FSL-A Chemistry Instrument Power Breakout.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 15A00023R00000085
About this file
This spreadsheet details power requirements for various laboratories and instruments within the Fire Debris Lab, XRD Lab, Explosives Lab, Explosives Lab 2, Trace Lab, and related uninterrupted power supply needs. Locations, instruments, voltage and amperage needs, circuit breakers, existing uninterruptible power supplies, and required upgrades are specified. A related federal contract opportunity from the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives seeks offers for laboratory dual in-line uninterruptible power supply installation to address the needs documented in the spreadsheet, with response due by the listed solicitation number and closing date. Relevant details include federal agency, required products and services, and incumbent equipment to be disposed of or upgraded.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Q and A Part 2 - 15A00023R00000085.docx | DOCX document | |
| Attachment 1 - Statement of Work Update 2.docx | DOCX document | |
| ATF Load Study.pdf | ||
| Site Visit Q and A Part 1 - 15A00023R00000085.docx | DOCX document | |
| Attachment 1 - Statement of Work Update 1.docx | DOCX document | |
| Questions and Answers 1 - 15A00023R00000085.docx | DOCX document | |
| Site Visit Instructions - 15A00023R00000085.docx | DOCX document | |
| 15A00023R00000085 - CO Signed.pdf | ||
| Attachment 4 - Past Performance Survey.docx | DOCX document | |
| Attachment 3 - Evaluation Criteria.docx | DOCX document | |
| Attachment 1 - Statement of Work.docx | DOCX document | |
| Attachment 2 - Quotation Instructions.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Location | Room | Name | Volts | Amps | VA | Hz | Circuit | Breakers | UPS?/comments | |
| Fire Debris Lab | 460 | FD1 | GC | 120 | 2250 | 47.5-63 | LD4 | 9/11 | Toshiba 6KVA-to be disposed | |
| need two quad boxes | MS | 120 | 1100 | 60 | ||||||
| run one new circuit to LD panel ~40 feet | ||||||||||
| 2 ovens verify the power pole is on LD panel | ||||||||||
| Fire Debris Lab | 460 | FD4 | GC | 220 | 2950 | 47.5-63 | LD5 | 10/12 | none | |
| need two quad boxes | MS | 120 | 1100 | 60 | LD1 | 45 | none | |||
| run one new circuit to LD ~40 feet | has a 220 already | |||||||||
| Fire Debris Lab | 460 | FD5 | GC | 120 | 2250 | 47.5-63 | LD4 | 2/4 | Toshiba 6KVA-to be disposed | |
| need to desginate a 220 outlet (has power) | MS | 220 | 1100 | 50-60 | ||||||
| has a 220 already | ||||||||||
| Fire Debris Lab | 460 | FD6 | GC | 120 | 2250 | 47.5-63 | LD2 | 78 | none | |
| need two quad boxes (has power) | MS | 120 | 1100 | 60 | ? | ? | none |
| Fire Debris Lab | 460 | FD7 | GC | 120 | 2350 | 50-60 | LD2 | 69 | Eaton 2KVA |
| need two quad boxes (has power) | MS | 120 | 1100 | 60 | LD1 | 47 | Eaton 1.5KVA |
| Fire Debris Lab | 460 | ISQ | GC | 120 | 2000 | 50-60 | LD4 | 5/7 | Toshiba 6KVA-to be disposed | |
| need one quad box (has power) | MS | 120 | 15 | 50-60 |
| XRD Lab | 456 | Panylitical | XRD | 230 | 38 | 60 | LD2 | 44 | none |
| has all outlets | Haskirs | Chiller | 208 | 15 | 60 | LD2 | 43 | none |
| Explosives Lab | 454 | FTIR | 120 | 10 | LD2 | 71 | Eaton 3KVA | |||
| need one quad box (has power) | ||||||||||
| Explosives Lab | 454 | HPLC | DAD | 120 | 255 | 50-60 | LD2 | 70 | Eaton 3KVA | |
| need one quad box (has power) | Sampler | 120 | 550 | 50-60 | ||||||
| Pump | 120 | 255 | 50-60 | |||||||
| Column | 120 | 330 | 50-60 |
| Explosives Lab2 | 450 | IC | Sampler | 120 | 4 | 50-60 | LD4 | 1/3 | Toshiba 8KVA-to be disposed |
| need one quad box (has power) | DC | 120 | 10 | 50-60 | |||||
| EG | 120 | 2 | |||||||
| Pump | 120 | 2 | 50-60 | ||||||
| Peak | Generator | 120 | 12 | 60 | |||||
| ISQEC | MS | 120 | 15 | 50-60 | ? | Eaton 2KVA |
| Explosives Lab2 | 450 | HPLC | DAD | 120 | 150 | 50-60 | LD2 | 76/77 | Powervar (new) | |
| need three 220 outlets (has power) | Sampler | 120 | 550 | 50-60 | ||||||
| need one quad box (has power) | Pump | 120 | 550 | 50-60 | ||||||
| Column | 120 | 330 | 50-60 | |||||||
| TSQ | MS | 230 | 10 | 50-60 | ||||||
| Peak | Generator | 230 | 7 | 50-60 | ||||||
| Sogevac | Pump | 230 | 12 | 50-60 |
| 441 | Bruker | XRD | 230 | ? | ? | ? | LD5 | 39/41 | Integrity (new) | |
| has all outlets | ||||||||||
| Trace Lab | 418 | EDAX | XRF | 120 | 13 | L1 | 59 | Eaton 2KVA | ||
| need one quad box (has power) | ||||||||||
| run one new circuit to LD panel ~30 feet | ||||||||||
| Trace Lab | 418 | FTIR | Bench | 120 | 10 | 50-60 | LD5 | 4 | Eaton 3KVA | |
| need one quad box (has power) | Scope | 120 | 3 | 50-60 |
| Trace Lab | 418 | PyroGC | GC | 120 | 2350 | 50-60 | L1 | 55 | none | |
| Need one quad box (has power) | MS | 120 | 1100 | 60 | LD5 | 30 | ||||
| Pyrolysis | 120 | 10 | LD5 | 30 | ||||||
| four extra | Toshiba 6KVA-to be disposed |
File details come from the government source that posted it. Updated .