The document is an electrical site plan (E1) for the Portland Air National Guard (PANG) Alert Guard Shack Construction project, prepared by Miller - Cook Architects. The electrical drawing provides detailed technical specifications for the installation of a new 8'-0" x 17'-0" x 9'-8" prefabricated guard booth, including comprehensive site electrical layout, service conduit sections, transformer and pole base details, camera floodlighting pole details, and a complete symbol list for electrical components. The plan includes precise engineering drawings showing electrical infrastructure, grounding systems, power distribution, and mounting configurations for various electrical systems and equipment.

The electrical site plan supports the Oregon Military Department's procurement project at 6801 NE Cornfoot Rd. in Portland, with a projected budget between $50,000 and $125,000, funded through state and federal sources. The project requires specialized electrical installations compatible with a bullet-resistant guard booth manufactured by B.I.G. Enterprises, meeting Underwriters Laboratories UL752 Level 3 standards. The electrical design incorporates multiple technical considerations, including utility connections, security system integration, lighting, and compliance with federal and state procurement regulations. Contractors will need security clearance, must obtain necessary permits, and adhere to comprehensive safety and technical specifications detailed in the architectural and electrical drawings.

View the file

Other files

File Type Posted
ITB update Guard Shack - bid extension2.pdf PDF
PANG Guard Shack Bid Sheet001.pdf PDF
ATTACHMENT 7 Responsibility Inquiry~1.pdf PDF
PANG GUARD SHACK PREBID SIGN IN001~1.pdf PDF
Notice of Intent to Award guard shack-signed.pdf PDF
Notice To Proceed essex.pdf PDF
PANG Base G-11 Composite Utility Plan.pdf PDF
RFI Responses - Alert Shack Demo FINAL.pdf PDF
PANG Guard Shack ECP Project C-25-003 SIGNED.pdf PDF
Drawings for new ECP.pdf PDF
G-11 Composite Utility Map.pdf PDF
RFI Responses - Alert Shack Demo - 5-19.pdf PDF
G-11 Composite Map D-size.pdf PDF
ITB update Guard Shack - bid extension.pdf PDF
BLDG 215_FP01.pdf PDF
RFI Responses - Alert Shack Demo - updated.pdf PDF
Existing Guard Shack As-Builts.pdf PDF
RFI Responses - Alert Shack Demo FINAL.pdf PDF
Existing Guard Shack As-Builts.pdf PDF
BLDG 215_FP01.pdf PDF
G-11 Composite Map D-size.pdf PDF
ITB update Guard Shack - bid extension.pdf PDF
PANG Base G-11 Composite Utility Plan.pdf PDF
ITB update Guard Shack.pdf PDF
18-E1 - Electrical Site Plan.pdf PDF
RFI Responses - Alert Shack Demo - updated.pdf PDF
G-11 Composite Utility Map.pdf PDF
PANG GUARD SHACK PREBID SIGN IN001~1.pdf PDF
ITB update Guard Shack~1.pdf PDF
Drawings for new ECP.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .