About this file
This file is a specification section for Temporary Controls (Section 01560) from the Borough of Jenkintown's Contract #26-06 for 2026 Sanitary Sewer Cleaning and Video Survey in Jenkintown, Pennsylvania. The specification outlines the contractor's requirements to provide and maintain comprehensive temporary construction controls throughout the project duration. Key requirements include implementing dust control measures to minimize airborne particles and prevent dispersal into the atmosphere and equipment; establishing water control methods to prevent damage to the project site and adjoining properties, including operating hydraulic equipment for surface and subsurface water management; maintaining debris-free work areas through debris containment programs with periodic collection and disposal schedules; and implementing pollution control measures to prevent soil, water, and atmospheric contamination. The contractor must be prepared to address emergency spillage situations, excavate and dispose of contaminated materials offsite, and implement special safeguards to prevent harmful substances from entering public waterways or sanitary and storm sewers. The sealed bid submission deadline is 11:00 AM on October 30, 2026, with a mandatory pre-bid meeting scheduled for 10:00 AM on October 16, 2026, at the Borough offices located at 700 Summit Avenue, Jenkintown, Pennsylvania 19046.
Bid submission requires a certified check or bid bond equal to at least ten percent of the total bid amount, payable to the Borough of Jenkintown, with bonds limited to companies licensed in Pennsylvania. The project is subject to Pennsylvania Prevailing Wage Rate requirements, mandating that all prime contractors and subcontractors pay laborers and mechanics in accordance with the wage determination rates provided in the bid documents. Bidders submitting proposals of $100,000 or greater must establish proof of competency and responsibility as required by Jenkintown Borough Ordinance No. 2008-2. The estimated project cost is $100.00, though this figure likely represents a documentation fee rather than the actual contract value. All bid documents and project drawings are available through PennBid online at https://pennbid.bonfirehub.com, with hard copies optionally available for purchase. Bids must be submitted unconditionally, and bidders are prohibited from withdrawing bids within sixty days of submission.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIPE LINING TEMPORARY CONTROLS
01560-1
SECTION 01560
TEMPORARY CONTROLS
PART 1 GENERAL
1.1 REQUIREMENTS INCLUDED
A. Provide and maintain methods, equipment, and temporary construction as necessary to provide controls over environmental conditions at the construction site and related areas under Contractor's control; remove physical evidence of temporary facilities at completion of Work.
1.2 DUST CONTROL
A. Provide positive methods and apply dust control measures to minimize raising dust from construction operations, and provide positive means to prevent airborne dust from dispersing into the atmosphere and into mechanical equipment.
1.3 WATER CONTROL
A. Provide methods to control surface water to prevent damage to the Project, the site, or adjoining properties.
B. Provide, operate and maintain hydraulic equipment of adequate capacity to control surface and subsurface water.
C. Dispose of drainage water in a manner to prevent flooding, erosion, or other damage to any portion of the site or to adjoining areas.
1.4 DEBRIS CONTROL
A. Maintain all areas under Contractor's control, free of extraneous debris.
B. Initiate and maintain a specific program to prevent accumulation of debris at construction site, storage and parking areas.
1. Provide containers for deposit of debris.
2. Prohibit overloading of trucks to prevent spillages.
a. Provide periodic inspection of traffic areas to enforce requirements.
PIPE LINING TEMPORARY CONTROLS
01560-2
C. Schedule periodic collection and disposal of debris.
1. Provide additional collections and disposals of debris whenever the periodic schedule is inadequate to prevent accumulation.
1.5 POLLUTION CONTROL
A. Provide methods, means and facilities required to prevent contamination of soil, water or atmosphere by the discharge of noxious substances from construction operations.
B. Provide equipment and personnel, perform emergency measures required to contain any spillages and to remove contaminated soils or liquids.
1. Excavate and dispose of any contaminated earth offsite and replace with suitable compacted fill and topsoil.
C. Take special measures to prevent harmful substances from entering public waters.
1. Prevent disposal of wastes, effluents, chemicals, or other such substances adjacent to streams or in sanitary or storm sewers.
END OF SECTION