This document provides details for a solicitation seeking offers for renovations at the Hoover Dam Visitor Center exhibit level and office space. The Bureau of Reclamation is seeking a contractor to demolish the existing exhibit level space and construct an addition, build out new office space, and coordinate installation of interpretive elements. Offerors must demonstrate experience with similar renovations, provide a technical approach and schedule, and submit past performance references. The period of performance is 365 calendar days from award with a concurrent contract also being awarded for fabrication of interpretive elements not to exceed 425 days. Evaluation criteria include experience, technical approach, and past performance. Pricing will also be evaluated for reasonableness and balance.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
12/6/2022
Visitor Center Exhibit Level Renovations
Site Visit
Lower Colorado Dams Office 11/17/2022
• Background
• Hoover Dam owned and operated by the
Bureau of Reclamation
• Visitor Center opened in 1995
• Phase 2 of first major renovation since construction
• Phase 1 was our theater level completed March 2019
• We receive no federal appropriated funds
• All expenses paid by our 46 power customers though sale of power
• This project primarily paid for by Southern Nevada Public Lands Management Act (SNPLMA) program
Building Renovation
• Project Objectives
• Expand and improve the flow of the self-guided tour experience
• Replace end of life interior finishes with new durable easily maintened finishes
• Install new interactive exhibits to tell a broader Hoover Dam story
• Minimize impacts to tour operations during construction
• Minimize time exhibit level is out of service
Building Renovation
• Demolition and build out of Hoover Dam existing exhibit level space and construction of addition and coordination for installation of interpretive elements. Build out of new office space.
• Period of performance from date of award not to exceed 365 calendar days. This includes close out.
• Concurrent contract will be awarded for the Fabrication of Interpretive Elements, referred to as “Interpretive Contract”
Building Renovation
• Interpretive Contract baseline schedule accepted by the Government after award will drive the start date of Building Contract
• Anticipate award of Interpretive Contract within one week , period of performance not to exceed 425 days . NTP for Building Contract dependent upon Interpretive baseline schedule
• Building construction activity expected to take 180 days from start of demolition to ready for exhibit installation
• Government intention is to minimize the time period exhibits are not available to the public
Building Renovation
Contract
Award NTP
Close outAward NTP? Construction Installation
Interpretive Contract Fabrication Installation Close out
Contract Building Construction Contract
• Re-purposed items
• Concrete Bucket
• Dam Site model
• Generator model
• Removal of these exhibits will be coordinated with Interpretive Fabricator prior to start of demo
• Other items to be salvaged and turned over to Government to be coordinated with COR
• Building Contractor will coordinate closely with Interpretive Contractor and Government throughout performance period
• Weekly coordination meetings will be conducted throughout the performance period and all three parties are required to participate
• Each contractor will be responsible for presenting a 3 week look ahead schedule
• Tracking of submittal, RFI, change order, etc. status
• Other issues as identified by the COR or the team necessary for successful execution of this project
Building Renovation
Section L - Proposal Instructions
Factor 1 – Experience
Proposal Submission Requirements: The Offeror shall demonstrate acceptable level of experience to perform the work to be completed under this solicitation through presentation of prior completed works. Additional details found in section L.
Building Renovation
Building Renovation – Section L
Factor 2 - Technical Approach
Proposal Submission Requirements: The Offeror shall demonstrate through narrative description, graphs, tables, or other graphic means the Offeror deems valuable, a complete and thorough understanding of all features of work to be performed under this solicitation/contract. Additional details in Section L.
Building Renovation – Section L
Factor 3 - Past Performance
The Offeror must provide to the project references included in Factor 1, Experience. The Offeror shall provide a minimum of three (3) past performance references of contracts that are similar in size, complexity, and nature to this project on which the Offeror was the prime contractor or a major subcontractor. Projects shall represent work which is either on-going or has been completed during the past seven (7) years from the closing date of the solicitation. Additional details in Section L.
Building Renovation – Section M Factor 1: Experience Evaluation Standards:
1. Evaluation will be based on Offeror’s proposal addressing all of the proposal submission requirements of this factor and that submission clearly demonstrates past relevant experience of Offeror through exemplar project.
2. Information provided in Offeror’s exemplar projects must be verifiable via customer contact information provided. Customer feedback may also be considered.
Building Renovation – Section M Factor 1: Experience
3. In establishing what is relevant for this acquisition, consideration shall be given to an Offeror’s history of contract (or subcontract) performance that would provide the most context and give the greatest ability to measure the Offeror’s likely ability to successfully satisfy the current requirement. Common aspects of relevancy include similarity in size, scope and complexity, use of key personnel for this project from past similar projects, and ability to manage subcontracting.
Building Renovation – Section M Factor 2: Technical Approach Evaluation Standards:
1. Evaluation will be based on Offeror clearly addressing all of the proposal submission requirements outlined under this factor and that submission clearly demonstrates a thorough understanding of the work to be performed under this solicitation/contract.
2. Proposed milestone schedule includes all major activities required to complete work to be performed under this solicitation/contract and that durations and sequencing tasks are feasible.
Building Renovation – Section M
Factor 3: Past Performance Evaluation Standards:
1) Past performance will be evaluated in the areas of quality of service, timeliness of performance, customer satisfaction and cost control. Past performance will be evaluated in terms of overall relevancy to this project and in terms of overall level of confidence in the firms’ ability to successfully execute and complete this project supported by the indicated past performance.
Building Renovation – Section M
Factor 3: Past Performance Evaluation Standards:
2) Offerors demonstrating a higher level of successful past performance in the evaluated areas or that demonstrate past performance relevant to the work to be performed under this contract may receive a more favorable rating. In the case of an
Offeror without a record of relevant, recent past performance or for whom information on past performance is not available, the Offeror will be rated as neutral.
Building Renovation – Section M Factor 3: Past Performance Evaluation Standards:
3) The evaluation will be based on information obtained from the Past Performance Questionnaires, and other relevant past performance information obtained from other sources known to the Government, to include additional references, and the
Contractor Performance Assessment Reporting System (CPARS).
4) The Government will assess the relative risks associated with each Offeror. Performance risks are those associated with an
Offeror’s likelihood of success in performing the acquisition requirements as indicated by that Offeror’s record of past performance.
Building Renovation – Section M
Factor 4: Price:
Evaluation Standard: The price proposal (Price Schedule, Section
B.) will be evaluated for price reasonableness and any instances of unbalanced pricing.
• Full Disclosure
• First large-scale Interpretive contract for our team
• During construction Government has LGA Architecture and AldrichPears (APA) under support contracts
• What else do we need to discuss
• Answers are only official answers when in writing
Questions?