00_00_01_-_Specifications_03312025_0007.pdf
PDF 5 MB Posted
- Attached to
- NGWSP REACH 1 PIPELINE REPAIRS
- Solicitation number
- 140R4025R0006
About this file
This document is a comprehensive table of contents for the Navajo-Gallup Water Supply Project's San Juan Lateral - Reach 1 Pipeline Improvements project, Amendment 007. The table of contents covers multiple technical specification divisions including general requirements, existing conditions, concrete, metals, thermal and moisture protection, openings, finishes, specialties, electrical, earthwork, exterior improvements, utilities, waterway and marine construction, and information available to offerors.
The document provides a detailed breakdown of specific technical sections and subsections, ranging from project management and coordination (01 31 19) to protected species (01 57 60) and BLM herbicides (51 00 70). Each division lists multiple technical specification sections with precise numerical codes, covering aspects such as surveying, safety procedures, environmental controls, concrete reinforcement, pipeline installations, cathodic protection systems, dust abatement, seeding, utility markers, and various construction-related technical requirements. The table of contents serves as a comprehensive guide to the technical specifications for the pipeline improvements project, indicating the extensive scope and technical complexity of the planned infrastructure work.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Navajo-Gallup Water Supply Project Amendment 007 San Juan Lateral – Reach 1 Pipeline Improvements Solicitation No.
Revised - Table of Contents
00 01 10 - 1
SECTION C - DESCRIPTION/SPECIFICATIONS
TABLE OF CONTENTS
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 12 10 Other Contracts 01 14 10 Use of Site 01 14 12 Work Restrictions and Limitations 01 31 19 Project Management and Coordination 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 46 20 Testing Agency Services 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 56 26 Temporary Fence 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 40 Pesticides 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 90 Preservation of Historical and Archeological Data 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents
DIVISION 02 – EXISTING CONDITIONS
02 41 16 Building Demolition 02 80 10 General Requirements for Hazardous Materials Abatement, Asbestos 02 82 20 Removal and Disposal of Asbestos Containing Materials 02 83 37 Disposal of Universal Waste
00 01 10 - 2
DIVISION 03 – CONCRETE
03 11 10 Concrete Forming 03 20 00 Concrete Reinforcement 03 30 00 Cast-In-Place Concrete 03 48 00 Precast Concrete Structures 03 62 20 Nonshrink Grout for Equipment and Metalwork 03 63 00 Epoxy Grout
DIVISION 05 – METALS
05 50 00 Metal Fabrications
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 21 20 Extruded Polystyrene Foam Insulation 07 21 50 Spray-Applied Polyurethane Foam Insulation 07 21 60 Insulation Jacket
DIVISION 08 – OPENINGS
08 31 25 Access Hatches
DIVISION 09 – FINISHES
09 96 20 Coatings
DIVISION 10 – SPECIALTIES
10 14 26 Utility Markers
DIVISION 26 – ELECTRICAL
26 42 00 Cathodic Protection Systems
DIVISION 31 – EARTHWORK
31 02 10 Water for Dust Abatement 31 02 30 Dust Palliative 31 03 33 Removal and Control of Water 31 11 00 Clearing and Grubbing 31 14 10 Topsoil Stripping, Stockpiling and Placement 31 23 02 Compacting Earth Materials 31 23 11 Earthwork for Structures 31 23 22 Pipe Trench Earthwork 31 23 39 Disposal of Excavated Materials
00 01 10 - 3
31 23 70 Controlled Low Strength Material (CLSM) 31 31 30 Soil Applied Herbicide
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 22 Asphalt Concrete Pavement 32 15 10 Gravel Surfacing 32 92 20 Seeding
DIVISION 33 – UTILITIES
33 11 12 Steel Manways and Line Pipe 33 12 10 Valves and Equipment for Line Pipe Installations
DIVISION 35 – WATERWAY AND MARINE CONSTRUCTION
35 21 95 Steel Manifold Piping 35 22 14 Valves and Equipment
DIVISION 51 – INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 10 Pipeline Inspection Report 51 00 20 Analytic Test Results 51 00 40 NTUA Markers 51 00 50 Electronic Media Release 51 00 60 Boundary Survey 51 00 70 BLM Herbicides 51 02 83 Hazardous Materials Survey and Analytical Results
DIVISION 52 – DRAWINGS
52 00 00 Drawings
DIVISION 53 – GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geologic Investigations 53 20 00 Records of Geologic and Subsurface Investigations
END OF CONTENTS
00 01 10 - 4
This page intentionally left blank.
Revised Submittals
01 33 00 - 1
SECTION 01 33 00
SUBMITTALS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. American Society of Mechanical Engineers (ASME)
1. ASME Y14.1-2020 Decimal Inch Drawing Sheet Size and
Format
B. National Institute of Building Sciences (NIBS)
1. NIBS NCS-2014 United States National CAD Standards, Version 6
1.03 DEFINITIONS
A. Days: Calendar days.
B. Required Submittal Number (RSN): Identifies items to be submitted together as a complete submittal.
C. Submittal Types, as listed in Table 01 33 00A – List of Submittals:
1. A – Action:
a. Government will respond as to adequacy of submittal.
b. Action submittals: Considered to be “shop drawings” within terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction.
2. I – Informational:
a. Government will acknowledge receipt of Informational submittals.
b. Government may reject an Informational submittal when submittal does not comply with contract. Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.
c. Informational submittals: Considered to be “shop drawings” within terms of the clause at FAR 52.236-21, Specifications and Drawings for Construction, except that approval by Government is not required.
01 33 00 - 2
1.04 SUBMITTAL REQUIREMENTS
A. In case of conflict between requirements of this section and requirements included elsewhere in these specifications, requirements included elsewhere take precedence.
B. General:
1. Prepare in English.
2. Label with contract number, title, and RSN.
3. Measurement units: US Customary Units.
4. Provide unique transmittal number for each submittal.
C. Drawings:
1. Minimum identification in title block:
a. Contract number and title.
b. Contractor’s or supplier’s title and drawing number.
c. Date.
2. Reserve 3- by 3-inch space next to title block for review stamps.
3. Print Size: D size (22- by 34-inches) as defined by ASME Y14.1.
4. Draw to scale using computer drafting or drafting equipment, unless otherwise specified:
a. Computer drafted drawings:
1) In accordance with NIBS NCS.
2) Electronic file format: Compatible with AutoCAD, Version 2018 or later.
3) Compile using “eTransmit” utility in AutoCAD.
b. Drawing prepared with drafting equipment, when allowed: Lettering shall be neat.
5. Drawings designated as “Government Format” in specifications:
a. Computer drafted.
b. Government will provide electronic AutoCAD format template.
c. Title block and sheet format:
1) As shown on Standard Drawing 40-D-7102.
2) Government will provide template.
3) Government will provide specific title block information to be used.
01 33 00 - 3
6. Final Drawings:
a. Computer drafted.
b. Government will provide electronic AutoCAD format template.
c. Show as-built changes, including revision dates, made during installation.
Indicate changes by clouding.
d. Electronic Files: On Reclamation issued USB Drive.
D. Product Data:
1. Mark manufacturer's data for commercial products or equipment, such as catalog cut sheets:
a. Identify manufacturer's name, type, model, size, and characteristics.
b. Illustrate that product or equipment meets requirements of specifications.
c. Mark items to be furnished in a manner that will photocopy (no highlighter).
d. Strike through items that do not apply.
E. Certifications:
1. Certifications by a registered professional: Signed and sealed by registered professional:
a. Not required for non-design work.
2. Manufacturer’s certifications: Signed by authorized representative of manufacturer.
F. Manuals:
1. Copies:
a. Printed copies: Bound and indexed.
b. Electronic copies: Searchable Adobe .pdf on Reclamation issued USB
Drive:
1) Bookmark longer files to assist in navigating file.
2) Electronic files may be submitted as separate parts of a manual.
After each separate electronic file is approved, compile each approved electronic file to assemble an entire manual which shall be consistent with final manual submittal.
2. Contents:
a. Parts identification lists, lists of special tools, and accessories.
b. Schematics and wiring diagrams.
c. Detailed instructions for installing, operating, lubricating, and maintaining equipment.
01 33 00 - 4
d. As-built drawings, photographs, and test records or reports if required by specifications.
G. Photographs:
1. Digital files: In .jpeg or similar format.
1.05 SUBMITTALS PROCEDURES
A. Submit only checked submittals. Submittals without evidence of Contractor's approval will be returned for resubmission.
B. Submit complete sets of required materials for each RSN as specified in “Submittals Required” column in Table 01 33 00A – List of Submittals. A complete set includes all listed items for RSNs with multiple parts.
C. Submit sets specified in “Sets to be sent:” columns in Table 01 33 00A – List of Submittals:
1. Submittals identified with “CDMS” in “Sets to be sent” column shall be submitted electronically in accordance with Section 01 31 30 – Contract Document Management System.
2. Submittals identified with “CDMS” in the top row of the “Sets to be sent” column require approval (Action) or acknowledgement (Informational) before sending required sets of hardcopy submittals.
3. Submittals identified with “CDMS” in the bottom row of the “Sets to be sent” column require submittal of hardcopy submittals before finalizing submittal in
CDMS.
D. Include the following information in transmittal letters:
1. Contract number and title.
2. RSN for each attached submittal.
3. Responsible code.
4. Number of sets for each RSN.
5. Identify submittal as initial or resubmittal.
E. Resubmittal of submittals not approved:
1. Mark changes such that they are readily identifiable and show revision date.
2. Describe reasons for significant changes in transmittal letter.
3. Resubmit returned submittals within 28 days after receiving the comments, unless otherwise directed.
4. Requirements for initial submittals apply to resubmittals.
01 33 00 - 5
1.06 REVIEW OF SUBMITTALS
A. Time Required:
1. Submittal review will require 28 days for review of each submittal or resubmittal, unless otherwise specified.
2. Time required for review of each submittal or resubmittal begins when complete sets of materials required for a particular RSN are received and extends through digital signature date stamp and upload date in CDMS.
B. Time in Excess of Specified:
1. CO may extend contract completion date to allow additional time for completing work affected by excess review time:
a. Time extension will be to extent that excess review time caused delay to contract completion date.
b. Time extension will not exceed time used in excess of specified number of days for review of submittals or resubmittals.
c. Concurrent days of excess review time resulting from review of two or more separate submittals or resubmittals will be counted only once in extending contract completion date.
2. No time extension will be allowed if Contractor fails to make complete action submittals in sequence and within time periods specified.
3. Adjustment for delay will be made only to extent that:
a. Approval was required under contract, and
b. Requests for approval were properly and timely submitted and were approved.
4. Adjustment will be subject to terms of paragraphs (b) and (c) of the clause at FAR
52.242-14, Suspension of Work; however, no such delay shall be deemed to be a “suspension order” as the term is used in that clause.
C. Return of Submittals:
1. Return of submittals will be by CDMS response or hard copy, as applicable.
2. Action Submittals: One set of submittals required for action will be returned either approved, partially approved, approved subject to identified changes and resubmit, or not approved:
a. Submittals that are not approved shall be revised and resubmitted.
b. Do not change designs without approval of CO after drawings, documentation, and technical data have been approved.
c. Exception: Schedules will be either accepted, partially accepted or not accepted.
