140R3023R0003_-_Questions_and_Responses_-Amd_No_0001_0001.pdf

PDF 99 KB Posted

Attached to
Hoover Dam Visitor Center Exhibit Level & Renovate
Solicitation number
140R3023R0003
Issued by

About this file

This document contains questions and responses regarding Solicitation No. 140R3023R0003 from the Bureau of Reclamation for renovation work at the Hoover Dam Visitor Center exhibit level and office spaces. Key details include specifications for biopolymer terrazzo flooring, allowance for press fit copper pipe joints if not buried, and an extension of the proposal due date from December 9th to December 16th, 2022 at 3:00pm MST in response to feedback regarding additional time needed for subcontractor bids. Attachment No. 9 provides exhibit design drawings and lighting details, and clarifies that underfloor junction boxes in exhibit areas require accessible covers painted to match flooring. Existing speakers are to be removed unless otherwise noted.

View the file

Other files

File Type Posted
E6_02_ELECTRICAL_SCHEDULES_122022_0004.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0004_0004.pdf PDF
A2_41_EXHIBIT_LEVEL_-_FINISH_FLOOR_PLAN_-_122022_0004.pdf PDF
SK_02_HDVC_Turbine_Terrazzo_Detail-122022_0004.pdf PDF
A7_03_WALL_SECTIONS_-_122022_0004.pdf PDF
E0_01_ELECTRICAL_LEGEND__ABBREVIATIONS____SHEET_INDEX_-_122022_0004.pdf PDF
Sol_140R3023R0003_Amd_0004.pdf PDF
E3_02_ELECTRICAL_CEILING_DEVICE_POWER_PLAN_-_122022_0004.pdf PDF
X0_300_-_WALL_FINISHES_AND_PAINT_PLAN_0003.pdf PDF
A2_41_EXHIBIT_LEVEL_-_FINISH_FLOOR_PLAN_0003.pdf PDF
E6_02_ELECTRICAL_SCHEDULES_0003.pdf PDF
E3_02_ELECTRICAL_CEILING_DEVICE_POWER_PLAN_0003.pdf PDF
A2_45_EXHIBIT_LEVEL_-_WALL_FINISH_PLAN_0003.pdf PDF
A2_46_OFFICE_LEVEL_-_WALL_FINISH_PLAN_0003.pdf PDF
Sol_140R3023R0003_Amd_0003.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0003_0003.pdf PDF
E0_01_ELECTRICAL_LEGEND__ABBREVIATIONS____SHEET_INDEX_0003.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0002_0002.pdf PDF
Sol_140R3023R0003_Amd_0002.pdf PDF
140R3023R0003_-_Amendment_No__0001_-_Revised_Sections_L___M_0001.pdf PDF
Attachment_9_-_Design_Drawings_0001.pdf PDF
Site_Visit_PowerPoint_Presentation_-_140R3023R0003_0001.pdf PDF
Sol_140R3023R0003_Amd_0001.pdf PDF
Final_Attendee_List_140R3023R0003_0001.pdf PDF
Attachment_3_-_Wage_Decision_No__NV20220038_-_10-21-2022.pdf PDF
Attachment_6_-_Waste_Diversion_FORM_E.pdf PDF
Attachment_5_-_Construction_Payment_Requirements.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_7_-_DI-137_Release_of_Claims.pdf PDF
_Solicitation_No__140R3023R0003_-_HD_VC_Exhibit_Level_-_Renovated_Office_Space.pdf PDF
Attachment_1_-_Specifications_-_Final_3-2022.pdf PDF
Sol_140R3023R0003.pdf PDF
Attachment_2__-_Drawings.pdf PDF
Attachment_4_-_Bond_Forms.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Reclamation Solicitation No. 140R3023R0003 Amendment No. 00001

Questions and Responses

Hoover Dam Visitor Center Exhibit Level & Renovated Office Space

1. Question - Per E3.01 Keyed Note #4 states layout is per AV consultant design. It is stated to coordinate with AV and

Technology plan. I do not see these reflected as part of the bid package.

Response –See Attachment No. 9 - Hoover Dam Visitor Center Exhibit Design Drawings incorporated into this amendment. See AV sheets.

2. Question - Fixture schedule E6.02 states fixtures L01 Through L06 are to be specified by others. It is stated to refer to lighting designer drawings, but there do not appear to be lighting designer drawings as part of the bid package.

Response – See Attachment No. 9 - Hoover Dam Visitor Center Exhibit Design Drawings incorporated into this amendment. See Lighting sheets. Sheets will be revised to update lighting schedule and incorporated in amendment No. 0002

3. Question - In the exhibit area there appears to be an underfloor duct system installed. Currently all of the reflected Existing J-boxes are covered by floor tile. In review of floor finish drawings A2.41 this area is stated to refer to exhibit drawings. These drawings do not appear to have been provided as part of the bid package. Concern is that currently all of the J-boxes are covered by the current floor covering and that these J boxes should be accessible. These boxes are typical to 35+/- locations and should be accessible at any and all time and should not be covered by finishes as they currently are.

Response – See Attachment No. 9 - Hoover Dam Visitor Center Exhibit Design Drawings incorporated into this amendment. See Exhibit Design Drawings for exhibit area floor finishes. Underfloor duct junction boxes need accessible covers, per sheet E3.01 General Note C. Covers can be painted to match flooring color in the Exhibit areas.

Locations are shown in plan on sheet E3.01.

4. Question - Current space has speakers throughout and the documents do not indicate any. Please advise how these are to be addressed.

Response – Unless otherwise noted, existing speakers are to be removed. See Sheet E1.03, General Note C. New sheet will be incorporated in Amendment No. 0002 to identify power to the new AV speakers.

5. Question – Per Specification Section 09 66 23, Request to provide acceptable substitution for Biopolymer terrazzo flooring. Is resinous matrix terrazzo acceptable?

Response – Data on the proposed substitution must be submitted for review and consideration. The product must be red-list free, as well as match the finish and maintenance requirements of the biopolymer terrazzo.

6. Question - Specification indicates Copper pipe jointing requirements 1.10E Qualify soldering processed ASTM B 828 is soldering the joints the only way for connecting copper pipe. NFPA 13 6.5.5 allows press fit copper joints. A/E please advise if press fit copper joints are acceptable.

Response – Press fit copper joints are acceptable provided they are not buried in the ground.

7. Question - We have received feedback from several major subcontractors expressing concerns associated with their ability to submit bid proposals by the 12/9 due date. As such, we believe it would be in the best interest of the Bureau of Reclamation to postpone the project bid date until Friday, December 16, 2022, at 2pm PST. This extra time would simply allow A/E to respond to RFI’s and more subcontractors to produce bid proposals for your project, resulting in a more competitively bid project overall. Thank you for your time and consideration.

Response – RFP due date has been extended from 12/9/2022 to Thursday, 12/16/22 at 3:00 pm MST.

Bureau of Reclamation Solicitation No. 140R3023R0003 Amendment No. 00001

This page left intentionally blank

File details come from the government source that posted it. Updated .