1583808 AZ FLWO Replace Summit Dorm Bid Sch.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Smithsonian Astrophysical Observatory Fred Lawrence Whipple Observatory (FLWO) Dormitory Replacement
Solicitation number
33330225RF0010020
Issued by

About this file

This is a bid schedule Excel file for the Smithsonian Astrophysical Observatory's Fred Lawrence Whipple Observatory (FLWO) Dormitory Replacement project. The solicitation (33330225RF0010010) seeks a contractor to replace the Summit Dormitory at the FLWO base camp in Amado, Arizona, with a total project estimated to exceed $10 million. The project includes constructing a new dormitory addition connected to the existing Commons Building, installing building systems (HVAC, electrical, plumbing, fire suppression), adding a new fire water tank, installing metal roof assemblies, and performing commissioning work.

Key procurement details include a pre-proposal meeting on May 6, 2025, clarification questions due by May 27, 2025, and proposal submissions due June 23, 2025. The project has specific subcontracting goals of 40% with small businesses and 7% with service-disabled veteran-owned small businesses. The period of performance is 520 calendar days from the notice to proceed, with Davis-Bacon wage determinations AZ20250028 and AZ20250053 applying. Critical work elements include using construction management software, coordinating with ongoing site operations, working in a remote National Forest site, and scheduling around spotted owl mating season.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Blank bid summary

Title :ReplaceSummit DormPrepared by :
Facility :AZDate :
Project Number :1583808Company:
Base Bid
BASE BID: All work associated with replacing the Summit Dorm at FLWO per the specifications and drawings dated March 5, 2025.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0
Div. 2 Existing Conditions$ - 0$ - 0$ - 0
HAZMAT$ - 0$ - 0$ - 0
Div. 3 Concrete$ - 0$ - 0$ - 0
Div. 4 Masonry$ - 0$ - 0$ - 0
Div. 5 Metals$ - 0$ - 0$ - 0
Div. 6 Wood, Plastics and Composites$ - 0$ - 0$ - 0
Div. 7 Thermal and Moisture Prot.$ - 0$ - 0$ - 0
Div. 8 Openings$ - 0$ - 0$ - 0
Div. 9 Finishes$ - 0$ - 0$ - 0
Div. 10 Specialties$ - 0$ - 0$ - 0
Div. 11. Equipment$ - 0$ - 0$ - 0
Div. 12 Furnishings$ - 0$ - 0$ - 0
Div. 13 Special Construction$ - 0$ - 0$ - 0
Div. 14 Conveying Systems$ - 0$ - 0$ - 0
Div. 21 Fire Suppression$ - 0$ - 0$ - 0
Div. 22 Plumbing$ - 0$ - 0$ - 0
Div. 23 HVAC$ - 0$ - 0$ - 0
Div. 26 Electrical$ - 0$ - 0$ - 0
Div. 27 Communications$ - 0$ - 0$ - 0
Div. 28 Electronic Safety & Security$ - 0$ - 0$ - 0
Div. 31. Earthwork$ - 0$ - 0$ - 0
Div. 32 Exterior Improvements$ - 0$ - 0$ - 0
Div. 33 Utilities$ - 0$ - 0$ - 0

BASE BID SUBTOTAL

Overhead (indicate %)
Profit (indicate %)
Performance Bond (indicate %)
Tax (indicate %)

Total

BASE BIDTotal
Title :ReplaceSummit DormPrepared by :
Facility :AZDate :
Project Number :1583808Company:
OPTION 1
OPTION 1 : All work associated with demolitioning existing dormitory, site structures, and resoration of the site at FLWO per the specifications and drawings dated March 5, 2025.
DescriptionMaterialLaborEquipmentTotal
Div. 1 General Conditions$ - 0$ - 0$ - 0
Div. 2 Existing Conditions$ - 0$ - 0$ - 0
HAZMAT$ - 0$ - 0$ - 0
Div. 3 Concrete$ - 0$ - 0$ - 0
Div. 4 Masonry$ - 0$ - 0$ - 0
Div. 5 Metals$ - 0$ - 0$ - 0
Div. 6 Wood, Plastics and Composites$ - 0$ - 0$ - 0
Div. 7 Thermal and Moisture Prot.$ - 0$ - 0$ - 0
Div. 8 Openings$ - 0$ - 0$ - 0
Div. 9 Finishes$ - 0$ - 0$ - 0
Div. 10 Specialties$ - 0$ - 0$ - 0
Div. 11. Equipment$ - 0$ - 0$ - 0
Div. 12 Furnishings$ - 0$ - 0$ - 0
Div. 13 Special Construction$ - 0$ - 0$ - 0
Div. 14 Conveying Systems$ - 0$ - 0$ - 0
Div. 21 Fire Suppression$ - 0$ - 0$ - 0
Div. 22 Plumbing$ - 0$ - 0$ - 0
Div. 23 HVAC$ - 0$ - 0$ - 0
Div. 26 Electrical$ - 0$ - 0$ - 0
Div. 27 Communications$ - 0$ - 0$ - 0
Div. 28 Electronic Safety & Security$ - 0$ - 0$ - 0
Div. 31. Earthwork$ - 0$ - 0$ - 0
Div. 32 Exterior Improvements$ - 0$ - 0$ - 0
Div. 33 Utilities$ - 0$ - 0$ - 0

Option 1 SUBTOTAL

Overhead (indicate %)
Profit (indicate %)
Performance Bond (indicate %)
Tax (indicate %)

Total

Option 1

B-&P

Sheet1