Questions and Answers 1 - 15A00023R00000085.docx

DOCX document 1 MB Posted

Attached to
Laboratory Dual In-Line Uninterrupted Power Supply Installation Federal contract opportunity
Solicitation number
15A00023R00000085
Issued by
Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives

About this file

This document contains questions and answers regarding Solicitation Number 15A00023R00000085 from the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives for a Laboratory Dual In-Line Uninterrupted Power Supply Installation. The questions and answers indicate that the solicitation is for a new 60kVA UPS to replace nine existing portable UPS units located at an unspecified facility. The new UPS must have a 480 Delta voltage input and 120/208 3 phase output to support additional equipment. No drawings, photos, or details of the current UPS installation location were provided. The site has a loading dock but the installation location is on a different floor. An on-site elevator is available but dimensions and weight limits were not specified. Material handling equipment is limited to carts and dollies, with no forklifts or pallet jacks available.

View the file

Other files for this federal contract opportunity

Other files attached to Laboratory Dual In-Line Uninterrupted Power Supply Installation, newest first.
File Type Posted
ATF Load Study.pdf PDF
Site Visit Q and A Part 2 - 15A00023R00000085.docx DOCX document
Attachment 1 - Statement of Work Update 2.docx DOCX document
FSL-A Chemistry Instrument Power Breakout.xlsx XLSX spreadsheet
Site Visit Q and A Part 1 - 15A00023R00000085.docx DOCX document
Attachment 1 - Statement of Work Update 1.docx DOCX document
Site Visit Instructions - 15A00023R00000085.docx DOCX document
Attachment 4 - Past Performance Survey.docx DOCX document
15A00023R00000085 - CO Signed.pdf PDF
Attachment 1 - Statement of Work.docx DOCX document
Attachment 2 - Quotation Instructions.docx DOCX document
Attachment 3 - Evaluation Criteria.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15A00023R00000085 Questions and Answers

1. Is the new 60kVA UPS to be provided and installed intended to replace the nine (9) portable UPS units currently located in the FSL-A?

0. Yes. It is also to support additional equipment that have no UPS.

1. Please provide the following information on the nine (9) existing portable UPS units:

1. This is N/A. We are looking at a single unit in leu of portable ones. They are being removed.

1. What is the phase characteristic required for the new UPS to be provided, three-phase or single-phase?

2. 480 Delta in, 120/208 3 phase out.

1. What is the voltage input and output required for the new system?

3. 480 Delta in, 120/208 3 phase out.

1. Are there any drawings of the floorplan and one-line electrical system of the site/location that can be shared?

4. N/A

1. Are there any photos of the installation location/space and current UPS installation that can be shared?

5. There is currently no UPS location. The nine (9) UPS being removed are portable.

5. This UPS is intended to replace the dry transformer. See attached photos.

1. Is the site equipped with a loading dock?

6. Yes.

1. Is the installation location on the same floor as the loading dock?

7. No.

1. If there is an elevator, what are the dimensions and weight limitations of said elevator?

8. There is an elevator. Dimensions and weight are to be determined.

1. Is the site equipped with any material handling equipment that can be used either by the site’s staff or by the bidder for the movement of equipment? i.e. forklift, pallet jack.

9. There are carts and dollies. No pallet jacks or forklifts.