This report summarizes the results of a load metering study conducted on Panel LD1. The study found that Phase A averaged 56.11 amps, Phase B averaged 45.23 amps, and Phase C averaged 49.90 amps over seven days. The panel averaged 17.48 KW of power usage and peaked at 27.18 KW.

The related federal contract opportunity is a solicitation from the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives seeking offers for the installation of laboratory dual in-line uninterrupted power supplies. The solicitation number is 15A00023R00000085. The report and solicitation appear to be related to an upcoming project to install backup power equipment in ATF laboratories.

View the file

Other files for this federal contract opportunity

Other files attached to Laboratory Dual In-Line Uninterrupted Power Supply Installation, newest first.
File Type Posted
Site Visit Q and A Part 2 - 15A00023R00000085.docx DOCX document
Attachment 1 - Statement of Work Update 2.docx DOCX document
FSL-A Chemistry Instrument Power Breakout.xlsx XLSX spreadsheet
Site Visit Q and A Part 1 - 15A00023R00000085.docx DOCX document
Attachment 1 - Statement of Work Update 1.docx DOCX document
Questions and Answers 1 - 15A00023R00000085.docx DOCX document
Site Visit Instructions - 15A00023R00000085.docx DOCX document
15A00023R00000085 - CO Signed.pdf PDF
Attachment 1 - Statement of Work.docx DOCX document
Attachment 2 - Quotation Instructions.docx DOCX document
Attachment 3 - Evaluation Criteria.docx DOCX document
Attachment 4 - Past Performance Survey.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

This report presents a summary of the results for the load metering done on Panel LD‐1. The meter was set up on the input of Panel LD‐1 to moniter load usage for 7 days. Phase A averaged 56.11 amps, Phase B averaged 45.23 amps, and Phase C averaged 49.90 amps. The Panel averaged 17.48 KW and peaked at a max of 27.18 KW.

Event #1 at 08/25/2023 10:00:29.000 AIrms Current Journal Trigger Normal To High

Timeplot

Min Max Avg A-BVrms 188.8 211.2 207.5 B-CVrms 188.9 212.5 208.5 C-AVrms 162.4 210.9 207.0 AIrms 38.20 172.8 56.11 BIrms 30.91 92.73 45.23 CIrms 32.49 130.8 49.90

V ol ts

A-B Vrms

V ol ts

B-C Vrms

V ol ts

C-A Vrms

A m ps

A Irms

A m ps

B Irms

A m ps

C Irms

10:00 08/25/2023

Friday

10:00 08/26/2023 Saturday

10:00 08/27/2023

Sunday

10:00 08/28/2023

Monday

10:00 08/29/2023

Tuesday

10:00 08/30/2023 Wednesday

10:00 08/31/2023

Thursday

10:00 09/01/2023

Friday

Timeplot

Min Max Avg TOTP(kW) 14.38 27.18 17.48

15.0

17.5

20.0

22.5

25.0

27.5 kW

TOT P(kW)

10:00 08/25/2023

Friday

10:00 08/26/2023 Saturday

10:00 08/27/2023

Sunday

10:00 08/28/2023

Monday

10:00 08/29/2023

Tuesday

10:00 08/30/2023 Wednesday

10:00 08/31/2023

Thursday

10:00

Timeplot

Min Max Avg AVrms 102.8 122.0 119.9 AIrms 38.20 172.8 56.11

10:00 08/25/2023

Friday

10:00 08/26/2023 Saturday

10:00 08/27/2023

Sunday

10:00 08/28/2023

Monday

10:00 08/29/2023

Tuesday

V ol ts

A Vrms

A m ps

A Irms

10:00 08/30/2023 Wednesday

10:00 08/31/2023

Thursday

10:00

Timeplot

Min Max Avg BVrms 111.3 122.2 119.9 BIrms 30.91 92.73 45.23

V ol ts

B Vrms

A m ps

B Irms

10:00 08/25/2023

Friday

10:00 08/26/2023 Saturday

10:00 08/27/2023

Sunday

10:00 08/28/2023

Monday

10:00 08/29/2023

Tuesday

10:00 08/30/2023 Wednesday

10:00 08/31/2023

Thursday

10:00

Timeplot

Min Max Avg CVrms 97.49 122.2 119.9 CIrms 32.49 130.8 49.90

V ol ts

C Vrms

A m ps

C Irms

10:00 08/25/2023

Friday

10:00 08/26/2023 Saturday

10:00 08/27/2023

Sunday

10:00 08/28/2023

Monday

10:00 08/29/2023

Tuesday

10:00 08/30/2023 Wednesday

10:00 08/31/2023

Thursday

10:00

ATF_Load Study_082523
ATF2_00
0 Phase to Phase
5 Active Power
ATF_Load Study_082523
1 Phase A
2 Phase B
3 Phase C

File details come from the government source that posted it. Updated .