This is a project description document for the Abiquiu Hydroelectric Power Plant Crane Replacement project administered by Los Alamos County in New Mexico. The project involves the furnishing and installation of two new overhead hoist cranes at the Abiquiu Hydroelectric Power Plant, located at the base of the Abiquiu Dam where water flows into the Rio Chama in Northern New Mexico. The existing cranes, each rated at approximately two tons, are inadequate for the lifting requirements needed to operate the Pressure Relief Valve (PRV) gates at the facility. The project scope requires replacement of both existing cranes with two new five-ton rated cranes, with each crane providing lifting support for one of the two gates that are not lifted simultaneously. The document does not specify response dates, due dates, site visits, bidders' meetings, award dates, or contract term information.
The file does not contain information regarding pricing terms, set asides, incumbent contractors, funding sources, or other financial requirements. No cost estimates, budget allocations, or contract duration details are provided in this document.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .