Attached is J.14 an updated bid sheet requesting separate pricing for option 13.13. Rather than renumbering all the options, we are requesting option 13.13 to be priced separately. All other options including the remainder of option 13 should be priced as a firm fixed price for the entire option. See highlighted section on bid sheet for changes.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPTIONAL PRICE ITEMS
WEST END FABRICATION CONTRACT
National Air and Space Museum, National Mall Building
PRICE SCHEDULE (updated 7-16-18)
Line Items: The following line items include providing all labor, materials, equipment, and services necessary to complete the fabrication and installation of the work identified in the attached Scope of Work. It also includes preparation of all documents, shop drawings, submittals, schedule, inspections, commissioning and technical requirements and compliance with all technical, quality control, administrative, and safety requirements as required in the SOW criteria Scope of Work (SOW) and Base Contract.
Period of Performance: All associated work with sequence one of this contract shall be completed by 15 OCT 2021 and sequence two of this contract completed by 15 MAR 2022. Performance period starts from issuance of Notice to Proceed (NTP).
Price Schedule
BASE PRICE
| Item No. | Description | Lump Sum Totals | |
| (Dollars) |
Sequence I: Galleries in Zone #1 & #2
Contract Line Item Number (CLIN #1) All work per drawings, specifications and attachments for Galleries # 103, 105, 203, 205, 102, 106 & 206
| Gallery 103 – Early Flight | Firm Fixed Price: $_________ | |
| Gallery 105 – Reinventing Flight | Firm Fixed Price: $_________ | |
| Gallery 203 – Speed | Firm Fixed Price: $_________ | |
| Gallery 205 – Exploring the Planets | Firm Fixed Price: $_________ | |
| Gallery 102 – America by Air | Firm Fixed Price: $_________ | |
| Gallery 106 – We all Fly | Firm Fixed Price: $_________ | |
| Gallery 206 – Destination Moon | Firm Fixed Price: $_________ |
BASE BID - Contract Line Item Number (CLIN #1) - Sequence I Sum of Cost of Galleries # 103, 105, 203, 205, 102, 106 & 206 Firm Fixed Price: $________
Sequence II: Galleries in Zone #3
Contract Line Item Number (CLIN #2) All work per drawings, specifications and attachments for Galleries # Galleries # 107 & 207
| Gallery 107 – Wright Brothers | Firm Fixed Price: $_________ | |
| Gallery 207 – One World Connected | Firm Fixed Price: $_________ |
OPTION #1 Contract Line Item Number (CLIN #2) - Sequence II Sum of Cost of Galleries # 107 & 207 Firm Fixed Price: $________
OPTION #2 Contract Line Item Number (CLIN #3)
Omit non-reflective glass with the exception provided list
Contract Line Item Number (CLIN #3) Firm Fixed Price: $_________
OPTION #3 Contract Line Item Number (CLIN #4)
Replace Marmoleum with carpet
Contract Line Item Number (CLIN #4) Firm Fixed Price: $_________
OPTION #4 Contract Line Item Number (CLIN #5)
G-206 - Omit AV 206-06 Humans Reach the Moon Video Wall
Contract Line Item Number (CLIN #5) Firm Fixed Price: $_________
OPTION #5 Contract Line Item Number (CLIN #6)
G-206 - Omit DC 206-31 Apollo Command Module Case
Contract Line Item Number (CLIN #6) Firm Fixed Price: $_________
OPTION #6 Contract Line Item Number (CLIN #7)
G-206 - Omit DC 206-38 Lunar Roving vehicle case
Contract Line Item Number (CLIN #7) Firm Fixed Price: $_________ OPTION #7 Contract Line Item Number (CLIN #8)
G-206 - Omit DC 206-16 Bezos Case
Contract Line Item Number (CLIN #8) Firm Fixed Price: $_________
OPTION #8 Contract Line Item Number (CLIN #9)
Other Materials VE
Contract Line Item Number (CLIN #9) Firm Fixed Price: $_________
OPTION #9 Contract Line Item Number (CLIN #10)
Level #1 AV/CI Reductions
Contract Line Item Number (CLIN #10) Firm Fixed Price: $_________
OPTION #10 Contract Line Item Number (CLIN #11)
Level 1 (Content Reductions (Cases, Media, etc))
Contract Line Item Number (CLIN #11) Firm Fixed Price: $_________
OPTION #11 Contract Line Item Number (CLIN #12)
Level #2 AV/CI Reductions
Contract Line Item Number (CLIN #12) Firm Fixed Price: $_________
OPTION #12 Contract Line Item Number (CLIN #13)
Level 2 (Content Reductions (Cases, Media, etc))
Contract Line Item Number (CLIN #13) Firm Fixed Price: $_________
OPTION #13 Contract Line Item Number (CLIN #14)
Miscellaneous Reductions with exception of 13.13 Omit Gallery 105 Reinventing Flight, Priced Separately
Contract Line Item Number (CLIN #14) Firm Fixed Price: $_________
Deletion of 13.13 Reinventing Flight Gallery Firm Fixed Price: $_________
TO BE PRICED SEPARATELY IN OPTION 13
Cost of Bond Total Contract (CLINs 1-13 and bond) Not-to-Exceed Amount: $___________________
*Please Note: All actual conservation, preparation, articulation, bracketing, and mounting of artifacts will be performed by others (Smithsonian staff and conservation contractor(s)). It is the Contractor’s responsibility to provide all the requirements for the fabrication of the associate scope according to all drawings, specifications and attachments, and any associated materials necessary to successfully integrate all artifacts into the Exhibition fabrication and installation and must work seamlessly with the Collections staff throughout the project.
Contractor’s Stamp, Signature, Date:
| ______________________________________ | ____________________ | |
| Date |
END OF PRICE SCHEDULE