14-05 Tailrace 3.pdf
PDF 1 MB Posted
- Solicitation number
- IFB27-45
- Issued by
- Los Alamos County, New Mexico
About this file
This is a project description document for Los Alamos County's Abiquiu Hydroelectric Power Plant Crane Replacement project located in Northern New Mexico. The project scope encompasses the furnishing and installation of two new overhead hoist cranes on a stationary structure at the Abiquiu Hydroelectric Power Plant, which operates at the base of the Abiquiu Dam where outlet works discharge water directly into the Rio Chama. The existing cranes, each rated at approximately two tons, are inadequate for the lifting requirements necessary to operate the Pressure Relief Valve (PRV) gates. The replacement project will install two new cranes, each rated for five tons capacity, with each crane providing lifting support for one of the two gates that are not lifted simultaneously. The document provides technical specifications and project details required for contractor evaluation and bidding purposes.
The document establishes the technical baseline for the crane replacement project at the hydroelectric facility. Contractors responding to this opportunity must be qualified to handle the furnishing and installation of industrial-grade overhead hoisting equipment suitable for critical infrastructure applications. The project involves replacing aging equipment at an operational power generation facility, requiring coordination with existing plant operations and adherence to safety and operational standards for hydroelectric infrastructure.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .