Attachment_2_CJIS_Window_Price_Schedule-11.17.26.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Window Cleaning and Maintenance
Solicitation number
15F06727Q0000010
Issued by

About this file

This file is a Firm-Fixed-Price pricing schedule template for FBI Criminal Justice Information Services (CJIS) Window Maintenance and Cleaning Services. The schedule requires offerors to submit binding quotes for two recurring service CLINs during a base year and four option years: Window Cleaning (CLINs 0001, 1001, 2001, 3001, 4001) and Window Inspection (CLINs 0002, 1002, 2002, 3002, 4002). All option year prices must include specialized cleaning work as specified for each period—Option Year 1 includes RA Building and BTC Stair 6 cleaning; Option Year 2 includes BTC interior curtain-wall cores; and Option Year 3 includes RA Building and parking garage stairwell cleaning. Offerors must enter fully loaded annual prices for each CLIN in designated cells, with annual totals and the five-period evaluated recurring FFP total calculating automatically. The template explicitly excludes emergency labor, emergency materials, and case-by-case repairs from the evaluated recurring FFP price.

The schedule also includes a separate section for Emergency Hourly Labor Rates, requiring offerors to provide fully burdened regular and after-hours hourly rates for each labor category across all five contract periods. Offerors must specify any minimum call-out hours or after-hours premiums, and additional labor categories may be added as necessary. Emergency response work requires separate written Contracting Officer authorization and funding, with no guaranteed hours. Repair, replacement, emergency materials, and equipment costs are quoted and authorized on a case-by-case basis. Emergency hourly rates are reviewed for reasonableness but are not factored into the Lowest Priced Technically Acceptable (LPTA) FFP price ranking unless estimated quantities are provided.

View the file

Other files

Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Recurring FFP Pricing

ATTACHMENT 2 | FFP PRICE SCHEDULE
FBI CJIS Window Maintenance and Cleaning Services • Offeror quotation form
Contract periodCleaning CLINWindow Cleaning FFP ($)Window Inspection CLINInspection FFP ($)Annual total ($)
Annual Base00010002
Option 110011002
Option 220012002
Option 330013002
Option 440014002

TOTAL EVALUATED RECURRING FFP PRICE — BASE + FOUR OPTIONS

INSTRUCTIONS
• Enter a firm-fixed price for each recurring service CLIN in the highlighted cells.
• All option prices must include special cleaning work required for the corresponding period.
• Do not include emergency labor, emergency materials, or case-by-case repairs in these prices.
• Annual totals and the five-period evaluated recurring FFP total calculate automatically.
Option Year 1 includes RA Building and BTC Stair 6 cleaning; Option Year 2 includes BTC interior curtain-wall cores; Option Year 3 includes RA Building and parking garage stairwell cleaning.

Emergency Hourly Rates

ATTACHMENT 2 | EMERGENCY HOURLY LABOR RATES
Separate from evaluated recurring FFP total • Fully burdened hourly rates
Contract periodLabor categoryRegular hourly rate ($)After-hours hourly rate ($)Minimum call-out hours / premium
Base
Base
Option 1
Option 1
Option 2
Option 2
Option 3
Option 3
Option 4
Option 4
EMERGENCY RATE CONDITIONS
• Provide fully burdened rates for each proposed emergency-response labor category and contract period.
• Rates are binding for the stated period. State any minimum call-out hours or after-hours premiums explicitly.
• Additional labor categories may be inserted as necessary; ensure all five periods are covered.
• Emergency response requires separate written CO authorization and funding. No emergency hours are guaranteed.
• Repairs, replacements, emergency materials, and equipment will be quoted and authorized case by case.
• Hourly rates will be reviewed for reasonableness but are not included in the LPTA FFP price ranking absent estimated quantities.

File details come from the government source that posted it. Updated .