Attachment J.14 Itemized Bid Sheet for RFP 18QT0010036 (Revised 8.6.2018) For Fabrication of West End Exhibits at NASM This Bid Sheet supersedes the language in the RFP sections B.3 and L.5.2
Name of Bidder_________________________________________________________
All Firm Fixed Prices shall include all direct labor, indirect costs (overhead and general and administrative expenses), other direct costs (i.e. materials, communication, reproduction, etc. and any travel, per diem and lodging), subcontractors, commission, and profit for which Contractor expects payment per the exhibition fabrication scope as detailed in RFP18QT0010036 and the drawings dated May 14, 2018 and the specifications and amendments to the RFP.
I. PRICING BROKEN BY GALLERIES:
BASE BID Sequence I: Galleries in Zone #1 & #2 All work per drawings, specifications and attachments for Galleries # 103, 203, 205, 102, 106 & 206
| Gallery 103 – Early Flight | Firm Fixed Price: $_________ | ||
| Gallery 203 – Speed | Firm Fixed Price: $_________ | ||
| Gallery 205 – Exploring the Planets | Firm Fixed Price: $_________ | ||
| Gallery 102 – America by Air | Firm Fixed Price: $_________ | ||
| Gallery 106 – We all Fly | Firm Fixed Price: $_________ | ||
| Gallery 206 – Destination Moon | Firm Fixed Price: $_________ | ||
| BOND for base bid | Bond $ __________________ |
*Important change.Gallery105 Reinventing Flight has been deleted from the RFP. Disregard technical drawing package X0383-105-Reinventing Flight.
TOTAL BASE BID (SEQUENCE I )
SUM OF GALLERIES # 103, 203, 205, 102, 106 & 206 AND BOND Firm Fixed Price: $________
OPTION 1: Sequence II: Galleries in Zone #3
All work per drawings, specifications and attachments for Galleries # 107 & 207
| Gallery 107 – Wright Brothers | Firm Fixed Price: $_________ | ||
| Gallery 207 – One World Connected | Firm Fixed Price: $_________ | ||
| Bond | Firm Fixed Price: $_________ |
TOTAL PRICE OF GALLERIES # 107 & 207 & BOND Firm Fixed Price: $_________
TOTAL BASE BID SEQUENCE I GALLERIES PLUS SEQUENCE II GALLERIES PLUS BOND)
Firm Fixed Price: $_______________________________________(should be same price as break out by categories)
DEDUCTIONS
** In your price proposal detail and list out what changes to the drawings are covered in your pricing for each deductive option. Gallery 105 Reinventing Flight should not be included in any of the options below.
Deductive OPTION #2 Savings if non-reflective glass omitted with the exception provided list Firm Fixed Price $_________
Deductive OPTION #3 Savings if Replaced Marmoleum with carpet Firm Fixed Price $_________
Deductive OPTION #4 G-206 - Omit AV 206-06 Humans Reach the Moon Video Wall Firm Fixed Price $_________
Deductive OPTION #5 G-206 - Omit DC 206-31 Apollo Command Module Case Firm Fixed Price $_________
Deductive OPTION #6 G-206 - Omit DC 206-38 Lunar Roving vehicle case Firm Fixed Price:$_________
Deductive OPTION #7 G-206 - Omit DC 206-16 Bezos Case Firm Fixed Price:$_________
Deductive OPTION #8 Firm Fixed Price:$_________ Other Materials VE
Deductive OPTION #9 Firm Fixed Price:$_________ Level #1 AV/CI Reductions
Deductive OPTION #10 Firm Fixed Price:$_________ Level 1 (Content Reductions (Cases, Media, etc)
Deductive OPTION #11 Firm Fixed Price:$_________ Level #2 AV/CI Reductions
Deductive OPTION #12 Firm Fixed Price:$_________ Level 2 (Content Reductions (Cases, Media, etc)
Deductive OPTION #13 Firm Fixed Price:$_________ Miscellaneous Reductions
TOTAL OF ALL DEDUCTIVE OPTIONS #2 - #13: $ _____________________________________
II. PRICING BROKEN BY CATEGORIES:
Includes BASE BID (GALLERIES 103, 203, 205, 102, 106, and 206) and OPTION I (GALLERIES 107 and 207) AV/CI Hardware Firm Fixed Price: $_________
Exhibitry Firm Fixed Price: $_________
Display Cases Firm Fixed Price: $_________
Mechanical/Physical Interactives Firm Fixed Price: $_________
Graphics Firm Fixed Price: $_________
Base Build Firm Fixed Price: $_________
Lighting Firm Fixed Price: $_________
Black Box Connectivity Firm Fixed Price: $_________
General Conditions Firm Fixed Price: $_________
Installation Firm Fixed Price: $_________
Bond Firm Fixed Price: $_________
TOTAL BASE BID SEQUENCE I GALLERIES PLUS SEQUENCE II GALLERIES PLUS BOND)
Firm Fixed Price: $_______________________________________ (should be same price as break out by galleries)
III. PRICES FOR ANY SCOPE REDUCTION RECOMMENDATIONS THAT COULD RESULT IN COST SAVINGS AS DETAILED IN PLAN OF ACCOMPLISHMENT SECTION OF TECHNICAL PROPOSAL.