogales_20200924_Pena Blanca Outfall Sewer As-Built.pdf

PDF 9 MB Posted

Attached to
Nogales IOI Rehabilitation Phase 4 & 5
Solicitation number
191BWC22R0005
Issued by

View the file

Other files

File Type Posted
191BWC22R0005 Amendment A00004.pdf PDF
191BWC22R0005_Solicitation_Revised_A00002_draft.pdf PDF
191BWC22R0005 Amendment A00003.pdf PDF
CON_PenaBlancaHighlandsSouthOffsite_as builts.pdf PDF
191BWC22R0005_IOI_Rehab_PH45_Specs_20220602.pdf PDF
191BWC22R0005_Solicitation_Revised_A00002.pdf PDF
Responses_to_Additional_Questions_Received_Against_191BWC22R0005.pdf PDF
NIOI Hydrographs_20220524.pdf PDF
City of Nogales Flow Information Lift Station.pdf PDF
191BWC22R0005 Amendment A00002.pdf PDF
191BWC22R0005_Solicitation_Revised_A00001.pdf PDF
IOI PH4-5 _Pre-Proposal Agenda_Final.pdf PDF
191BWC22R0005 A00001.pdf PDF
191BWC22R0005_IOI_Rehab_PH4-5_Specs_20220517.pdf PDF
IOI PH4-5_Pre-Proposal Sign-In.pdf PDF
Responses to Questions Received Against 191BWC22R0005.pdf PDF
Attachment 11. Nogales International Outfall Pipe Survey_20150423.pdf PDF
Attachment 09. NIWTP Flow Reports_Jan-Dec2020.pdf PDF
Attachment 13. Nogales Intl Sanitation Project Construction Report_1969-1972.pdf PDF
Attachment 19. 'IBWC Form 110.pdf PDF
Attachment 04. RFP Client Authorization Letter.docx DOCX document
Attachment 08. NIWTP & IOI EA and FONSI_1999.pdf PDF
Attachment 12. B&C Evaluation of IOI Report_200503.pdf PDF
Attachment 20. IBWC Form 116.pdf PDF
Attachment 02. 191BWC22R0005 Phase V Drawings_20220309.pdf PDF
Attachment 21. IBWC Form 117.pdf PDF
Attachment 06. IOI Rehab Design Report woE_20180411.pdf PDF
Attachment 07. IOI Rehab Geotechnical Report_20150121.pdf PDF
Attachment 18. UPRR Requirements & Guidelines.pdf PDF
Attachment 05. RFP Past Performance Questionnaire.pdf PDF
Attachment 16. NADB IOI Direct Laterals Design.pdf PDF
Attachment 03. 191BWC22R0005 IOI Rehab PH 4&5 20220419.pdf PDF
Attachment 14. Nogales International Sanitation Project As-Builts_19710501.pdf PDF
Attachment 10. NIWTP Flow Reports_Jan-Dec2021.pdf PDF
191BWC22R0005 Nogales IOI Phases 4 and 5.pdf PDF
Attachment 01. 191BWC22R0005 Phase IV Drawings_20220309.pdf PDF
Attachment 17. UPRR IOI MCL Folder03060-53.pdf PDF
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Stantec Consulting Services Inc.

CITY OF NOGALES

PENA BLANCA OUTFALL SEWER

FORCE MAIN REPAIR PROJECT

CIP NO. TBD

BEING WITHIN A PORTION OF SEC. 19, T23S, R14E, G&SRM

BID # TBD

LOCATION MAP

OWNER ENGINEER

SHEET INDEX

BASIS OF BEARING

PROJECT BENCHMARKS UTILITY NOTE

LEGEND

CITY OF NOGALES ACCEPTANCE:

Arizona Blue Stake, Inc.

25 30

THIS

PROJECT

ABBREVIATIONS

B NADB/CITY REVIEW 12/13/2019 WDO

12/13/2019

AS-BUILT

9/2 2/2

C NEXTGEN AS-BUILTS 9/22/20 WDO

Ñ

Ñ

Sara Line

Sara Line

RE-AUTHORIZATION OF THE REPORT WAS MADE ONNOVEMBER 12, 2019.

B NADB/CITY REVIEW 12/13/2019 WDO

/1

3/

AS-BUILT

9/2 2/2

C NEXTGEN AS-BUILTS 9/22/20 WDO Ñ

REPLACE, POST CONSTRUCTION,

REPLACEMENT

BEST MANAGEMENT PRACTICE

B NADB/CITY REVIEW 12/13/2019 WDO

, OR POTRERO CREEK.

12/13/2019

AS-BUILT

9/2 2/2

C NEXTGEN AS-BUILTS 9/22/20 WDO Ñ

Sara Line

Sara Line

Sara Line

Sara Line

Sara Line

Sara Line

Sara Line

S

10'' S S

10'' S S

10'' S S

10'' S S

10'' S S

10'' S S

10'' S S

10'' S S

S

S

S

S

10'' SS

S S

S S

S S

10'' S S

S

S

9+00 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00

Stantec Consulting Services Inc.

Arizona Blue Stake, Inc.

N

13 NPI

HARD DRILLING EQUIPMENT MAY

BE REQUIRED FOR HORIZONTAL

DIRECTIONAL DRILLING BELOW

POTRERO CREEK.

ABANDON EXISTING SEWER LINE

IN PLACE AND FILL WITH GROUT.

INSTALL MONUMENT PER

PCRWRD-503 (SEE SHEET 5).

NPI

B NADB/CITY REVIEW 12/13/2019 WDO

12/13/2019

A S-

BU

IL

T

9/2 2/2

C NEXTGEN AS-BUILTS 9/22/20 WDO Ñ

Sara Polygon

Sara Line

Sara Polygon

Sara Line

Sara Line

Sara Polygon

Sara Line

Sara Polygon

Sara Line

Owner Rectangle

Owner Line

Owner Text Box Final Drilling Pit

Sara Typewritten Text

Sara Typewritten Text

Sara Typewritten Text

Sara Typewritten Text

Sara Line

Sara Typewritten Text

DR11

Sara Line

Sara Line

Sara Polygon

Sara Typewritten Text

Sara Line

Sara Line

Owner Text Box Lat: 31° 24' 37" N Long: 110° 57' 33 W

Sara Polygon

Sara Line

Owner Text Box Lat: 31° 24' 41.0" N Long: 110° 57' 25 W

Owner Text Box Final Drilling Pit

Sara Line

Sara Polygon

Sara Typewritten Text

Sara Polygon

Sara Polygon

Sara Line

Sara Text Box

Sara Polygon

Sara Line

Sara Line

Sara Text Box Connect to Existing Force Main Station = 11+50 Elev = 3556.12

Sara Line

Sara Text Box Connect to Exist. Force Main Station = 19+70 Elev = 3566

Sara Polygon

Sara Line

Sara Line

Sara Line

Sara Line

Sara Line

Sara Polygonal Line

Sara Polygonal Line

Sara Line

Sara Line

Sara Line

Sara Callout Final pit location Station: 19+90 (East side) Elevation = 3572.31 (Top of Pit)

Sara Polygonal Line

Sara Polygonal Line

Sara Line

Sara Line

Sara Polygon

Sara Line

Sara Line

Sara Line

Sara Line

Sara Line

Sara Callout Final Pit Location Station =11 + 40 (East Side) Elevation = 3564.98 (Top of Pit)

Polygon

S

S

Stantec Consulting Services Inc.

N

5 CONTRACTOR TO ABANDON EXISTING PIPE IN

PLACE PER PCRWRD STANDARD

SPECIFICATIONS AND DETAILS, SUBSECTION

3.2.3(H). GROUT FILL AND MARK WITH

ABANDONMENT MONUMENT PER

PCRWRD-503.

PCRWRD-503 DETAIL

B NADB/CITY REVIEW 12/13/2019 WDO

3. MONUMENT DATA SHALL BE AS SHOWN, WITH THE EXCEPTION OF THE NOTATION

IN PARENTHESIS TO BE MODIFIED AS NOTED.

4. REINFORCING BARS MAY BE DELETED WITH THE INSTALLATION OF AN APPROVED

ELECTRONIC MARKER SYSTEM PLACED AT THE BASE OF THE MONUMENT AS

SHOWN.

5. ABANDONMENT MONUMENTS SHALL BE PLACED AT THE TERMINAL ENDS OF

ABANDONED SEWER LINES/FORCE MAINS WITH A MAXIMUM SPACING OF 250' AND

CENTERED ABOVE ABANDONED MANHOLES.

12/13/2019

AS-BUILT

9/2 2/2

C NEXTGEN AS-BUILTS 9/22/20 WDO Ñ

Sara Oval

Sara Oval

Sara Line

Sara Line

Sara Rectangle

Sara Polygon

Sara Typewritten Text

NOT INSTALLED

Sara Line

Sara Line

Sara Line

Sara Line

Sara Line

Sara Typewritten Text at new connection