15-04 Tailrace 2.pdf

PDF 2 MB Posted

Attached to
Abiquiu Hydroelectric Power Plant Crane Replacement
Solicitation number
IFB27-45
Issued by
Los Alamos County, New Mexico

About this file

This is a technical specification document for Los Alamos County's Abiquiu Hydroelectric Power Plant Crane Replacement project in New Mexico. The project scope involves the furnishing and installation of two new overhead hoist cranes to replace existing equipment at the hydroelectric facility located at the base of Abiquiu Dam. The existing cranes, each rated at approximately two tons, are inadequate for the lifting requirements necessary to operate the Pressure Relief Valve (PRV) gates that control water flow from the outlet works into the Rio Chama. Each new crane will be rated for five tons capacity, with one crane dedicated to each of the two gates, which are operated independently rather than simultaneously. The document provides technical specifications and design parameters for the crane replacement work.

The file contains detailed tailrace specifications and technical requirements for the crane installation at this critical water management infrastructure facility. No specific pricing terms, response dates, or award information is presented in this portion of the documentation. Additional contract details regarding bid submission deadlines, pricing structure, funding sources, and contract terms would be contained in the primary solicitation documents.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .