Sol_140R4025R0006_Amd_0004.pdf

PDF 176 KB Posted

Attached to
NGWSP REACH 1 PIPELINE REPAIRS
Solicitation number
140R4025R0006
Issued by

About this file

This document is a Solicitation Amendment (Amendment 0004) for the NGWSP Reach 1 Pipeline Repairs contract, issued by the Bureau of Reclamation's Upper Colorado Region. The amendment provides the second round of solicitation clarification questions and responses, updating Specification 33 11 12 - Steel Manways and Line Pipe, and adding the "2023-7-24 PNM River Station Pipeline CCTV Inspection MEMO CUI" to Section J of the solicitation. The period of performance is set from 06/24/2025 to 06/23/2026, and the amendment includes several new attachments such as updated specifications, drawings, geology documents, wage determinations, and project-related documentation. Contractors must acknowledge receipt of the amendment and can request certain video attachments by emailing the specified contract specialists.

View the file

Other files

File Type Posted
01_57_40_-_Pesticides_0008.pdf PDF
Sol_140R4025R0006_Amd_0008.pdf PDF
Sol_140R4025R0006_Amd_0007.pdf PDF
00_00_01_-_Specifications_03312025_0007.pdf PDF
Sol_140R4025R0006_Amd_0006.pdf PDF
Sol_140R4025R0006_Amd_0005.pdf PDF
33_11_12_-_Steel_Manways_and_Line_Pipe_004_0004.pdf PDF
RFP_Clarification_Questions_Round__2_0004.pdf PDF
Sol_140R4025R0006_Amd_0003.pdf PDF
Reach_1_Pipeline_repairs_site_tour_attendance_0003.pdf PDF
1695-D-62330-RD-25_1_(1)_0002.PDF PDF
52_00_00_-_Drawings_0002.pdf PDF
Sol_140R4025R0006_Amd_0002.pdf PDF
RFP_Clarification_Questions_Round__1_0002.pdf PDF
00_00_01_-_Specifications_02272025_0002.pdf PDF
1695-D-62318-RD_22X34_0002.pdf PDF
Sol_140R4025R0006_Amd_0001.pdf PDF
140R4025R0006_Attachment_1_-_00_00_01_-_Specifications_02072025.pdf PDF
140R4025R0006_Attachment_7_-_Experience_Form.docx DOCX document
140R4025R0006_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0006_Attachment_4_-_WD_NM20240040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0006_Attachment_2_-_00_00_02_Dwgs-B_NGWSP-Reach1Pipeline_11x17_02072025.pdf PDF
Sol_140R4025R0006.pdf PDF
Construction_Contract_Administration.docx DOCX document
140R4025R0006_Attachment_3_-_00_00_02A_GeologyDwgsAndLogs_NGWSP-Reach1Pipeline_11x17_12-09-2024.pdf PDF
140R4025R0006_Attachment_5_-_WD_NM20240046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0006_Reach_1_Repairs_7FEB25.pdf PDF
140R4025R0006_Attachment_8_-_Key_Personnel_Form.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R4025R0006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Salt Lake City UT 84138

R40

125 South State Street, Room 8100 Regional Office Upper Colorado Region Bureau of Reclamation

02/11/20250004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/11/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This solicitation amendment is issued to provide the second round of solicitation clarification questions and Reclamation responses (this is the last of the questions received). As a result of the responses, the following specification has been updated:

*33 11 12 - Steel Manways and Line Pipe 004.

Also, Amendment 0002 forgot to add "2023-7-24 PNM River Station Pipeline CCTV Inspection

MEMO CUI" to Section J. That is done on this amendment. The updates to Section J are highlighted.

Period of Performance: 06/24/2025 to 06/23/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ashton Jones

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation Document No.

140R4025R0006-0004

Document Title NGWSP Reach 1 Repairs

SECTION J – List of Attachments and Exhibits

Attachment Number Description Number of Pages Attachment #1 00 00 01 – Specifications 02072025 708

Attachment #1.1 (Amd 0002) 00 00 01 – Specifications 02272025 106 Attachment #1.2 (Amd 0002) 52 00 00 – Drawings 10 Attachment #1.3 (Amd 0004) 33 11 12 – Steel Manways and Line Pipe 004 18

Attachment #2 00 00 02_Dwgs-B_NGWSP- Reach1Pipeline_11x17_02072025

Attachment 2.1 (Amd 0002) 1695-D-62330-RD-25 1 (1) 1 Attachment #2.2 (Amd 0002) 1695-D-62318-RD 22X34 1

Attachment #3 00 00 02A_GeologyDwgsAndLogs_NGWSP- Reach1Pipeline_11x17_12-09-2024

Attachment #4 WD NM20240040 Heavy – San Juan County, NM

Attachment #5 WD NM20240046 Building – San Juan County, NM

Attachment #6 Past Performance Questionnaire 4 Attachment #7 Project Experience 1 Attachment #8 Key Personnel 2 Attachment #9 Construction Contract Administration 1

Attachment #10* PVI STA 108+00 DA Video Attachment #11* PVI STA 111+89.74 DA Video

Attachment #12* (Amd 0004) 2023-7-24 PNM River Station Pipeline CCTV Inspection MEMO CUI

*These attachments must be requested by email to the Contract Specialist at aloveless@usbr.gov and cc the Contracting Officer at ajones@usbr.gov.

mailto:aloveless@usbr.gov mailto:ajones@usbr.gov

Solicitation Document No.

140R4025R0006-0004

Document Title NGWSP Reach 1 Repairs

File details come from the government source that posted it. Updated .