Schedule B Price structure._0003.pdf
PDF 58 KB Posted
- Attached to
- BM & CRY - STATION SERVICE, BUS, AND UNI
- Solicitation number
- 140R4020R0006
About this file
This document contains two price schedules for a federal solicitation seeking bus and unit breaker replacement services at two hydroelectric power plants. Price Schedule A covers work at the Crystal Powerplant and includes nine contract line items for mobilization, drawings, commissioning, demolition, secondary substation, control boards, switchgear, unit switchgear, and cable bus. Price Schedule B covers similar work at the Blue Mesa Powerplant and includes eight contract line items. Offerors are to provide unit prices for each line item. The solicitation is being conducted by the Bureau of Reclamation under number 140R4020R0006 for work at the Colorado River Storage Project in Colorado. The response is due by the date specified in the solicitation. Award will be made on both price schedules collectively to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the government.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blue Mesa and Crystal Station Service, Bus, and Unit Breaker Replacement Colorado River Storage Project, Colorado Solicitation No. 140R4020R0006
Price Schedule B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
BLUE MESA AND CRYSTAL
STATION SERVICE, BUS, AND UNIT BREAKER REPLACEMENT
COLORADO RIVER STORAGE PROJECT, COLORADO
B.1 PRICE SCHEDULES
(a) Offers will be considered for award on the following Price Schedules, but no offer will be considered for award on only a part of the Price Schedules.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(d) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE A, CRYSTAL POWERPLANT
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
A-1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
A-2 01 33 26 Electrical Drawings and Data
For the lump sum of $
(minimum of $100,000)
Colorado River Storage Project, Colorado Solicitation No. 140R4020R0006
Price Schedule B - 2
PRICE SCHEDULE A, CRYSTAL POWERPLANT
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
A-3 01 91 13 Commissioning For the lump sum of $
A-4 26 05 04 Demolition and Removal of Electrical Equipment, Cable, and Bus
For the lump sum of $
A-5 26 16 14 Secondary Unit Substation For the lump sum of $
A-6 26 24 35 Control Boards For the lump sum of $
A-7 33 77 21 Metal-Enclosed Switchgear For the lump sum of $
A-8 48 19 20 Unit Switchgear For the lump sum of $
A-9 48 19 45 Cable Bus For the lump sum of $
TOTAL FOR PRICE SCHEDULE A $_________________
PRICE SCHEDULE B, BLUE MESA POWERPLANT
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
B-1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
B-2 01 33 26 Electrical Drawings and Data
For the lump sum of $
(minimum of $100,000)
B-3 01 91 13 Commissioning For the lump sum of $
B-4 26 05 04 Demolition and Removal of Electrical Equipment, Cable, and Bus
For the lump sum of $
B-5 26 16 14 Secondary Unit Substation For the lump sum of $
B-6 26 16 43 15-Kilovolt Nonsegregated- Phase Bus
For the lump sum of $
Colorado River Storage Project, Colorado Solicitation No. 140R4020R0006
Price Schedule B - 3
PRICE SCHEDULE B, BLUE MESA POWERPLANT
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
B-7 26 24 35 Control Boards For the lump sum of $
B-8 48 19 20 Unit Switchgear For the lump sum of $
TOTAL FOR PRICE SCHEDULE B $_________________
TOTAL FOR PRICE SCHEDULES A AND B $_________________
END OF SUPPLIES OR SERVICES AND PRICES/COSTS
Colorado River Storage Project, Colorado Solicitation No. 140R4020R0006
Price Schedule B - 4
This page intentionally left blank.