This is a specification section detailing drawing requirements for the Navajo-Gallup Water Supply Project (NGWSP) San Juan Lateral - Reach 1 Pipeline Improvements project, Amendment 002. The section provides comprehensive lists and hierarchical organization of drawings required for the project, including general drawings, civil drawings, and information drawings from the Public Service Utility of New Mexico (PNM).

The document includes two detailed tables: Table 52 00 00A listing 70 drawings organized by category (General, Civil, Information Drawings, and Standard Drawings) and Table 52 00 00B presenting drawings in numerical order. Key drawings cover pipeline improvements, location maps, trench details, contractor use areas, valve assemblies, plunger vault designs, and various civil engineering details. The section establishes drawing precedence, with written specifications taking precedence over drawings in case of discrepancies, and requires contractors to inform the Contracting Officer of any discovered discrepancies. Several drawings related to connection vaults are marked as "Not Constructed" and some 4" waterline drawings are noted as "Not Relocated."

View the file

Other files

File Type Posted
01_57_40_-_Pesticides_0008.pdf PDF
Sol_140R4025R0006_Amd_0008.pdf PDF
Sol_140R4025R0006_Amd_0007.pdf PDF
00_00_01_-_Specifications_03312025_0007.pdf PDF
Sol_140R4025R0006_Amd_0006.pdf PDF
Sol_140R4025R0006_Amd_0005.pdf PDF
33_11_12_-_Steel_Manways_and_Line_Pipe_004_0004.pdf PDF
Sol_140R4025R0006_Amd_0004.pdf PDF
RFP_Clarification_Questions_Round__2_0004.pdf PDF
Sol_140R4025R0006_Amd_0003.pdf PDF
Reach_1_Pipeline_repairs_site_tour_attendance_0003.pdf PDF
1695-D-62330-RD-25_1_(1)_0002.PDF PDF
Sol_140R4025R0006_Amd_0002.pdf PDF
RFP_Clarification_Questions_Round__1_0002.pdf PDF
00_00_01_-_Specifications_02272025_0002.pdf PDF
1695-D-62318-RD_22X34_0002.pdf PDF
Sol_140R4025R0006_Amd_0001.pdf PDF
140R4025R0006_Attachment_1_-_00_00_01_-_Specifications_02072025.pdf PDF
140R4025R0006_Attachment_7_-_Experience_Form.docx DOCX document
140R4025R0006_Attachment_6_-_Past_Performance_Questionnaire.pdf PDF
140R4025R0006_Attachment_4_-_WD_NM20240040_Heavy_-_San_Juan_County__NM.pdf PDF
140R4025R0006_Attachment_2_-_00_00_02_Dwgs-B_NGWSP-Reach1Pipeline_11x17_02072025.pdf PDF
Sol_140R4025R0006.pdf PDF
Construction_Contract_Administration.docx DOCX document
140R4025R0006_Attachment_3_-_00_00_02A_GeologyDwgsAndLogs_NGWSP-Reach1Pipeline_11x17_12-09-2024.pdf PDF
140R4025R0006_Attachment_5_-_WD_NM20240046_Building_-_San_Juan_County__NM.pdf PDF
140R4025R0006_Reach_1_Repairs_7FEB25.pdf PDF
140R4025R0006_Attachment_8_-_Key_Personnel_Form.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Navajo-Gallup Water Supply Project Amendment 002 San Juan Lateral – Reach 1 Pipeline Improvements Solicitation No.

Revised Drawings

52 00 00 - 1

SECTION 52 00 00

DRAWINGS

PART 1 GENERAL

1.01 DISCREPANCIES, ERRORS, OR OMISSIONS

A. Inform CO of discrepancies discovered on drawings in accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction.

B. In accordance with clause at FAR 52.236-21, Specifications and Drawings for Construction, in case of discrepancies, written specifications take precedence over drawings unless otherwise specified.

1.02 PROJECT CONDITIONS

A. Where there are differences as determined by CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.

1.03 SPECIFICATION DRAWINGS

A. Some drawings show details of fabrication or other details and specifications which are not a part of work under this contract. Disregard specifications and details shown on these drawings which are not applicable to work under this contract.

B. Reference drawings referred to on specification drawings and not considered necessary for contract purposes are not included in specifications.

C. Parts of work for which dimensions are not shown have been drawn to scale as nearly too final dimensions as possible before purchase of machinery or equipment and development of final general and detailed designs.

1.04 TYPICAL DRAWINGS

A. Typical drawings show installations and details of construction which are similar to or approximate to those that are part of work under these specifications. Dimensions and details shown on typical drawings may vary from those shown on construction drawings to be furnished after award of contract.

B. Use typical drawings for bidding purposes only.

1.05 ADDITIONAL OR REVISED DRAWINGS

A. Except as provided in these specifications for drawings to be furnished by Contractor, specifications drawings will be supplemented by additional or revised general and detail drawings as necessary or desirable as work progresses.

52 00 00 - 2

B. Do not perform work without proper drawings and instructions.

C. Additional or revised general and detail drawings will show dimensions and details necessary for construction purposes more completely than are shown on these specifications drawings for features of work and for equipment or metalwork not yet purchased.

D. Perform work in accordance with additional general and detail drawings or revisions at applicable prices offered in Price Schedule for such work.

1.06 INFORMATION DRAWINGS

A. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract.

These drawings do not show work to be performed under this contract.

B. If there are differences as determined by the CO between details and dimensions shown on these drawings and those of existing features at jobsite, use details and dimensions of existing features at jobsite.

1.07 STANDARD DRAWINGS

A. Standard drawings may show details which are not a part of work under this contract.

Disregard details shown on these drawings which are not applicable to work under this contract.

1.08 LIST OF DRAWINGS

A. Drawings listed in Table 52 00 00A – List of Drawings, are made a part of Section C – Description/Specifications.

1.09 DRAWING NUMBERS IN NUMERICAL ORDER

A. Specification drawings are listed in numerical order in Table 52 00 00B – Drawings in Numerical Order.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

52 00 00 - 3

Table 52 00 00A – List of Drawings

Sheet No.

Drawing No. Title

General:

1 1695-D-62307 San Juan Lateral – Reach 1 – Pipeline Improvements – Location Maps

2 1695-D-62308 San Juan Lateral – Reach 1 – Pipeline Improvements – Key, Location, and Site Map – General Notes

Civil:

San Juan Lateral – Reach 1 – Line Pipe

3 1695-D-62309 Details – Typical Trench Details

4 1695-D-61850 Plan – Appurtenance Locations

5 1695-D-62310 Contractor Use Area – CR 6700

6 1695-D-62311 Contractor Use Area – CR 6800

7 1695-D-62312 Contractor Use Area – HWY 64

8 1695-D-62313 Details – Air Valve and Blowoff

9 1695-D-62314 Details – Manway Access - Assembly

10 1695-D-62315 Temporary Bypass Tank Connection - Details

11 1695-D-62316 Standpipe Assembly - Details

12 1695-D-62317 Plunger Valve Location and Access Road – Plan and Profile

12A 1695-D-62318 Plunger Valve Vault – Grading Plan

13 1695-D-62319 Plunger Vault – Design Data, Loads, and Concrete Outline and Reinforcement – General Notes

14 1695-D-62320 Plunger Vault – Concrete Outlines and Miscellaneous Metalwork – Plans and Sections – Sheet 1 of 4

15 1695-D-62321 San Juan Lateral – Reach 1 – Line Pipe – Plunger Vault – Reinforcement – Plans and Sections – Sheet 3 of 4

16 1695-D-62322 San Juan Lateral – Reach 1 – Line Pipe – Plunger Vault – Details – Sheet 4 of 4

17 1695-D-62323 Plunger Valve – Vault Assembly

18 1695-D-62324 Plunger Valve – Assembly and Steel Pipe – Plan – Sheet 1

52 00 00 - 4

Table 52 00 00A – List of Drawings

Sheet No.

Drawing No. Title

19 1695-D-62325 Plunger Valve – Assembly and Steel Pipe – Section and Details – Sheet 2

20 1695-D-62326 P&ID – Plunger Valve – Assembly Symbols & Abbreviations -Sheet 1

21 1695-D-62327 P&ID – Plunger Valve – Assembly Symbols & Abbreviations – Sheet 2

22 1695-D-62328 P&ID – Plunger Valve – Assembly Symbols & Abbreviations – Sheet 3

23 1695-D-62329 Additional Contractor Use Area – Weathers Parcel

24 1695-D-62330 Additional Contractor Use Area – Shaw Parcel

25 1695-D-62332 Corrosion Protection – Bond Cable Details

Information Drawings: The Public Service Utility of New Mexico (PNM)

26 01-G-01 PNM River Station Pipeline – December 2010 – Sheet 1 of 40

27 01-G-02 PNM River Station Pipeline – General Notes – Sheet 2 of 40

28 01-G-03 PNM River Station Pipeline – Overall Site Map – Utility Contacts – Sheet 3 of 40

29 01-G-04 PNM River Station Pipeline – Survey Control Sheet – Sheet

30 10-G-01 PNM River Station Pipeline – Hydraulic Profile – Sheet 5 of 40

31 10-G-02 PNM River Station Pipeline – Alignment Key Map – Sheet

32 PNM River Station Pipeline – Discharge Header Detail – Sheet No. 7A of 40

33 PNM River Station Pipeline – NMDOT Pipe Culvert Headwalls Serial – Sheet 7B of 40

34 10-C-01 PNM River Station Pipeline – Plan and Profile – SJGS Lake to CR6800 – Sta 100+00 to Sta 112+00 – Sheet 7R of 40

35 10-C-02 PNM River Station Pipeline – Plan and Profile – SJGS Lake to CR6800 – Sta 112+00 to Sta 124+00 – Sheet 8 of 40

52 00 00 - 5

Table 52 00 00A – List of Drawings

Sheet No.

Drawing No. Title

36 10-C-03 PNM River Station Pipeline – Plan and Profile – SJGS Lake to CR6800 – Sta 124+00 to Sta 136+00 – Sheet 9 of 40

37 10-C-04 PNM River Station Pipeline – Plan and Profile – CR6800 – Sta 136+00 to 148+00 – Sheet 10 of 40

38 10-C-05 PNM River Station Pipeline – Plan and Profile – CR6800 – Sta 148+00 to Sta 160+00 – Sheet 11 of 40

39 10-C-06 PNM River Station Pipeline – Plan and Profile – CR6800 – Sta 160+00 to Sta 172+00 – Sheet 12 of 40

40 10-C-07 PNM River Station Pipeline – Plan and Profile – CR6800 – Sta 172+00 to Sta 184+00 – Sheet 13 of 40

41 10-C-08 PNM River Station Pipeline – Plan and Profile – CR6800 – Sta 184+00 to Sta 196+00 – Sheet 14 of 40

42 10-C-09 PNM River Station Pipeline – Plan and Profile – CR6800 – Sta 196+00 to Sta 208+00 – Sheet 15 of 40

43 10-C-10 PNM River Station Pipeline – Plan and Profile – CR6800/US64 – Sta 208+00 to Sta 220+00 – Sheet 16 of 40

44 10-C-11 PNM River Station Pipeline – Plan and Profile – Private Easement – Sta 220+00 to Sta 232+00 – Sheet 17 of 40

45 10-C-12 PNM River Station Pipeline – Plan and Profile – Private Easement – Sta 232+00 to Sta 244+00 – Sheet 18 of 40

46 10-C-13 PNM River Station Pipeline – Plan and Profile – Marcy Valencia’s Property/CR6700 – Sta 244+00 to Sta 256+00 – Sheet 19 of 40

47 10-C-14 PNM River Station Pipeline – Plan and Profile – CR6700 – Sta 256+00 to Sta 268+00 – Sheet 20 of 40

48 10-C-15 PNM River Station Pipeline – Plan and Profile – CR6700 – Sta 268+00 to Sta 280+00 – Sheet 21 of 40

49 10-C-16 PNM River Station Pipeline – Plan and Profile – CR6700 – Sta 280+00 to Sta 292+00 – Sheet 22 of 40

50 10-C-17 PNM River Station Pipeline – Plan and Profile – CR6700 – Sta 292+00 to Sta 304+00 – Sheet 23 of 40

51 10-C-18 PNM River Station Pipeline – Plan and Profile – CR6700 – Sta 304+00 to Sta 316+00 – Sheet 24 of 40

52 00 00 - 6

Table 52 00 00A – List of Drawings

Sheet No.

Drawing No. Title

52 10-C-19 PNM River Station Pipeline – Plan and Profile – CR6700 – Sta 316+00 to 328+00 – Sheet 25 of 40

53 10-C-20 PNM River Station Pipeline – Plan and Profile – US64 – Sta 328+00 to Sta 340+00 – Sheet 26 of 40

54 10-C-21 PNM River Station Pipeline – Plan and Profile – US64 to PNM River Pump Station – Sta 340+00 to Sta 350+18 – Sheet 27R of 40

55 20-C-01 PNM River Station Pipeline – 4” Relocation Key Map – Sheet 28 of 40 (Marked with “X” – 4” Waterline Not Relocated)

56 20-C-02 PNM River Station Pipeline – 4” WL Plan and Profile – CR6800 – Sta 1+00 to Sta 12+00 – Sheet 29 of 40 (Marked with “X” – 4” Waterline Not Relocated)

57 20-C-03 PNM River Station Pipeline – 4” WL Plan and Profile – CR6800 – Sta 12+00 to Sta 14+55 – Sheet 30 of 40 (Marked with “X” – 4” Waterline Not Relocated)

58 10-TC-01 PNM River Station Pipeline – Traffic Control Plan – Waterline Crossing – Sheet 31 of 40

59 10-TC-02 PNM River Station Pipeline – Suggested Traffic Control Plan – Waterline Construction – Sheet 32 of 40

60 10-ES-01 PNM River Station Pipeline – Temporary Erosion and Sediment Control Plan – Sheet 33 of 40

61 10-D-01 PNM River Station Pipeline – Civil Details – Sheet 34 of 40

62 10-D-02 PNM River Station Pipeline – Civil Details – Sheet 35 of 40

63 10-D-03 PNM River Station Pipeline – Connection Vault – Sheet 36 of 40 (Marked with “X” – Not Constructed)

64 10-D-04 PNM River Station Pipeline – CR6700 Cross Sections – Sheet 37 of 40

65 10-D-05 PNM River Station Pipeline – Flow Meter Vault – Sheet 38 of 40

66 10-S-01 PNM River Station Pipeline – Connection Vault – Lid and Foundation Plan – Sheet 39 of 40 (Marked with “X” – Not Constructed)

52 00 00 - 7

Table 52 00 00A – List of Drawings

Sheet No.

Drawing No. Title

67 10-S-02 PNM River Station Pipeline – Connection Vault – Sections and Details – Sheet 40 of 40 (Marked with “X” – Not Constructed)

Standard Drawings:

68 40-D-6137 Manholes – Class 150 LB. and 300 LB. – Plate Steel

69 40-D-6234 Standard Nameplates

70 40-D-60003 Concrete Outline and Reinforcement – General Notes for Concrete Outline and Reinforcement

Table 52 00 00B – Drawings in Numerical Order

Drawing No. Sheet No.

1695-D-

1695-D-60268

1695-D-61850 4

1695-D-62307 1

1695-D-62308 2

1695-D-62309 3

1695-D-62310 5

1695-D-62311 6

1695-D-62312 7

1695-D-62313 8

1695-D-62314 9

1695-D-62315 10

1695-D-62316 11

1695-D-62317 12

1695-D-62319 13

1695-D-62320 14

52 00 00 - 8

Table 52 00 00B – Drawings in Numerical Order

Drawing No. Sheet No.

1695-D-62321 15

1695-D-62322 16

1695-D-62323 17

1695-D-62324 18

1695-D-62325 19

1695-D-62326 20

1695-D-62327 21

1695-D-62328 22

1695-D-62329 23

1695-D-62330 24

1695-D-62332 25

Information Drawings

01-G-

01-G-01 26

01-G-02 27

01-G-03 28

01-G-04 29

10-G-

10-G-01 30

10-G-02 31

Sheet 7A of 40 32

Sheet 7B of 40 33

10-C-

10-C-01 34

10-C-02 35

10-C-03 36

10-C-04 37

52 00 00 - 9

Table 52 00 00B – Drawings in Numerical Order

Drawing No. Sheet No.

10-C-05 38

10-C-06 39

10-C-07 40

10-C-08 41

10-C-09 42

10-C-10 43

10-C-11 44

10-C-12 45

10-C-13 46

10-C-14 47

10-C-15 48

10-C-16 49

10-C-17 50

10-C-18 51

10-C-19 52

10-C-20 53

10-C-21 54

20-C-

20-C-01 55

20-C-02 56

20-C-03 57

10-D-

10-D-01 61

10-D-02 62

10-D-03 63

10-D-04 64

10-D-05 65

52 00 00 - 10

Table 52 00 00B – Drawings in Numerical Order

Drawing No. Sheet No.

10-S-

10-S-01 66

10-S-02 67

10-ES-

10-ES-01 60

10-TC-

10-TC-01 58

10-TC-02 59

40-D-

40-D-6137 68

40-D-6234 69

40-D-60003 70

END OF SECTION