Attachment_2b_Delivery_Order_1_SOW_Hoover_Drawing_45-D-9325.pdf

PDF 800 KB Posted

Attached to
Transformer Supply IDIQ (Hoover Dam)
Solicitation number
140R3024R0019
Issued by

About this file

This document is the Statement of Work (SOW) for Delivery Order 1 under the Transformer Supply IDIQ contract for the Hoover Dam.

The SOW outlines the requirements for the supply and delivery of a 230 kV transformer and related oil processing equipment to the Hoover Dam facility operated by the Bureau of Reclamation, a civilian agency within the Department of the Interior. Key details include the required delivery timeline of 180 days, pricing to be based on the IDIQ contract's established labor and material rates, and specific technical specifications for the transformer such as voltage, capacity, and physical dimensions. The SOW also includes a reference drawing showing the transformer's dimensions and layout. This SOW is an attachment to the larger Transformer Supply IDIQ solicitation, which has an opportunity ID of f65b6d90e651474fb4cbf8331a60a71b.

View the file

Other files

File Type Posted
Sol_140R3024R0019_Amd_0005.pdf PDF
Attachment_11_Nameplate_Photos_-_Oil_pump___Heat_exhangers_0005.pdf PDF
Sol_140R3024R0019_Amd_0004.pdf PDF
Sol_140R3024R0019_Amd_0003.pdf PDF
Attachment_10_IDIQ_Drawing_-_Transformer_Information_0003.pdf PDF
Sol_140R3024R0019_Amd_0002.pdf PDF
Attachment_7a_Xformer_Oil_Results_2022_0002.pdf PDF
C06_Q_A_on_RFP_140R3024R0019_0002.pdf PDF
Attachment_6_Transformer_Photos_0002.pdf PDF
Attachment_7_Xformer_Oil_Results_2024_0002.pdf PDF
Attachment_8_Westinghouse_Transformer_Information_0002.pdf PDF
Attachment_9_Wage_Determination_0002.pdf PDF
Attachment_1b_IDIQ_Drawing_45-301-5216-R27_0001.pdf PDF
Attachment_5_Past_Performance_Questionnaire_0001.doc DOC document
Attachment_2b_Delivery_Order_1_SOW_Hoover_Drawing_45-D-9325_0001.pdf PDF
Sol_140R3024R0019_Amd_0001.pdf PDF
Attachment_2a_Delivery_Order_1_SOW_ABB_Operation_and_Maintenance_Manual_0001.pdf PDF
Attachment_1a_IDIQ_Drawing_45-301-4699-R24_0001.pdf PDF
Attachment_4_DI-137_Release_of_Claims.pdf PDF
Attachment_1c_IDIQ_Drawing_GBM2027-1_Westinghouse_Transformer.pdf PDF
Attachment_5_Past_Performance_Questionnaire.doc DOC document
Attachment_1_Transformer_IDIQ_Specifications.pdf PDF
Attachment_2a_Delivery_Order_1_SOW_ABB_Operation_and_Maintenance_Manual.pdf PDF
Attachment_1b_IDIQ_Drawing_45-301-5216-R27.pdf PDF
Attachment_3_Price_Schedule.xlsx XLSX spreadsheet
140R3024R0019_RFP.pdf PDF
Attachment_1a_IDIQ_Drawing_45-301-4699-R24.pdf PDF
Attachment_2_Delivery_Order_1_SOW_KA3A_and_KA5A_Transformer_Material.pdf PDF
Sol_140R3024R0019.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .