17-6.0 PENNDOT 944 PROPOSAL FORM.pdf
PDF 409 KB Posted
- Attached to
- COMMUNITY CENTER ARCHITECTURAL DESIGN SERVICES
- Solicitation number
- Not on record
- Issued by
- Delaware County, Pennsylvania
About this file
This is a PennDOT MS-944 Proposal and Contract Form for the 2026 Resurfacing of Various Streets in Upper Darby Township, a municipality in Delaware County, Pennsylvania. The project encompasses milling, asphalt wearing courses, bituminous base repair, bituminous leveling course, speed hump installation, traffic loop detector installation, line striping, and pavement marking across multiple township streets including Chestwold Road, Redden Road, Lindale Avenue, Concord Avenue, Ormond Avenue, Edmonds Avenue, Highland Avenue, Sycamore Avenue, Franklin Avenue, Bond Avenue, Turner Avenue, Mason Avenue, Marvine Avenue, Huey Avenue, Maplewood Avenue, Mill Street, McCoy Street, Randolph Street, Sloan Street, Cleveland Avenue, Barrington Road, Heather Road, Kent Road, Walnut Street, Crosley Avenue, and Long Lane. The base bid includes approximately 116,290 square yards of milling and 9.5-millimeter wearing course work, 1,000 square yards of four-inch base repair, and 100 tons of leveling course. Sealed bids must be submitted online through PennBid by 11:00 AM on April 3, 2026, with opening and reading occurring at the same time. The contract requires completion within 90 calendar days from the notice to proceed, with liquidated damages assessed at $500 per calendar day for delays. Additional alternate items include pavement striping, crosswalk markings, parking striping, stop bars, and railroad crossing markings across specified road sections.
The proposal requires submission of a certified check or bid bond equal to 10 percent of the total bid amount payable to Upper Darby Township. All bidders must comply with the Upper Darby Township Responsible Contractors Ordinance for bids of $100,000 or greater, including proof of competency and responsibility. The successful contractor must furnish performance bonds and labor and material bonds in 100 percent of the contract amount, carry appropriate insurance with the municipality and Pennoni Associates Inc. named as additional insureds, and adhere to prevailing wage requirements. Work is restricted to Monday through Saturday, 7:00 AM to 7:00 PM, with no operations permitted on Sundays or holidays without written municipal permission. The maximum elapsed time between milling operations and paving is limited to five working days unless written approval is obtained. All work must comply with current PennDOT Specifications (Publication 408), with volumetric testing of bituminous paving materials excluded. No escalator clause has been adopted for this contract. The contractor bears responsibility for defects occurring within 18 months of application and must provide certification and inspection documentation throughout the project lifecycle.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MS-944 (7-09)
PROPOSAL AND CONTRACT
( WHEN EXECUTED ) THIS PROPOSAL INCLUDES
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS ON PAGE 4
A. DEPOSIT OF PROPOSALS.
All envelopes containing Bid proposals shall
Upper Darby Township
2026 Resurfacing of Various Streets in Upper
Darby Township be clearly marked “Bid Proposal for letting of MUNICIPALITY (NAME & TYPE)
April 3, 2026 ."
DATE Edward Brown
Towsnhip Mayor
Sealed Proposals will be received on or before
11:00 AM on the above Letting Date. 100 Garett Rd
TIME Uperr Darby PA 19082
ADDRESS
Bids will be opened and read at approximately
11:00 AM , on the above Letting Date.
PROPOSALS MUST BE SUBMITTED ONLINE
THRU THE PENNBID WEB SITE.
TIME .
The contractor proposes to furnish and deliver all materials ( including Form CS-4171, CERTIFICATE OF COMPLIANCE and/ or TR-465 DAILY BITUMINOUS MIXTURE
CERTIFICATION ) and to do and perform all work on the following project as more specifically set forth in the Schedule of Prices (Attachment), in accordance with drawings and specifications on file at Upper Darby Township as well as the supplements and special requirements contained herein and/ or attached hereto and current PennDOT
Specifications (Publication 408), except Volumetric testing of bituminous paving materials is not required (Sec. 409).
If designated as the successful bidder, the contractor will begin work on the date specified in the notice to proceed, or as otherwise provided in the special requirements, and will complete all work within see attachment
1-B calendar days.
3 Accompanying this proposal is a certified check or bid bond in the amount of 10% of Bid made payable to the municipality as a proposal guarantee which, it is understood, will be forfeited in case the contractor fails to comply with the requirements of the proposal.
B. PROPOSAL OF:
NAME / ADDRESS OF CONTRACTOR
CONTRACTORS CERTIFICATION
It is hereby certified as follows:
1 The only person interested in the proposal as principal (s) is (are):
2 None of the above persons are employees of the municipality.
3 This proposal is made without collusion with any other person, firm or corporation.
All plans and specifications referred to above and the site of the work have been examined by the contractor. The contractor understands that the quantities indicated herein are approximate and are subject to change as may be required; and that all work is payable on the basis of the unit price listed on the Schedule of Prices. (Attachment 1).
The contractor will comply with all requirements of the laws and implementing regulations of the
Commonwealth of Pennsylvania and the United States relating to human relations, equal opportunity and non-discrimination in employment, and will pay to workmen employed in the performance of the contract the wages to which they may be entitled.
6 The contractor will provide the municipality with a performance bond, conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions thereof, and a payment bond, conditioned on the prompt payment of all material furnished and labor supplied or performed in the prosecution of the work, in accordance with the Public Works
Contractors’ Bond Law of 1967; and an affidavit accepting the provisions of the Workmen’s
Compensation Act of 1915, as amended.
CONTRACTOR
BY: DATE:
TITLE:
WITNESSED OR ATTESTED BY: DATE:
TO BE EXECUTED ONLY IN THE EVENT THE ABOVE PROPOSAL IS ACCEPTED
ACCEPTED ON :
DATE
Township of Upper Darby
Township
BY:
BY:
TITLE: Ge
BY:
ATTESTED BY:
SEAL
ATTACHMENT 1 5/29/18
TO MS - 944 ( PROPOSAL AND CONTRACT MS - 944 ) Revised
County:
Montgomery
Municipality: Upper Darby Township
Project Number:
T
H
IS
P O
R T
IO
N
T O
B E
C O
M P
L E
T E
D
B Y
T H
E M
U N
IC
IP
A L
IT
Y
LOCATION OF WORK:
See attached map
DESCRIPTION OF WORK:
Milling, asphalt wearing courses, bituminous base repair, bituminous leveling course, speed hump installation, traffic loop detector installation, line striping, and pavement marking in accordance with Municipal Specifications (attached) and PennDOT 408 specifications, latest edition thereof.
ESCALATOR CLAUSE:( if adopted by Municipality.)
It has not been adopted by Municipality.
SCHEDULE OF PRICES
Item
1 No.
Approximate
2 Quantities
Unit
*Description
Unit
5 Price
Total
BASE ITEMS
ALL ROADS
1-1 1000 SY 4” BASE REPAIR 25MM
1-2 100 TON LEVELING COURSE 9.5 MM WEARING
CHESTWOLD RD.
1-3 4711 SY 1.5” MILLING
1-4 4711 SY 1.5” 9.5MM WEARING
REDDEN RD.
1-5 1895 SY 1.5” MILLING
1-6 1895 SY 1.5” 9.5MM WEARING
LINDALE AVE.
1-7 11523 SY 1.5” MILLING
1-8 11523 SY 1.5” 9.5MM WEARING
CONCORD AVE.
1-9 3028 SY 1.5” MILLING
1-10 3028 SY 1.5” 9.5MM WEARING
ORMOND AVE.
1-11 2629 SY 1.5” MILLING
1-12 2629 SY 1.5” 9.5MM WEARING
EDMONDS AVE.
1-13 8479 SY 1.5” MILLING
1-14 8479 SY 1.5” 9.5MM WEARING
HIGHLAND AVE.
1-15 2330 SY 1.5” MILLING
1-16 2330 SY 1.5” 9.5MM WEARING
SYCAMORE AVE.
1-17 6013 SY 1.5” MILLING
1-18 6013 SY 1.5” 9.5MM WEARING
FRANKLIN AVE.
1-19 497 SY 1.5” MILLING
1-20 497 SY 1.5” 9.5MM WEARING
BOND AVE.
1-21 4455 SY 1.5” MILLING
1-22 4455 SY 1.5” 9.5MM WEARING
TURNER AVE.
1-23 6041 SY 1.5” MILLING
1-24 6041 SY 1.5” 9.5MM WEARING
MASON AVE.
1-25 5471 SY 1.5” MILLING
1-26 5471 SY 1.5” 9.5MM WEARING
MARVINE AVE.
1-27 4880 SY 1.5” MILLING
1-28 4880 SY 1.5” 9.5MM WEARING
HUEY AVE.
1-29 2630 SY 1.5” MILLING
1-30 2630 SY 1.5” 9.5MM WEARING
MAPLEWOOD AVE.
1-31 772 SY 1.5” MILLING
1-32 772 SY 1.5” 9.5MM WEARING
MILL ST.
1-33 110 SY 1.5” MILLING
1-34 110 SY 1.5” 9.5MM WEARING
MCCOY ST.
1-35 724 SY 1.5” MILLING
1-36 724 SY 1.5” 9.5MM WEARING
RANDOLPH ST.
1-37 1616 SY 1.5” MILLING
1-38 1616 SY 1.5” 9.5MM WEARING
SLOAN ST.
1-39 773 SY 1.5” MILLING
1-40 773 SY 1.5” 9.5MM WEARING
CLEVELAND AVE.
1-41 742 SY 1.5” MILLING
1-42 742 SY 1.5” 9.5MM WEARING
BARRINGTON RD.
1-43 5281 SY 1.5” MILLING
1-44 5281 SY 1.5” 9.5MM WEARING
HEATHER RD.
1-45 2098 SY 1.5” MILLING
1-46 2098 SY 1.5” 9.5MM WEARING
KENT RD.
1-47 3067 SY 1.5” MILLING
1-48 3067 SY 1.5” 9.5MM WEARING
WALNUT ST.
1-49 3067 SY 1.5” MILLING
1-50 3067 SY 1.5” 9.5MM WEARING
CROSLEY AVE.
1-51 1778 SY 1.5” MILLING
1-52 1778 SY 1.5” 9.5MM WEARING
LONG LANE
1-53 2316 SY 1.5” MILLING
1-54 2316 SY 1.5” 9.5MM WEARING
*Continued on Attachment 1-A
* DESCRIPTION:
Must include ADT on wearing surfaces
USE OF CUTBACK ASPHALT IS PROHIBITED
BETWEEN MAY 1st AND OCTOBER 31st, EXCEPT
AS NOTED IN BULLETIN NO. 25.
FOR OPTION OR PHASE BIDS THE TOTALS FOR
EACH MUST BE INCLUDED.
BASE BID TOTAL FROM
ATTACHEMENT 1
ADD ALTERNATE NO. 1
TOTAL BASE BID AND ALL ALTERNATES
*Description
Unit
5 Price
Total
ALTERNATE ITEMS
#2-1 650 LF Cheswold Rd – Burmont Rd to Marshall Rd – 4" Yellow
Line Striping
#2-2 282 LF Cheswold Rd – Burmont Rd to Marshall Rd – 4" White
Crosswalk Striping
#2-3 187 LF Cheswold Rd – Burmont Rd to Marshall Rd – 4" White
Parking Striping
#2-4 15 LF Cheswold Rd – Burmont Rd to Marshall Rd – 24" White
Stop Bar
#2-5 52 LF Redden Rd – Cheswold Rd to Childs Ave – 4" White
#2-6 140 LF Edmonds Ave – Woodland Ave to Jones St – 4" Yellow
#2-7 374 LF Edmonds Ave – Woodland Ave to Jones St – 4" White
#2-8 55 LF Edmonds Ave – Woodland Ave to Jones St – 24" White
#2-9 169 LF Edmonds Ave – Woodland Ave to Jones St – 4" White
#2-10 1 EA Edmonds Ave – Woodland Ave to Jones St – Railroad
Crossing Marking
#2-11 126 LF Bond Ave – Penn Ave to Ormond Ave – 4" White
#2-12 102 LF Bond Ave – Penn Ave to Ormond Ave – 4" White
#2-13 44 LF Turner Ave – Garrett Rd to State Rd – 24" White Stop
Bar
#2-14 3 EA Turner Ave – Garrett Rd to State Rd – Railroad
Crossing Marking
#2-15 54 LF Mason Ave – School Ln to State Rd – 4" White
#2-16 101 LF Marvine Ave – Dead End to Agnew Dr – 4" White
#2-17 43 LF Marvine Ave – Dead End to Agnew Dr – 4" White
#2-18 35 LF Huey Ave – Edmonds Ave to Burmont Rd – 4" Yellow
#2-19 31 LF Huey Ave – Edmonds Ave to Burmont Rd – 24" White
#2-20 8 LF Mill St – Edmonds Ave to Dead End – 24" White Stop
#2-21 1 EA Mill St – Edmonds Ave to Dead End – Railroad Crossing
Marking
#2-22 47 LF Mccoy St – Edmonds Ave to Burmont Rd – 4" White
#2-23 54 LF Mccoy St – Edmonds Ave to Burmont Rd – 4" White
#2-24 12 LF Mccoy St – Edmonds Ave to Burmont Rd – 24" White
#2-25 50 LF Randolph St – Edmonds Ave to Sloan St – 4" White
#2-26 13 LF Randolph St – Edmonds Ave to Sloan St – 24" White
#2-27 307 LF Cleveland Ave – Long Ln to N Church Ln – 4" White
#2-28 170 LF Barrington Rd – Chestnut St to Marshall Rd – 4" White
#2-29 198 LF Heather Rd – Walnut St to Marshall Rd – 4" White
#2-30 41 LF Kent Rd – Walnut St to Marshall Rd – 4" White
#2-31 186 LF Kent Rd – Walnut St to Marshall Rd – 4" White Parking
Striping
#2-32 73 LF Walnut St – Kent Rd to Barrington Rd – 4" Yellow Line
Striping
#2-33 86 LF Walnut St – Kent Rd to Barrington Rd – 4" White
#2-34 18 LF Walnut St – Kent Rd to Barrington Rd – 24" White Stop
#2-35 256 LF Crosley Ave – Greenwood Ave to Dead End – 4" White
#2-36 74 LF Long Lane – Marshall Rd to Bradford Rd – 4" Yellow
#2-37 199 LF Long Lane – Marshall Rd to Bradford Rd – 4" White
#2-38 104 LF Long Lane – Marshall Rd to Bradford Rd – 4" White
Lane Striping
#2-39 35 LF Long Lane – Marshall Rd to Bradford Rd – 24" White
#2-40 1 EA Long Lane – Marshall Rd to Bradford Rd – Left Turn
Only Marking
#2-41 65 LF Long Lane – Marshall Rd to Bradford Rd – 10' Wide x
18" Long Ladder Crosswalk @ 24" Spacing
*Description
Unit
5 Price Total
(5-06) SPECIAL PROVISIONS TO CONTRACT MS-944 ( Attachment 1-B )
CONTAINS IMPORTANT INFORMATION FOR THE CONTRACTOR
The Prime Contractor and subcontractors must comply with all of the following provisions that are marked with an "X".
X Traffic Control and Safety Devices to be provided by the Contractor.
X ( Maintenance and Protection of Traffic to comply with current MUTCD, Publication 212 and Publication 213.)
X Delivery tickets for all materials.
X CS-4171 Certificate of Compliance and/ or TR-465 Daily Bituminous Mixture Certification required for all materials.
X Notify the Municipality five working days prior to start of project.
X Work to be completed on or before 90 days . After Notice to Proceed Liquidated damages apply at
X the rate of $ 500 per calendar day.
X Roadway to be power broomed by (contractor X municipality ) prior to start of project.
X Excess material to be removed by (contractor X municipality )
X Municipality to inspect project.
Need Bill of Lading for each shipment of bituminous material per Section 702.1(c) of Specifications 408.
X Tack Coat required per Section 460, or 409 for superpave, of Specifications 408 and is incidental to paving item unless noted otherwise.
Prime Coat required per Section 461 of Specifications 408.
X Bituminous Seal on all abutting pavement and curbs required.
X Saw cut or Milled Paving Notch required and incidental to paving item unless noted otherwise.
X Scratch/ Leveling Courses to be placed at the discretion of appointed inspector(s).
Full width pavement with one pass required.
X Municipality reserves the right to limit work completed.
Taper pavement the last 3 feet to curb.
For FOB Source bids, hauling distance will determine selection of bid award.
Municipality reserves the right to procure material which best suits their requirements after all bids and items are reviewed.
X Incidental Preparation and clean up required. ( Project Construction Materials )
X The municipality reserves the right to make an award on the basis of the aggregate total for all like items on which quotations are received.
X Provide design, which meets Specifications Form 408 to the municipality 5 days prior to start of work.
X Contractor responsible for defects that occur within 18 months of applications.
Contractor required to review proposed project with Municipality’s Representative prior to bidding.
Oil Samples required from each distributor truck by contractor (1) one quart : A.M. & P.M. and witnessed by municipality and retained by municipality. (Oil samples must be placed in an approved type container that is compatible with oil sample.)
At least three random stone samples to be taken by contractor on project site witnessed by municipality and retained by municipality.
Complete all testing in accordance with Specification Form 408 Section 409 except for superpave volumetric testing.
Nuclear Gauge Testing for density in accordance with PaDot Publication 408 Section 409
X Notice to Proceed will be the date of PennDOT Project Approval.
X Final Completion Certificate & Notice of Completion required.
X Future award of Contract will be based on quality of work as determined by the municipality.
X Contractor to notify all residents of pending work to be performed.
X See “List of Additional Contract Documents” for additional contract documents including contractor’s insurance requirements.
X Municipality and Pennoni Associates Inc. shall be named additionally insured. Three (3) copies of insurance shall be provided with the executed contract.
X Municipality work hours are 7:00 A.M. to 7:00 P.M. Monday through Saturday; no work, or operation of machinery, may be performed before or after these hours or on Sunday or holidays unless written permission is provided by the Municipality.
X The maximum elapsed time between the milling operation and the paving shall be five (5) working days unless written permission is provided by the Municipality. All restoration work on the roadway shoulder and edges must be completed within five (5) days of disturbance of the area. No areas shall be left in an unstabilized condition longer than five (5) days unless written permission is given by the engineer.
X The contractor is required to schedule a preconstruction meeting with the Municipality prior to commencing work on this contract.
X The contractor is required to submit a proposed schedule indicating anticipated start date, timeframe for project completion from beginning to end, and estimated sequence of construction.
X The Contactor’s construction operations, equipment, materials and any other such items shall not leave the permanent right-
X of-ways without written permission of the property owner and engineer.
For each roadway section under this contract, the contractor shall notify all property owners along the roadway section five (5) days prior to commencement of work on said roadway section. Notice shall be provided in writing, delivered by hand and/or posted for public view, and include: description and limits of work; date and time work will begin; duration of work; and traffic information such as road closures, detours, and parking restrictions.
X The Contractor shall neither damage nor destroy any curbs, sidewalk, driveway aprons, trees or shrubs. Tracking of paving equipment shall be limited to avoid damage to paved surfaces outside of work area. All damages are to be replaced in kind by the Contractor at no additional cost to the municipality.
X The Contractor is required to fully inform themselves concerning location of public utilities on, under or over the project which may or may not require removal, resetting, construction or reconstruction and which may interfere with their operations. They shall be assumed to have prepared their bid and entered into contract in full contemplation of the conditions to be encountered and their responsibility in connection therewith. The Contractor shall use special care in execution of the work in order to avoid interference or damage to any operating utilities (including, but not limited to painting exposed utility structures during construction). When there is any possibility of such interference or damage, the Contractor shall make satisfactory arrangements with responsible officers or owners of the utilities covering the necessary precautions to be used during performance of the work by the Contractor. Such arrangements shall be made before work is started and shall be subject to the approval of the engineer, which approval will not be considered as releasing the contractor from any responsibility for acts of themselves or their representatives.
X Adjustments to utility boxes are the responsibility of the contactor at no additional expense to the municipality.
X The Contractor is responsible for coordinating with the Municipality for any work near signalized intersections to avoid
X interference or damages to traffic signalization equipment on, under or adjacent to the roadway. Signal loops damaged during construction are to be replaced at the Contractor’s expense.
My signature signifies that I have read and understand the above special provisions to this contract, and by being authorized by this company to act as their authorized representative, and on their behalf hereby agree to adhere to any and all of the provisions pertaining to this contract.
Contractor’s Representative Date Municipality’s Representative Date
Upper Darby Township
Company Municipality
File details come from the government source that posted it. Updated .