15-01510 Temporary Utilities.pdf

PDF 60 KB Posted

Attached to
Jenkintown Contract #26-06 - 2026 Sanitary Sewer Cleaning and Video Survey
Solicitation number
US.257471
Issued by
Montgomery County, Pennsylvania

About this file

This file appears to be a specification or cost estimate document related to temporary utilities for the Borough of Jenkintown's Contract #26-06, 2026 Sanitary Sewer Cleaning and Video Survey project. The project involves the cleaning and televising of sewer mains within the Borough of Jenkintown, Pennsylvania. Sealed bids were due by 11:00 AM on October 30, 2026, with a pre-bid meeting scheduled for 10:00 AM on October 16, 2026, at the Borough offices located at 700 Summit Avenue, Jenkintown, PA 19046. All project documents and drawings were available for inspection at the Borough offices and through PennBid (https://pennbid.bonfirehub.com). Each bidder was required to submit a certified check or bid bond payable to the Borough of Jenkintown in an amount not less than ten percent (10%) of the total bid, with bonds only accepted from companies licensed to conduct business in Pennsylvania. The contract term and any renewal options were not specified in the available documentation.

Prevailing wage rates as determined by the Commonwealth of Pennsylvania were required for all prime contractors and subcontractors. All bidders submitting proposals of $100,000 or greater were obligated to establish proof of competency and responsibility in accordance with Jenkintown Borough Ordinance No. 2008-2, the Model Responsible Contractor Ordinance. The estimated project cost was $100.00 for hard copy documents. Bids were required to be submitted unconditionally, and no bidder could withdraw their bid within sixty (60) days of the bid opening. No specific set-asides for women-owned, minority-owned, or other special classifications were identified in the available documentation.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PIPE LINING TEMPORARY UTILITIES

01510-1

SECTION 01510

TEMPORARY UTILITIES

PART 1 GENERAL

1.1 REQUIREMENTS INCLUDED

A. Furnish, install and maintain temporary utilities required for construction; remove on completion of Work.

1.2 RELATED REQUIREMENTS

A. Section 01010 - Contractors Work

1.3 REQUIREMENTS OF REGULATORY AGENCIES

A. Comply with Federal, State and local codes and regulations and with utility company requirements.

PART 2 PRODUCTS

2.1 MATERIALS, GENERAL

A. Materials may be new or used, but must: be adequate in capacity for the required usage, not create unsafe conditions, and not violate requirements of applicable codes and standards.

2.2 TEMPORARY WATER BY CONTRACTOR

A. Contractor shall make necessary arrangements to provide water for construction purposes.

Note: fire hydrants are not to be used by contractor for any purpose without permission from the Owner. Hydrants in the Borough are owned by AQUA America, Inc.

2.3 TEMPORARY SANITARY FACILITIES BY CONTRACTOR

A. Provide sanitary facilities in compliance with laws and regulations.

B. Service, clean and maintain facilities and enclosures.

PIPE LINING TEMPORARY UTILITIES

01510-2

PART 3 EXECUTION

3.1 GENERAL

A. Maintain and operate systems to assure continuous service.

B. Modify and extend systems as work progress requires.

3.2 REMOVAL

A. Completely remove temporary materials and equipment when their use is no longer required.

B. Clean and repair damage caused by temporary installations or use of temporary facilities.

C. Restore existing facilities used for temporary services to specified, or to original, condition.