01 33 00 - 6
3. Informational Submittals: Government will acknowledge Informational submittals:
a. Informational submittals will not be returned when they comply with specifications.
b. Informational submittals that do not comply with specifications may be returned for resubmittal or additional information may be requested.
1.07 HARD COPY OF TRANSMITTALS
A. Addresses for codes listed in Table 01 33 00A – List of Submittals:
1. Contracting Officer, Bureau of Reclamation, Attn: UC-840, 125 South State St., Room 6107, Salt Lake City, UT 84138-1147.
2. Construction Engineer, Bureau of Reclamation, 1235 La Plata Hwy, Farmington, New Mexico, 87401.
3. Technical Service Center, Bureau of Reclamation, Attn: 86-68160, PO Box
25007, Denver CO 80225-0007; Express Mail: Sixth and Kipling, Building 67, Room 152.
4. Navajo Tribal Utility Authority (NTUA), Attn: Operations Manager, PO Box 1749, Shiprock, NM 87420.
B. Send original transmittal letter with appropriate number of sets to office listed in “Responsible Code” column in Table 01 33 00A – List of Submittals:
1. Responsible codes starting with “86-6” are located in the Technical Service
Center. Send these submittals to the TSC address shown above.
C. Send copy of transmittal letter with appropriate number of sets to offices that are not the responsible code but show “No. of sets to be sent to” in Table 01 33 00A – List of Submittals.
D. Provide copy of transmittal letter on CDMS.
E. When “No. of sets to be sent to” is 0, send a copy of transmittal letter to that office.
F. Submittals required by the specifications, but not listed in Table 01 33 00A – List of Submittals:
1. Submit in accordance with this section.
2. Submit to CE, unless otherwise specified.
PART 2 PRODUCTS
Not Used
01 33 00 - 7
PART 3 EXECUTION
01 33 00 - 8
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO indicates Western Colorado Area Office, TSC indicates Technical Service Center, NTUA indicates the City of Gallup New Mexico.
RSN Clause or Section Title
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 63 days before use of
ROW
A CE CDMS
01 31 19-1 Project Management and Coordination
Written Summary Monthly once onsite construction begins
A CE CDMS
01 31 19-2 Project Management and Coordination
Off ROW Land Use Coordination
At least 6 months before use of OFF ROW land
I CE CDMS
01 31 19-3 Project Management and Coordination
Key Personnel Within 7 days after receipt of Notice of Award
A CE CDMS
01 31 19-4 Project Management and Coordination
Replacement of Key Personnel
A minimum of 2 business days prior to work being performed by new personnel
A CE CDMS
01 31 30-1 Contract Document Management System
Approval Data Within 21 days of Award
A CE 0 1 0 0
CDMS
01 31 30-2 Contract Document Management System
Final Data Within 14 days of completion of work
A CE 0 2 2 0
CDMS
01 32 10-1 Construction Program
Representative Information
Within 7 days after receipt of Notice of Award
I CE CDMS
01 32 10-2 Construction Program
Baseline Schedule Within 21 days after receipt of initial Notice to Proceed
A CE CDMS
01 32 10-3 Construction Program
Updated Schedule Reports
Monthly or with Progress Payments
A CE CDMS
01 33 00 - 9
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
01 32 10-4 Construction Program
Time Impact Analysis
Within 28 days after CO directs a contract change, with any proposal for a future modification, with any value engineering proposal, or with any request or claim for an equitable adjustment to the contract.
A CE CDMS
01 35 10-1 Safety Data Sheets Complete LHM and SDS
At least 14 days before jobsite delivery of hazardous material
I CE CDMS
01 35 10-2 Safety Data Sheets Updated LHM and
SDS
At least 14 days before jobsite delivery of hazardous material not previously listed
I CE CDMS
01 35 20-1 Safety and Health
(WBR 1452.223-
81)
Safety Program Submitted and accepted before commencing onsite work.
Submit at least 45 days before beginning onsite work. See Section
1.03 of RSHS
A CE CDMS
01 35 20-2 Safety and Health Job Hazard Analyses
At least 14 days before commencing onsite activities for each phase of work
A CE CDMS
01 35 20-3 Safety and Health Monthly Accident Summary Report
First day of each month.
01 33 00 - 10
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
01 35 30-1 Contractor’s Onsite Safety Personnel
Resumes At least 45 days before beginning onsite construction;
resubmit upon personnel change
A CE CDMS
01 35 30-2 Contractor’s Onsite Safety Personnel
Safety Inspection Reports
At least once each week
I CE CDMS
01 46 00-1 Quality Procedures Contractor Quality Control (QC) Plan
At least 45 days before beginning onsite work
A CE CDMS
01 46 00-2 Quality Procedures Contractor’s Daily Report
Weekly I CE CDMS
01 46 00-3 Quality Procedures Quality Control Supervisor (QCS) Resume
At least 45 days before beginning onsite work.
Resubmit upon personnel change.
A CE CDMS
01 46 00-4 Quality Procedures Contractor’s Quality Testing Plan
At least 45 days before beginning onsite work
A CE CDMS
01 46 00-5 Quality Procedures Summary of Monthly Test Results
Monthly, on or before 5th day of each month
A CE CDMS
01 46 20-1 Testing Agency Services
Testing Agencies Services Plan
At least 45 days before testing is required
A CE CDMS
01 55 00-1 Vehicular Access and Parking
Preconstruction Digital Recording
At least 21 days before beginning onsite work
A CE 0 1 0 0
01 55 00-2 Vehicular Access and Parking
Right of Way (ROW) Access Plan
At least 21 days before beginning onsite work.
A CE CDMS
01 55 00-3 Vehicular Access and Parking
Post-Construction and Post-Repair Digital Recording
At least 21 days before leaving site.
A CE 0 1 0 0
01 55 20-1 Traffic Control Traffic Control Plan
At least 70 days before affecting public traffic.
A CE CDMS
01 55 20-2 Traffic Control Approved NMDOT Permit(s)
At least 45 days before affecting public traffic.
01 33 00 - 11
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 45 days before start of onsite construction work
A CE CDMS
01 56 15-1 Protection of Existing Utilities
Utility Owner Acknowledgement
At least 45 days prior to submitting RSN 33 11 12-5
A CE CDMS
01 56 15-2 Protection of Existing Utilities
Utility Crossing Investigation
At least 45 days prior to submitting RSN 33 11 12-5 and at least 45 days prior to excavation
A CE CDMS
01 56 15-3 Protection of Existing Utilities
Work Plan within Utility Easements
With RSN 33 11 12-5 and at least 45 days prior to excavation
A CE CDMS
01 56 26-1 Temporary Fence Approval Data At least 45 days before start of onsite construction work
A CE CDMS
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 14 days before beginning onsite work
I WCAO CDMS
01 57 30-1 Water Pollution Control
Stormwater Pollution Prevention Plan
(SWPPP)
At least 28 days before start of onsite construction work
A WCAO CDMS
01 57 30-2 Water Pollution Control
Spill Prevention, Control, and Countermeasure (SPCC) Plan
At least 28 days before delivery or storage of oil
A WCAO CDMS
01 57 40-1 Pesticides Qualifications At least 45 days before beginning onsite work
A WCAO CDMS
01 57 40-2 Pesticides Pesticide Use Plan At least 45 days before application of first pesticide
A CE CDMS
01 57 50-1 Tree and Plant Protection
Protection Plan At least 45 days before beginning onsite work
01 33 00 - 12
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
01 57 90-1 Preservation of Historical and Archeological Data
Alternate Use Area or Borrow Area
At least 45 days before beginning offsite work, if commercial site;
if non-commercial site then at least 6-months prior to use of land
A CE CDMS
01 71 20-1 Surveying Surveying Plan Within 45 days after Notice to Proceed, and approved before beginning survey work
A CE CDMS
01 71 20-2 Surveying Resume(s) At least 45 days before beginning survey work;
resubmit upon personnel change
I CE CDMS
01 71 20-3 Surveying Accuracy Check Results
At least 45 days before beginning survey work
I CE CDMS
01 71 20-4 Surveying Completed and Reduced Survey Notes
Within 2 days of completing and reducing notes
I CE CDMS
01 71 20-5 Surveying Original Field Survey Books
Weekly I CE CDMS
01 71 20-6 Surveying Quantity Survey Notes and Computations
Accompanying progress payment requests
I CE CDMS
01 71 20-7 Surveying Workday's Survey Notes
At conclusion of workday if requested by Government
I CE CDMS
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 45 days before beginning onsite work
I CE CDMS
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of hazardous waste disposal
I CE CDMS
01 33 00 - 13
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume
At least 45 days before beginning environmental assessment
I CE CDMS
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment
Within 14 days of completion of work
I CE CDMS
01 78 30-1 Project Record Documents
Electronic Media Release Form
With request for Electronic Drawings
A CE CDMS
01 78 30-2 Project Record Documents
Progress As-Built Drawings
Monthly once onsite construction begins.
A CE CDMS
01 78 30-3 Project Record Documents
Final As-Built Drawings
Within 28 days of Government issued substantial completion of work
A CE CDMS
01 78 30-4 Project Record Documents
Draft O&M Manuals
Within 28 days of Government issued substantial completion of work
A CE 0 2 2 2
CDMS
01 78 30-5 Project Record Documents
Final Drawings Within 14 days of approval of
RSN 01 78 30-3
A CE 0 2 0 2
CDMS
01 78 30-6 Project Record Documents
Final O&M Manuals
Within 14 days of approval of
RSN 01 78 30-4
A CE 0 2 2 2
CDMS
02 41 16-1 Weathers Building Demolition
Utility Identification Plan
At least 35-days prior to locating utilities
A CE CDMS
02 41 16-2 Weathers Building Demolition
Building Demolition Plan
At least 35-days prior to building demolition
A CE CDMS
02 41 16-3 Weathers Building Demolition
Existing Utility Removal Plan
At least 35-days prior to removing utilities
01 33 00 - 14
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
02 41 16-4 Weathers Building Demolition
Notifications and Permits
Within 14-days of demolition
I CE CDMS
02 41 17-1 Shaw Building Demolition
Utility Identification Plan
At least 35-days prior to locating utilities
A CE CDMS
02 41 17-2 Shaw Building Demolition
Building Demolition Plan
At least 35-days prior to building demolition
A CE CDMS
02 41 17-3 Shaw Building Demolition
Existing Utility Removal Plan
At least 35-days prior to removing utilities
A CE CDMS
02 41 17-4 Shaw Building Demolition
Notifications and Permits
Within 14-days of demolition
I CE CDMS
02 80 10-1 General Requirements for Hazardous Materials, Asbestos
Qualifications At least 35-days prior to commencing asbestos removal work
A CE CDMS
02 80 10-2 General Requirements for Hazardous Materials, Asbestos
Worker Protection and Monitoring Plan
At least 35-days prior to commencing asbestos removal work
A CE CDMS
02 80 10-3 General Requirements for Hazardous Materials, Asbestos
Background Test Results
At least 35-days prior to commencing asbestos removal work
A CE CDMS
02 80 10-4 General Requirements for Hazardous Materials, Asbestos
Worker Exposure Test Results
At least 28-days after completion of asbestos removal work
I CE CDMS
02 80 10-5 General Requirements for Hazardous Materials, Asbestos
Visual Inspection and Final Air Clearance
At least 28-days after completion of asbestos removal work
01 33 00 - 15
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
02 82 20-1 Removal and Disposal of Asbestos Containing Materials
Certificates, Qualifications and Resumes
At least 35-days prior to removal of asbestos
A CE CDMS
02 82 20-2 Removal and Disposal of Asbestos Containing Materials
Asbestos Contractor’s History
At least 35-days prior to removal of asbestos
A CE CDMS
02 82 20-3 Removal and Disposal of Asbestos Containing Materials
Asbestos Hazard Abatement Plan
At least 35-days prior to removal of asbestos
A CE CDMS
02 82 20-4 Removal and Disposal of Asbestos Containing Materials
Notice of Asbestos Abatement
At least 35-days prior to removal of asbestos
A CE CDMS
02 82 20-5 Removal and Disposal of Asbestos Containing Materials
Bills of Lading Within 28-days of completing asbestos removal work
A CE CDMS
02 83 37-1 Removal and Disposal of Universal Waste
Qualifications At least 28-days prior to commencing building demolition
A CE CDMS
02 83 37-2 Removal and Disposal of Universal Waste
UW Handling and Disposal Plan
At least 28-days prior to commencing building demolition
A CE CDMS
02 83 37-3 Removal and Disposal of Universal Waste
Shipping Papers Within 28-days of completing building demolition
01 33 00 - 16
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
02 83 37-4 Removal and Disposal of Universal Waste
Disposal Certificate Within 28-days of completing building demolition
I CE CDMS
03 20 00-1 Concrete Reinforcement
Reinforcement Diagrams and Lists
At least 28 days prior to delivery of reinforcement
A CE CDMS
03 30 00-1 Cast-In Place Concrete
Approval Data At least 42-days before placing concrete
A TSC
86-68530
CDMS
03 30 00-2 Cast-In Place Concrete
Concrete Placement Schedule
At least 42-days before placing concrete
A CE CDMS
03 30 00-3 Cast-In Place Concrete
Certifications 42-days before placing concrete
A TSC
86-68530
CDMS
03 30 00-4 Cast-In Place Concrete
Test Reports Within 7-days of completing tests
A TSC
86-68530
CDMS
03 48 00-1 Precast Concrete Structures
Certificates At least 28-days before start of onsite construction work
A CE CDMS
03 48 00-2 Precast Concrete Structures
Shop Drawings At least 28-days before start of onsite construction work
A TSC
86-68140
CDMS
01 33 00 - 17
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
03 48 00-3 Precast Concrete Structures
Product Data At least 28-days before start of onsite construction work
A TSC
86-68530
CDMS
03 62 20-1 Nonshrink Grout for Equipment and Metalwork
Packaged Nonshrink Grout Data
At least 28-days before placing grout
A CE CDMS
03 63 00-1 Epoxy Grout Approval Data At least 42-days before placing grout
A CE CDMS
07 21 20-1 Extruded Polystyrene Foam Insulation
Approval Data At least 28-days before applying insulation
A CE CDMS
07 21 50-1 Spray-Applied Polyurethane Foam Insulation
Approval Data At least 28-days before applying insulation
A CE CDMS
07 21 50-2 Spray-Applied Polyurethane Foam Insulation
Instructions At least 28-days before applying insulation
A CE CDMS
07 21 50-3 Spray-Applied Polyurethane Foam Insulation
Documentation At least 28-days before applying insulation
A CE CDMS
07 21 60-1 Insulation Jacket Approval Data At least 28-days before purchasing jacket
01 33 00 - 18
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
07 21 60-2 Insulation Jacket Instructions At least 28-days before purchasing jacket
A CE CDMS
08 31 25-1 Access Hatches Product Data and Shop Drawings
At least 28-days before purchasing hatches
A TSC
86-68120
CDMS
09 96 20-1 Coatings Approval Data At least 42-days before beginning coating work
A TSC
86-68540
CDMS
09 96 20-2 Coatings Final Approval Data
At least 42-days before beginning coating work
A TSC
86-68540
CDMS
09 96 20-3 Coatings Paint Chip Samples At least 42-days before beginning coating work
A CE 0 1 1
09 96 20-4 Coatings Qualifications At least 42-days before beginning coating work
A TSC
86-68540
CDMS
09 96 20-5 Coatings Quality Control Plan
At least 42-days before beginning coating work
A TSC
86-68540
CDMS
09 96 20-6 Coatings Contractor Quality Testing Report
Weekly A TSC 86-68540
01 33 00 - 19
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
10 14 26-1 Utility Markers Utility Marker Plan At least 28-days prior to installation of utility markers
A CDMS
26 42 00-1 Cathodic Protection General Requirements
Certification and Data
28-days prior to installation of cathodic protection
A TSC 86-
68540
CDMS
26 42 00-1 Cathodic Protection General Requirements
Final Data Within 7-days of installation
A TSC 86-
68540
CDMS
31 02 10-1 Water for Dust Abatement
Meter Calibration At least 42-days before beginning onsite work
A CE CDMS
31 02 30-1 Dust Palliative Proposed Application Area for Dust Palliative
At least 42-days before beginning onsite work
A CE CDMS
31 03 33-1 Removal and Control of Water
Removal and Control of Water Plan
At least 28-days before beginning onsite work
A TSC
86-68312
CDMS
31 23 02-1 Compacting Earth Materials
Test Results Within 7-days after completion of tests
I CE CDMS
31 23 11-1 Earthwork for Structures
Geotechnical Engineering Analysis and Design of Structure Subgrade
At least 28-days before start of onsite construction work
01 33 00 - 20
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
31 23 11-2 Earthwork for Structures
Processing Plan for Soils under Structures
At least 28-days before start of onsite construction work
A CE CDMS
31 23 11-3 Earthwork for Structures
Test Results Within 28-days of testing
A CE CDMS
31 23 22-1 Pipe Trench Earthwork
Processing Plan At least 28-days before start of onsite construction work
A CE CDMS
31 23 22-2 Pipe Trench Earthwork
Soil Test Results Within 28-days of testing
A COR CDMS
31 23 70-1 Controlled Low Strength Materials
(CLSM)
Approval Data for
CLSM
At least 42-days before placing
A 86-68530 CDMS
31 23 70-2 Controlled Strength Materials (CLSM)
Cold Weather Protection Plan
At least 28-days prior to anticipated use
A CE CDMS
31 23 70-3 Controlled Low Strength Materials
(CLSM)
Quality Control Test Results
Within 7 days of testing
A CE CDMS
31 31 30-1 Soil-Applied Herbicide
Use Plan At least 28-days before placing
01 33 00 - 21
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
31 31 30-2 Soil-Applied Herbicide
Applier Certification
At least 28-days prior to beginning work
A CE CDMS
32 12 22-1 Asphalt Concrete Pavement
Job Mix Form8ula
(JMF)
At least 35-days prior to placing asphalt
A CE CDMS
32 15 10-1 Gravel Surfacing Gravel Certification
At least 35-days before placing surfacing
A CE CDMS
32 15 10-2 Gravel Surfacing Geotextile
Installation At least 28-days before placing surfacing
A CE CDMS
32 15 10-3 Gravel Surfacing Geotextile Certification
At least 28-days before placing surfacing
A CE CDMS
32 92 20-1 Seeding Seeding Plan At least 28-days before seeding
A CE CDMS
32 92 20-2 Seeding Certifications At least 28-days before seeding
A CE CDMS
33 11 12-1 Steel Manway and Line Pipe
Qualifications At least 42-days prior to fabrication or procurement
A CE CDMS
33 11 12-2 Steel Manway and Line Pipe
Existing Pipeline Video Inspection
Within 60-days of NTP
01 33 00 - 22
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
33 11 12-3 Steel Manway and Line Pipe
Existing Pipeline Hydrostatic Testing
At least 60-days before beginning repair work
A CE CDMS
33 11 12-4 Steel Manway and Line Pipe
Existing Pipeline Survey
Within 60-days of NTP
1 1 33 11 12-5 Steel Manway and
Line Pipe Existing Pipeline Non-destructive Assessment
Within 60-days of NTP
A CE CDMS
1 1
33 11 10-6 Steel Manway and Line Pipe
Work Plan At least 42-days prior to fabrication or procurement
A TSC 86-
68141
CDMS
33 11 12-7 Steel Manway and Line Pipe
Shop Drawings At least 42-days prior to fabrication or procurement
A TSC 86-
68141
CDMS
33 11 12-8 Steel Manway and Line Pipe
Filling and Testing Plan
At least 42-days prior to fabrication or procurement
A COR CDMS
33 11 12-9 Steel Manway and Line Pipe
Floatation Prevention Plan
At least 42-days prior to fabrication or procurement
A TSC 86-
68141
33 12 10-1 Valves and Equipment for Line Pipe Installations
Commercial Product Data
At least 42-days before fabrication or procurement
A TSC
86-68410
CDMS
33 12 10-2 Valves and Equipment for Line Pipe Installations
Service Manuals Within 14-days after installation
I TSC
86-68410
01 33 00 - 23
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
33 12 10-3 Valves and Equipment for Line Pipe Installations
Shop Testing Certifications and Reports
Within 14-days of testing
A TSC
86-68410
CDMS
35 21 95-1 Steel Manifold Piping
Shop Drawings At least 42-days before fabrication or procurement
A COR CDMS
35 21 95-2 Steel Manifold Piping
Commercial Products Data
At least 42-days before fabrication or procurement
A COR CDMS
35 21 95-3 Steel Manifold Piping
Pipe Removal Procedure
At least 42-days before removal
A COR CDMS
35 21 95-4 Steel Manifold Piping
Pipe Installation Procedure
At least 42-days before installation
A COR CDMS
35 21 95-5 Steel Manifold Piping
Final Data Within 14-days after installation
A COR CDMS
35 21 95-6 Steel Manifold Piping
Final Drawings Within 14-days after installation
A COR CDMS
35 22 14-1 Valves and Equipment
Plunger Valve Commercial Products Data
At most 15 days after notice to proceed
A COR CDMS
01 33 00 - 24
Table 01 33 00A – List of Submittals
* Submittal types: A – Action, I – Information ** CO indicates Contracting Officer, CE indicates Construction Engineer, WCAO
Submittals Required
Due Date or Delivery Time
Type
Respon-sible Code
No. of sets to be sent to:**
CO CE TSC NTUA
35 22 14-2 Valves and Equipment
Commercial Products Data
At least 42-days before fabrication or procurement
A COR CDMS
35 22 14-3 Valves and Equipment
Field Installation Procedures
At least 42-days before installation
A COR CDMS
35 22 14-4 Valves and Equipment
Shop Testing Certifications, Reports, and Data
Within 14 days of testing
A COR CDMS
35 22 14-5 Valves and Equipment
Plunger Valve Field Test Plan
At least 42-days before testing
A COR CDMS
35 22 15-6 Valves and Equipment
Service Manuals and Final Data
Within 14-days after installation
A COR CDMS
END OF SECTION
Revised Pesticides
01 57 40 - 1
SECTION 01 57 40
PESTICIDES
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
2. Contractor is responsible for damages resulting from use of pesticides under these specifications in accordance with the clause at FAR 52.236-7, Permits and Responsibilities.
1.02 DEFINITIONS
A. Pesticides: Includes herbicides, insecticides, fungicides, rodenticides, piscicides, avicides, surface disinfectants, animal repellants, and insect repellants.
1.03 REFERENCE STANDARDS
• Reclamation requires that the Contractor be
• Chemicals intended for use in the Project area must be reviewed and approved by Reclamation prior to application and must be legal and appropriate to the site-specific conditions where they are to be applied. A safety hazard analysis and the Material Safety Data Sheets (MSDS) for chemicals used must be submitted to the COR for each chemical with the chemical list at least 15 days prior to application of any chemical.
o Ideally a list of all herbicides that are intended for use and the approximate areas where they intend to be used should be provided as soon as possible after award.
Other notes:
• Moving forward, all NGWSP specs for herbicide usage should reference the BLM Approved Herbicide list.
• WCAO didn't think we needed to list specific herbicides in the specs; that could be determined by the applicator. The same applies to the concentration of herbicide applied, as this may vary by weed density, type, etc.
A.
B. Code of Federal Regulations (CFR)
1. 40 CFR Subchapter E Pesticide Programs
2. 40 CFR 156.10 Labeling Requirements for Pesticides and
Devices, Labeling Requirements
01 57 40 - 2
1.04 SUBMITTALS
A. Submit in accordance with Section 01 33 00 – Submittals.
B. RSN 01 57 90-1, Qualifications
1. Certifications
2. Resubmit within 10 days of personnel change.
C. RSN 01 57 40-2, Pesticide Use Plan:
1. Not required for insect repellant to be applied directly to clothing, or for small quantities of aerosol insecticide, such as fly and spider sprays, to be applied within or directly to offices or shop buildings.
2. Submit when chemicals or applications meet one or more of the following:
a. Chemicals categorized by USEPA for restricted use per 40 CFR
Subchapter E.
b. Chemicals applied to or that can reasonably be expected to contact water; except this requirement does not apply to Rodeo herbicide or copper sulfate used for control of noxious weeds.
c. Chemicals expected to endanger threatened animal or plant species.
3. For each pesticide:
a. Complete Reclamation Form 7-2615 “Pest Management/Integrated Pest Management Checklist” available from:
1) Bureau of Reclamation, Attn: 86-68200, P.O. Box 25007, Denver, CO 80225-0007.
b. SDS.
c. Complete label as defined by 40 CFR 156.10, containing the following:
1) Name, brand, or trademark product sold under.
2) Name and address of the producer or registrant.
3) Net contents.
4) Producing establishment’s number.
5) Ingredient statement.
6) Warning or precautionary statements.
7) Directions for use.
8) Use classification.
01 57 40 - 3
1.05 QUALIFICATIONS
A. Certified to apply appropriate weed and vegetation control measures in the project area. Possess, at a minimum, a commercial applicator’s license for the State of New Mexico to dispense herbicides in industrial-right-of-ways, rangeland settings, and in wetland areas for weed control work involving herbicide application.
1.06 DELIVERY, STORAGE, AND HANDLING
A. Comply with labeling and Safety Data Sheet (SDS) requirements when dealing with pesticides.
B. Keep records of pesticide types and amounts purchased, delivered, stored, mixed, and actually used, and disposal means of excess. Make records available for review by COR upon request.
PART 2 PRODUCTS
2.01 PESTICIDES
A. Allowed pesticides:
1. Refer to pesticides in Section 51 70 00 – BLM
2. Only those registered with EPA in compliance with Federal Environmental
Pesticide Control Act of 1972 and Pesticide Registration Improvement Act of 2003.
3. Not prohibited by State, Navajo Nation, or local agencies.
PART 3 EXECUTION
3.01 APPLICATION
A. Apply pesticides only as allowed by labeling.
B. In accordance with and only after approval of Pesticide Use Plan.
01 57 40 - 4
Revised - Protected Species
01 57 60 - 1
SECTION 01 57 60
PROTECTED SPECIES
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered in the Price Schedule for other items of work.
1.02 PROJECT CONDITIONS
A. Certain native plant and animal species in the State of New Mexico are protected under Federal, Tribal, and State laws. Government has ascertained that protected species and/or their habitats may exist in the areas to be disturbed by construction activities. These species include, but may not be limited to:
1. Migratory Birds.
2. Mesa Verde Cactus.
3. Raptors.
B. Federal legislation provides for protection of Threatened and Endangered Species, which might otherwise be lost due to alteration of terrain as a result of any Federal construction project.
C. Project is designed to comply with Environment Commitments of Navajo-Gallup Water Supply Project Final Environmental Impact Statement, Realignment of the Northern Portion of the San Juan Lateral Environmental Assessment, and Final Biological Opinion for the Navajo-Gallup Water Supply Project reissued by U.S. Fish and Wildlife Service on September 20, 2022.
D. Insert this section in subcontracts.
E. In accordance with Federal, Tribal, and State Law, Government may arrange for removal of protected species.
1. Cooperate with those performing such removal.
2. If these species are not removed, cooperate with and abide by protection plans developed by appropriate Federal, Tribal, and State entities to avoid damage to or disturbance of protected species.
F. Persons who, without permission contribute to the take of threatened and endangered species are subject to arrest and penalty of United States, Navajo Nation, and New Mexico laws.
1. Take: To harass, harm, pursue, hunt, shoot, wound, kill, trap, capture or collect, or to attempt to engage in any such conduct.
01 57 60 - 2
2. Harm: Includes significant habitat modification or degradation that results in death or injury to listed species by significantly impairing essential behavioral patterns, including breeding, feeding, or sheltering.
3. Harass: Intentional or negligent actions that create the likelihood of injury to listed species to such an extent as to significantly disrupt normal behavior patterns which include, but are not limited to, breeding, feeding or sheltering.
