Sol_140R3024R0019_Amd_0004.pdf

PDF 87 KB Posted

Attached to
Transformer Supply IDIQ (Hoover Dam)
Solicitation number
140R3024R0019
Issued by

About this file

This document is an amendment to a solicitation (Solicitation Number 140R3024R0019) for a Transformer Supply IDIQ contract for the Bureau of Reclamation. The purpose of the amendment is to extend the proposal deadline to September 3, 2024 at 5:00 PM PDT. The period of performance for the resulting contract is October 1, 2024 to September 30, 2029. The solicitation is for transformer materials and oil processing services to support operations at Hoover Dam. Offerors must acknowledge receipt of this amendment prior to the proposal deadline by completing the amendment, signing it, and submitting it with their proposal.

View the file

Other files

File Type Posted
Sol_140R3024R0019_Amd_0005.pdf PDF
Attachment_11_Nameplate_Photos_-_Oil_pump___Heat_exhangers_0005.pdf PDF
Sol_140R3024R0019_Amd_0003.pdf PDF
Attachment_10_IDIQ_Drawing_-_Transformer_Information_0003.pdf PDF
Sol_140R3024R0019_Amd_0002.pdf PDF
Attachment_7a_Xformer_Oil_Results_2022_0002.pdf PDF
C06_Q_A_on_RFP_140R3024R0019_0002.pdf PDF
Attachment_6_Transformer_Photos_0002.pdf PDF
Attachment_7_Xformer_Oil_Results_2024_0002.pdf PDF
Attachment_8_Westinghouse_Transformer_Information_0002.pdf PDF
Attachment_9_Wage_Determination_0002.pdf PDF
Attachment_1b_IDIQ_Drawing_45-301-5216-R27_0001.pdf PDF
Attachment_5_Past_Performance_Questionnaire_0001.doc DOC document
Attachment_2b_Delivery_Order_1_SOW_Hoover_Drawing_45-D-9325_0001.pdf PDF
Sol_140R3024R0019_Amd_0001.pdf PDF
Attachment_2a_Delivery_Order_1_SOW_ABB_Operation_and_Maintenance_Manual_0001.pdf PDF
Attachment_1a_IDIQ_Drawing_45-301-4699-R24_0001.pdf PDF
Attachment_4_DI-137_Release_of_Claims.pdf PDF
Attachment_1c_IDIQ_Drawing_GBM2027-1_Westinghouse_Transformer.pdf PDF
Attachment_5_Past_Performance_Questionnaire.doc DOC document
Attachment_1_Transformer_IDIQ_Specifications.pdf PDF
Attachment_2b_Delivery_Order_1_SOW_Hoover_Drawing_45-D-9325.pdf PDF
Attachment_2a_Delivery_Order_1_SOW_ABB_Operation_and_Maintenance_Manual.pdf PDF
Attachment_1b_IDIQ_Drawing_45-301-5216-R27.pdf PDF
Attachment_3_Price_Schedule.xlsx XLSX spreadsheet
140R3024R0019_RFP.pdf PDF
Attachment_1a_IDIQ_Drawing_45-301-4699-R24.pdf PDF
Attachment_2_Delivery_Order_1_SOW_KA3A_and_KA5A_Transformer_Material.pdf PDF
Sol_140R3024R0019.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140R3024R0019 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

R30

Boulder City NV 89005 500 Fir Street Lower Colorado Region - Regional Office Bureau of Reclamation

Boulder City NV 89005

R30

500 Fir Street Regional Office Lower Colorado Region Bureau of Reclamation

08/22/20240004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/16/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: Transformer Materials and Oil Processing - IDIQ

Purpose of Amendment: The purpose of this amendment is to extend the proposal deadline.

Receipt of Offers: The date and time for receipt of offers is hereby extended to 1700

(hour) PDT 09/03/2024 (date).

Acknowledgement: See Block 11 above regarding how to acknowledge this amendment. The acknowledgement must be received at the place designated for the receipt of offers prior to the hour and date specified in the solicitation.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Luis Gallardo

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140R3024R0019/0004

Description of Changes: The Request for Proposals is revised to incorporate the following changes.

All changes are marked with a vertical line on the left side border.

Changes:

1. Proposal deadline is extended to 5:00 PM PD

September 03, 2024.

Period of Performance: 10/01/2024 to 09/30/2029

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .