This is a Questions and Answers document related to an LED Lighting Conversion project solicitation issued by the Cherokee County School District (CCSD) in Georgia. The document compiles vendor inquiries and responses from multiple contractors including Bell Electric Lighting, Capital City Electrical Services, Sam Jones, Inergy Solutions, and Regency Supply, generated through February 3, 2026. The project requires the replacement or retrofitting of LED lighting fixtures across multiple CCSD facilities, including bus shops, middle and high schools, support services buildings, technology centers, and an education service facility. Key clarifications provided include: Training Center scope must be included with Bus Shop 2; Middle School and High School proposals should be quoted separately with shared facilities assigned to High School; existing branch wiring should be reused; dimmers are required in classrooms, media centers, offices, and cafeterias with 0-10V control cables concealed above ceilings; work should be completed during school breaks with evening work permitted during school days; and all fixtures shown on drawings must be replaced, with standard 2x4 flat panels assumed for unmarked fixtures. The project allows for site visits to verify ceiling heights and equipment accessibility, and building addresses were clarified for technology centers (G=1030, H=1020, I=1010).
Multiple vendors raised concerns regarding the clarity and readability of fixture schedules and lighting layouts within the provided drawings and specifications. Paula Hilton, the procurement official responding to inquiries, consistently indicated that no alternative or clearer prints were available and directed vendors to quote based on what is shown on existing drawings or to assume standard fixtures where information is unclear. Vendors were instructed to reference only the provided drawings and proposal forms for pricing determinations, and shared spaces between facilities were specifically assigned to ensure accurate pricing separation across the multiple school locations and support service buildings involved in the conversion project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Generated on Feb 03, 2026 4:18 PM EST - Paula Hilton
Vendor Discussions
Bell Electric
Lighting Schedule alexandria Andrews, Feb 02, 2026 2:29 PM EST
There is a lighting schedule attached to the Lighting Layout Documents. Would it be possible if they're sent separately? They're blurry and unreadable.
Paula Hilton, Feb 03, 2026 10:05 AM EST
There are no other prints.
Question for project alexandria Andrews, Feb 03, 2026 9:57 AM EST
Q1. Training Center There is a Training Center sheet shown on Page 3 of the binder; however, we do not see a corresponding Training Center breakdown in the proposal form. Please confirm with your GC whether the Training Center scope is required to be included in our pricing. Q2. Woodstock MS & Woodstock HS Breakdown In the proposal form Excel sheet, Woodstock MS and Woodstock HS are shown as separate breakdowns. However, based on Pages 27–29 of the drawings, it appears both schools are combined.
Specifically, Page 29 seems to consider them together. Please clarify whether these should be priced separately or combined. Q3. Building Levels Identification On Pages 17–19, three (3) levels are shown, but there is no indication of which building or school these levels correspond to. Please clarify which facility these levels belong to. Q4. Branch Wiring for Fixtures Please confirm whether we are required to include new branch wiring for the light fixtures, or if we should assume the existing branch wiring is to be reused. Q5.
Dimming Requirements Per the specifications, it appears that one dimmer switch per room is required. Please confirm if this interpretation is correct. Additionally, please confirm whether 0–10V dimming control cable is required. If so, should this be installed in Wiremold or concealed above the ceiling? Q6. Fixture Schedule Clarity Some of the fixture schedules on the drawings are unclear/blurry. Please provide a clearer version if available. If a clearer version is not available, please confirm whether we may reference and reuse the fixture schedule from other drawings where the same fixture types and shapes are clearly shown.
Paula Hilton, Feb 03, 2026 4:16 PM EST
1.Training center should be included in the proposal for bus shop 2 2.Middle school quote will be one quote the high school and Shared facilities should be one quote 3.Education service facility 4.Assume existing branch wiring 5.Dimmers are in each classroom, media center, office, and Cafeteria. 0-10 wiring should be concealed above the ceiling. 6.No other drawings are available.
Capital City Electrical Services
Questions
Rick Moore, Feb 02, 2026 1:34 PM EST
Can you extend bid date to allow for proper time for manufacturers to cross over to an acceptable LED fixture?
Paula Hilton, Feb 02, 2026 3:01 PM EST
No
Rick Moore, Feb 02, 2026 1:35 PM EST
Can we visit the various sites to verify ceiling heights, accessibility of equipment, and existing mounting? If so, can you provide contact names for locations to schedule with?
No
Rick Moore, Feb 02, 2026 1:35 PM EST
It is stated that every light at the facility must be replaced or retrofitted to an LED….however not all rooms are showing fixtures. Just to confirm, only fixtures shown on drawings are to be replaced?
Build on the quote based on prints.
Rick Moore, Feb 02, 2026 1:47 PM EST
The specs specify that work to be completed during school breaks. Is evening work permitted during scheduled school days?
Paula Hilton, Feb 02, 2026 3:02 PM EST
Yes
Rick Moore, Feb 03, 2026 12:43 PM EST
On the Middle and High School, just want to confirm auditorium, theater, media center are all considered common areas
Rick Moore, Feb 02, 2026 2:23 PM EST
The fixture schedules on Bud Garage I are unreadable. Can you provide clearer schedules?
Rick Moore, Feb 02, 2026 2:25 PM EST
The lighting schedule on Bus Shop II is unreadable. Can you provide a clear schedule?
Rick Moore, Feb 03, 2026 1:24 PM EST
On the middle/high schools, you have center basket type lighting....do you want the same style LED to go back in?
Paula Hilton, Feb 03, 2026 4:16 PM EST
Yes
E. Sam Jones
RFI 1
Jackie Searles, Jan 29, 2026 9:25 AM EST
The drawings for 200 support services only show emergency lighting and exits. Is there a drawing showing all lighting in this space?
Paula Hilton, Feb 02, 2026 3:00 PM EST
Please quote what is shown on the drawings.
RFI 2
Jackie Searles, Jan 29, 2026 9:28 AM EST
For the Middle school and High school, total counts have been provided but not separated by school. The Proposal form shows the schools separated. Are there counts for each school? Or if we are to count the drawings and separate the schools, where should the shared spaces be quoted?
Shared spaces should be quoted to high school. Please separate the Middle School.
Drawings vs proposal form
Jackie Searles, Feb 03, 2026 1:57 PM EST
For the Technology Support Centers Which address is bldg G, H and I tied to? Also there is a training center drawing. Which location should that training center drawing be tied to? Also there are 3 drawings showing Financial Management/Human resources Level One, Level 2 is curriculum and instruction, and lvl 3 shows super intendent and school operations. What building/quote should these 3 levels go under on the proposal sheet?
Paula Hilton, Feb 03, 2026 4:17 PM EST
G=1030,H=1020,I=1010. Training center is Bus shop 2, and The 3 levels will be for Education Service Facilities.
Inergy Solutions
BUS SHOP 1
Silvin Sinan, Feb 02, 2026 2:10 PM EST
The Lighting Fixture Schedule is not clear on the drawings provided to determine the Type of Fixtures in the GREEN LIGHTS and the RED LIGHTS sections. Do you have a clearer Lighting Fixture Schedule for these areas.
Paula Hilton, Feb 02, 2026 3:02 PM EST
No other prints available.
BUS SHOP 2
Silvin Sinan, Feb 02, 2026 2:14 PM EST
The Lighting Fixture Schedule is not clear on the drawings provided to determine the Type of Fixtures in the SHOP LIGHTING SCHEDULE SHOP EXTERIOR: K-12 (PUMP ISLAND) – Please confirm what is the fixture type as there are no specific drawing for this area or schedule. Does the schedule include the description for K and L fixture types.
Paula Hilton, Feb 02, 2026 3:03 PM EST
No other information available.
TRAINING CENTER
Silvin Sinan, Feb 02, 2026 2:15 PM EST
Do we need to include this area as part of our proposal if so, do we need to combine it with BUS SHOP 2. The Training Center is not listed as one of the areas required in the Excel Proposal Form provided.
Please combine
135 – SCHOOL NUTRITION
Silvin Sinan, Feb 02, 2026 2:15 PM EST
In the “Verify Offices” area are there only 4 fixtures in this area K2 = 3 and K3 =1?
If shown on drawing as 4, please quote for 4.
200 – SUPPORT SERVICES
Silvin Sinan, Feb 02, 2026 2:17 PM EST
In this area, please confirm that the only fixtures to be replaced are the ones marked in RED? Also, the fixtures on the drawings do not have any Fixture Alphabets next to the fixture icon/symbol. Can you please confirm.
Paula Hilton, Feb 02, 2026 3:04 PM EST
All fixtures need to be replaced that are shown on the drawing. If no information is given please assume standard 2x4 flat panel.
201 – SUPPORT SERVICES
Silvin Sinan, Feb 02, 2026 2:19 PM EST
There is an area on the bottom righthand side of the drawing that has a total of 44 slim rectangular shapes.
Should this be included in anyway or not?
Paula Hilton, Feb 02, 2026 3:04 PM EST
Please include all light fixtures that are shown on the drawing.
TECHNOLOGY ANNEX
Silvin Sinan, Feb 02, 2026 2:22 PM EST
As per the Excel Proposal Form it refers to 1010 Technology, 1020 Technology and 1030 Technology.
However, the drawings refer to different names - Technology Warehouse Annex Building “I”, Technology Support Training Center Building “H” and Technology Support Service & Data Center Building “G” as well as Platform Level. Please provide the correct names on the drawings to reflect the same as the Excel Proposal Form, to ensure we price the area accordingly.
Paula Hilton, Feb 03, 2026 10:04 AM EST
G=1030, H=1020, I=1010
Regency Supply
Document # 7 Attachment F
Luis Espino, Jan 28, 2026 12:32 PM EST
Greetings, The lighting schedules within attachment F are blurry once downloaded. Is there another copy that might have the types of fixtures clearly identified? Thank you
Paula Hilton, Feb 02, 2026 3:00 PM EST
No other drawings.