4. Incidental Take: Take that is incidental to, and not the purpose of, the carrying out of an otherwise lawful activity.
5. Offenders will be subject to United States, Navajo Nation, and New Mexico environmental protection laws and civil penalties.
1.03 SPECIAL REQUIREMENTS
A. Migratory Birds:
1. Nesting may occur in area between March 15th and August 15th:
a. Government will survey for nesting birds in vegetated areas to be disturbed. Evaluation shall be performed no more than 5 days prior to area disturbance.
b. Notify COR 10 days before disturbing an area.
c. Do not disturb a nesting pair of birds with eggs:
1) Avoid birds and modify construction activities as directed by COR.
B. Mesa Verde Cactus:
1. Mesa Verde Cactus is found directly adjacent to construction areas.
a. Government will monitor work in these areas.
b. Coordinate work with COR.
c. Government will conduct preconstruction surveys for Mesa Verde Cactus.
Evaluation shall be performed in blooming season in the year prior to construction.
1) Blooming may occur from April to May.
d. Notify COR before a minimum of 14 days prior to disturbing an area with enough time to schedule complete spring surveys.
1) Do not disturb potential Mesa Verde Cactus habitat prior to preconstruction surveys.
2) Modify construction activities as directed by COR.
e. Onsite Contractor personnel shall complete Mesa Verde Cactus awareness training prior to working in project area.
1) Government will provide training to inform onsite personnel of environmental requirements and expectations.
01 57 60 - 3
2) Training session will occur during preconstruction meeting or other mutually agreed upon time before initial groundbreaking takes place.
a) Duration: Approximately 1 hour.
b) Training will be recorded, and a digital copy of Mesa
Verde Cactus awareness training will be provided to Contractor.
3) Require onsite personnel to complete required Mesa Verde Cactus awareness training before being allowed to work in project area.
4) Maintain training records.
5) Onsite personnel added after completion of Government-provided training session shall view digital copy of training before being allowed to work in project area.
C. Raptors:
1. Raptor nesting may occur in the area from January 15th to July 15th:
a. Minimize disturbance to raptors.
b. Government will conduct raptor surveys prior to construction that is to begin between January 15th and July 15th. Evaluation shall be performed no more than 5 days prior to area disturbance. The survey will include all potential nesting habitat within specified buffer distances (0.25-mile to 0.625-mile, depending on the species) of the construction right- of-way.
2. Notify COR 10 days prior to construction to allow for raptor nest surveys.
3. Do not disturb an active raptor nest:
a. Government will notify Contractor of nest locations.
b. No construction will be allowed within the above months within 0.25-mile to 0.625-mile of active nests, depending on the species.
4. Raptor Safe Utility Poles:
a. All above ground utility poles shall conform to a design standard(s) that comply with the Raptor Electrocution Prevention Regulations RCS-43-08 published September 10, 2008. This is to avoid unintentional electrocution of raptors that may perch on the utility pole.
1.04 DISCOVERY OF RESOURCES
A. When Contractor or parties operating or associated with Contractor, in performance of this contract discover threatened and endangered species on ROW:
1. Immediately cease work within 50 feet of discovery location.
01 57 60 - 4
a. Place temporary safety fence in accordance with 01 56 32 –Temporary Safety fence to prevent disturbance until biologist can investigate to avoid inadvertent disturbance by construction activities.
2. Verbally notify CO and OGR within 2 hours, giving location and nature of findings.
a. Follow with written confirmation to CO within 12 hours.
3. Verbally notify Reclamation staff biologist within 2 hours.
a. Name of assigned staff biologist and telephone number will be provided at preconstruction meeting.
B. Do not disturb or damage threatened and endangered species discovered during construction activities. Provide cooperation and assistance to preserve findings for removal or other disposition by CO.
C. Government, in consultation with appropriate regulatory agencies upon discovery of threatened and endangered species, will manage required removal/replacement planting in accordance with consultation commitments.
1. When discovery mitigation has been completed, CO will notify Contractor that work can resume in discovery area.
2. Do not resume work in area of discovery until receipt of written notice to proceed from CO.
D. Where appropriate by reason of discovery, CO may order delays in time of performance or changes in work or both. When such delays or changes are ordered, an equitable adjustment will be made in the contract in accordance with applicable clauses of the contract.
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 MESA VERDE CACTUS MONITORING AREA
A. Provide 48-hour notice to OGR prior to approaching or entering the Mesa Verde Cactus Monitoring Area for construction activities.
1. Coordinate with the Government for a biological monitor for new ground disturbing construction activities within the required monitoring area identified on the drawings or other areas as directed by COR.
B. Erect Mesa Verde Cactus Monitoring Area Boundary Fence.
01 57 60 - 5
1. From Station 279+73 to 284+23.
2. Government Biologist will be on site during fence installation.
a. COR will coordinate Government Biologists attendance.
b. Notify COR 7 days prior to fence installation.
3. Refer to Section 01 56 32 – Temporary Safety Fence.
4. Maintain fence throughout its installation.
5. Remove fencing after reseeding.
01 57 60 - 6
New - BLM Herbicides
51 00 70 - 1
SECTION 51 00 40
BLM HERBICIDES
PART 1 GENERAL
51 00 70 - 2
51 00 70 - 3
51 00 70 - 4
51 00 70 - 5
51 00 70 - 6
51 00 70 - 7
51 00 70 - 8
51 00 70 - 9
51 00 70 - 10
51 00 70 - 11
PART 2 PRODUCTS
51 00 70 - 12
Not Used
PART 3 EXECUTION
| 00 01 10 - Table of Contents |
| 01 33 00 - Submittals |
| 01 57 40 - Pesticides |
| 01 57 60 - Protected Species |
| 51 00 70 - BLM Herbicides |
File details come from the government source that posted it. Updated .