18-2.2 (UPDATED) ADMIN SPECS 01025 MEASUREMENT PAYMENT.pdf

PDF 111 KB Posted

Attached to
COMMUNITY CENTER ARCHITECTURAL DESIGN SERVICES
Solicitation number
Not on record
Issued by
Delaware County, Pennsylvania

About this file

Administrative Specifications for Measurement and Payment

This is an administrative specification document for measurement and payment procedures applicable to construction contracts administered by Upper Darby Township in Delaware County, Pennsylvania, for projects including the Naylors Run Trail Section 5A, Golf Road Parking Lot improvements, 2026 street resurfacing, and Observatory Hill Recreation Area Phase I. The specifications establish the criteria for measuring work performed under both unit price and stipulated lump sum payment methods, with measurement methodologies including by number, volume, area, linear dimension, weight, or combinations thereof as appropriate to the work type. Payment is calculated based on actual quantities verified by the Engineer multiplied by the contracted unit or lump sum prices, with final payment determined upon completion and acceptance of work. The document categorizes bid items by payment structure: items 1.1, 1.2, 1.4, 1.5, 1.10, 1.25, 1.36, and 1.42 are paid as lump sum; items including trail amenities, sidewalks, and concrete work are paid per each unit; items such as fencing and curbing are paid per linear foot; landscaping and pavement marking items are paid per square foot; and select items are paid per cubic yard. All unit prices and lump sum bids must include comprehensive costs for materials, labor, equipment, mobilization, demobilization, traffic control, site restoration, utility adjustments, dust control, and all incidental work and supervision.

Payment is withheld for any products or work not conforming to specifications, including wasted materials, unacceptable products before or after placement, products placed beyond required lines and levels, products remaining on hand after completion, and costs associated with loading, hauling, and disposing of rejected products. Contractors must replace deficient work at no additional cost. The specification emphasizes that all measurements and quantities are determined by actual work performed as verified by the Engineer, with bidders not entitled to additional compensation except through written authorization from the Owner. No specific budget amounts are detailed in this measurement and payment specification; however, the related contract opportunities indicate that projects range from significant infrastructure improvements requiring 100 percent performance bonds and 25 percent maintenance bonds, with bid submissions required through PennBid and subject to Pennsylvania prevailing wage requirements for contractors bidding $100,000 or greater.

View the file

Other files

File Type Posted
8-2.3 ADMIN SPECS 01201 PRECONSTRUCTION CONFERENCE.pdf PDF
3-2.2 ADMIN SPECS 01025 MEASUREMENT PAYMENT.pdf PDF
13-1.3 APPENDIX K - DCNR.pdf PDF
15-5.0 UDT RCO ORD NO 3107.pdf PDF
14-1.0 FRONT END SPECS (OBSERVATORY HILL REBID).pdf PDF
11-2.5 ADMIN SPECS 01700 PROJECT CLOSEOUT.pdf PDF
1-2.1 ADMIN SPECS 01010 CONTRACTORS WORK.pdf PDF
17-6.0 PLANS.pdf PDF
6-1.4 APPENDIX K - DCNR SIGNAGE POLICY.pdf PDF
5-2.0 ADMIN SPECS 01001 SPECIAL PROVISIONS.pdf PDF
7-1.1 ADVERTISEMENT - OBSERVATORY HILL REBID.pdf PDF
12-2.6 ADMIN SPECS 01720 PROJECT RECORD DOCUMENTS.pdf PDF
16-1.2 PGS D CONTRACT FORMS.pdf PDF
9-3.0 PA PREVAILING WAGES.pdf PDF
2-1.5 APPENDIX K - DCNR NONDISCRIMINATION - SEXUAL HARRASSMENT CLAUSE.pdf PDF
15-9.0 BID DOCUMENTS PAGES D-1 THRU D-9.pdf PDF
4-2.4 ADMIN SPECIFICATIONS 01340 Shop Drawings Samples.pdf PDF
17-6.0 PENNDOT 944 PROPOSAL FORM.pdf PDF
13-7.0 PREVAILING WAGE RATES.pdf PDF
19-10.0 UDT 2026 Streets Resurfacing Map FINAL.pdf PDF
9-2.6 ADMIN SPECIFICATIONS 01720 Project Record Documents.pdf PDF
20-11.0 STREET SCHEDULE.pdf PDF
14-4.3 PADOT SPECIFICATIONS PADOT SECTION 491.pdf PDF
3-2.0 ADMIN SPECIFICATIONS 01001 Special Provisions.pdf PDF
16-4.2 PADOT SPECIFICATIONS PADOT SECTION 411.pdf PDF
7-4.1 PADOT SPECIFICATIONS PADOT SECTION 409.pdf PDF
12-2.5 ADMIN SPECIFICATIONS 01700 Project Closeout.pdf PDF
8-1.1 ADVERTISEMENT.pdf PDF
10-4.0 PADOT SPECIFICATIONS PADOT SECTION 350.pdf PDF
2-2.3 ADMIN SPECIFICATIONS 01201 Preconstruction Conference.pdf PDF
2-Specifications.pdf PDF
1-Golf Road Parking Lot.pdf PDF
12-pages D-1 thru D-9.pdf PDF
4-01340 Shop Drawings Samples.pdf PDF
9-02930 Lawns Grasses.pdf PDF
1-01720 Project Record Documents.pdf PDF
15-UDT RCO Ord. no. 3107.pdf PDF
3-01700 Project Closeout.pdf PDF
8-02260 Finish Grading.pdf PDF
10-Naylors Run Trail Section 5A advertisement.pdf PDF
11-Nondiscrimination - Sexual Harassment Clause (3).pdf PDF
13-01010 Contractors Work.pdf PDF
16-Prevailing Wages.pdf PDF
17-Naylors Run Trail 5A - Bid Docs Complete 08.18.25.pdf PDF
18-Naylors Run Trail 5A Plans (Signed 08.12.25 r1).pdf PDF
2-01025 Measurement Payment.pdf PDF
5-02210 Rough Grading.pdf PDF
6-01001 Special Provisions.pdf PDF
7-01201 Preconstruction Conference.pdf PDF
14-Public Works Verification Form.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01025-1

SECTION 01025

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Measurement and payment criteria applicable to the Work performed under a Unit

Price payment method and stipulated Lump Sum method.

B. Defect assessment and non-payment for rejected work.

1.2 AUTHORITY

A. Measurement methods delineated in the individual specification sections, if any, are intended to complement the criteria of this section.

B. The Contractor shall take all measurements and compute quantities. The Engineer will verify measurements and quantities.

1.3 UNIT QUANTITIES SPECIFIED

A. Quantities and measurements indicated in the Form of Proposal are for bidding and contract purposes only. Quantities and measurements supplied or placed in the Work and verified by the Engineer shall determine payment.

B. If the actual Work requires more or fewer quantities than those quantities indicated, provide the required quantities at the unit or lump sum prices contracted.

1.4 MEASUREMENT OF QUANTITIES

A. Measurement by Number: Will be measured by the actual number of completed items installed.

B. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness.

C. Measurement by Area: Measured by square dimension using mean length and width or radius.

01025-2

D. Linear Measurement: Measured by linear dimension, at the item centerline or mean chord.

E. Stipulated Lump Sum or Unit Price Measurement: Items measured by weight, volume, area, or linear means or combination, as appropriate, as a completed item or unit of the Work.

1.5 PAYMENT

A. Payment Includes: Full compensation for all required supervision, labor, products, tools, equipment, plant, transportation, services, replacement of existing pavement markings with Thermo Plastic markings matching existing pavement marking sizes and to be included under the 11/2” Superpave wearing bid item, and all incidental work; erection, application or installation of an item of the Work; overhead and profit.

B. Final payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities accepted by the Engineer multiplied by the unit price for Work which is incorporated in or made necessary by the Work.

Replacement of existing line stripe for lane, stop bars and crosswalks are to be included in unit pricing.

1.6 DEFECT ASSESSMENT

A. Replace the Work, or portions of the Work, not conforming to specified requirements.

1.7 NON-PAYMENT FOR REJECTED PRODUCTS

A. Payment will not be made for any of the following:

1. Products wasted or disposed of in a manner that is not acceptable.

2. Products determined as unacceptable before or after placement.

3. Products placed beyond the lines and levels of the required Work.

4. Products remaining on hand after completion of the Work.

5. Loading, hauling, and disposing of rejected Products.

01025-3

PART 2 GENERAL

2.1 GENERAL

A. Payment for materials furnished and work done under this contract will be made as hereinafter stipulated for the amount of materials furnished and work performed under authorization of Engineers, or their authorized representative, and in accordance with their measurements. Contractor shall not be entitled to receive additional compensation for any work or materials except as shall be authorized by written order of the Owner.

B. The following items, classifying the various kinds of work, refer to respective items bid in the "Form of Proposal".

C. Items 1.1, 1.2, 1.4, 1.5, 1.10, 1.25, 1.36, 1.42: Payment will be made at the LUMP SUM prices bid per each item in the “Form of Proposal”. Lump sum prices bid shall include the cost of all materials; labor and equipment; mobilization and demobilization (shop drawings, scheduling, pre-construction video, coordination, bonds, insurance, including a separate

Owner’s Protective Coverage policy, permits, PA One Calls, temporary sanitary facilities, water, pre-construction meeting, progress meetings); traffic control (furnishing, installation, maintenance and removal of all signage, barriers, detour routes, flagmen, lights, flashers, cones, construction vehicles, provide safe pedestrian and vehicular access at all times); the removal of existing pavement, concrete, curb and sidewalk; unclassified excavation; survey work; construction stake out; rough grading; compaction; placement of compacted stone on a compacted sub-base; concrete ramps, sidewalks, curbs and curb walls; detectable warning surfaces; formwork; supply of concrete; concrete sealing; curing compound;, removal of all dirt and debris, layout, right of way restoration, street light fixtures, conduit, junction boxes, wiring, connection to existing electrical supply, light base foundations, adjustment of all utilities to final elevations, removal and proper disposal of excess materials; protection of existing features including buildings, trees and fences; dust control; all necessary sampling and testing and all appurtenant labor, work, supervision, tools, equipment, materials and all other items incidental thereto.

Items 1.3, 1.6 thru 1.9, 1.11, 1.12, 1.16, 1.22, 1.24, 1.26 thru 1.28, 1.32 thru 1.34, 1.37 thru

1.41, 1.47 thru 1.50: Payment will be made at the price bid per EACH in “Form of Bid”.

Payment will be made for the actual number installed as shown on construction plans. Unit price bid shall include: the cost of all materials; labor and equipment; mobilization and demobilization (shop drawings, scheduling, pre-construction video, coordination, bonds, insurance, including a separate Owner’s Protective Coverage policy, permits, PA One Calls, temporary sanitary facilities, water, pre-construction meeting, progress meetings);

unclassified excavation; survey work; construction stake out; rough grading; compaction;

proper disposal of excess materials; protection of existing features including buildings, trees and fences; dust control; all necessary sampling and testing and all appurtenant labor, work, supervision, tools, equipment, materials and all other items incidental thereto.

01025-4

Items 1.15, 1.17, 1.18, 1.23, 1.35, 1.44 thru 1.46: Payment will be made at the price bid per

LF in “Form of Bid”. Payment will be made for the actual LF placed as shown on the construction plans. Unit price shall include: the cost of all materials; labor and equipment;

mobilization and demobilization (shop drawings, scheduling, pre-construction video, coordination, bonds, insurance, including a separate Owner’s Protective Coverage policy, permits, PA One Calls, temporary sanitary facilities, water, pre-construction meeting, progress meetings); unclassified excavation; survey work; construction stake out; rough grading; compaction; proper disposal of excess materials; protection of existing features including buildings, trees and fences; dust control; all necessary sampling and testing and all appurtenant labor, work, supervision, tools, equipment, materials and all other items incidental thereto.

Items 1.13, 1.14, 1.19 thru 1.21, 1.30, 1.31, 1.43, : Payment will be made at the price bid per

SF in “Form of Bid”. Payment will be made for the actual SF placed as shown on the construction plans. Unit price shall include: the cost of all materials; labor and equipment;

mobilization and demobilization (shop drawings, scheduling, pre-construction video, coordination, bonds, insurance, including a separate Owner’s Protective Coverage policy, permits, PA One Calls, temporary sanitary facilities, water, pre-construction meeting, progress meetings); unclassified excavation; survey work; construction stake out; rough grading; compaction; proper disposal of excess materials; protection of existing features including buildings, trees and fences; dust control; all necessary sampling and testing and all appurtenant labor, work, supervision, tools, equipment, materials and all other items incidental thereto.

Items 1.29: Payment will be made at the price bid per CY in “Form of Bid”. Payment will be made for the actual CY placed as shown on the construction plans. Unit price shall include: the cost of all materials; labor and equipment; mobilization and demobilization

(shop drawings, scheduling, pre-construction video, coordination, bonds, insurance, including a separate Owner’s Protective Coverage policy, permits, PA One Calls, temporary sanitary facilities, water, pre-construction meeting, progress meetings); unclassified excavation; survey work; construction stake out; rough grading; compaction; proper disposal of excess materials; protection of existing features including buildings, trees and fences; dust control; all necessary sampling and testing and all appurtenant labor, work, supervision, tools, equipment, materials and all other items incidental thereto.

END OF SECTION