This document is the wall finish plan for the office level of the Hoover Dam Visitor Center Exhibit Level & Renovated Office Space project. The project involves renovating office space and constructing new exhibit levels at the Hoover Dam Visitor Center. The Bureau of Reclamation is the contracting agency managing the project. The wall finish plan specifies the finishes, textures, and materials to be used for walls throughout the office level. These include level 4 wall finishes with spatter texture, WB-1 base at all walls, 100% acrylic zero VOC paints, brushed stainless steel receptacle and switch plates, and slatwall and glass wall panels. The plan also provides notes regarding preparing surfaces, patching and repair work, and notifying the general contractor of any discrepancies. Solicitation number 140R3023R0003 relates to this project for renovating the Hoover Dam Visitor Center.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
241 W. Char leston Blvd., Suite 107 Las Vegas, NV 89102 702.263.7111
LGA ar chitectur e.com
AL
W
AY
S
TH
IN
K
SA
FE
TY
CA
D
FI
LE
NA
M
E
CA
D
SY
ST
EM
D
C
B
A
D
C
B
A
U.
S.
D
EP
AR
TM
EN
T
OF
T
HE
IN
TE
RI
OR
BU
RE
AU
O F
RE
CL
AM
AT
IO
N
Managing Water in the West
HO
OV
ER
D
AM
V
IS
IT
OR
C
EN
TE
R
EX
HI
BI
T
LE
VE
L A
ND
R
EN
OV
AT
ED
O
FF
IC
E
SP
AC
E
PR
OJ
EC
T
OFFICE LEVEL - WALL
FINISH PLAN
OFFICE
A2.46
AR
CH
IC
AD
BI
M clo ud
: b im
.lg ain c.c om
BI
M clo ud B as ic fo r A rc hic ad
5/
Ho ov er D am V isi to r C en te r E xh ibi t L ev el
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
All dimensions and on-site conditions are to be verified by the Subcontractors before starting their work.
Report any discrepancies to the General Contractor.
Date of Issue: 03/16/22
G. PEZZI / C. LAUSSO
A. BRADSHAW
043820001PROJECT NO.:
(consultant)
(stamp)
B U
R E
A U
O F
R E
C
LA
M
AT
IO
N
B O
U
LD
E R
C
IT
Y N
V
All Drawings, Specifications and Copies thereof furnished by the Architect are to be used only with respect to this Project and are not to be used on any other Project with the exception of one contract set for each party to the building contract. Such Documents are to be returned or suitably accounted for to the Architect on request at the completion of the Project. Any use or reproduction of this Drawing in whole or in part by any means whatsoever is strictly prohibited except with the specific written consent of LG Architects, Inc., a Nevada Corporation. Copyright © LG Architects, Inc. all rights reserved. Submission or distribution to meet official regulatory requirements or for other purposes in connection with the project in not to be construed as publication in derogation of the Architects common law Copyrights or other reserved rights.
RECLAMATION
03/16/22
1. NOTIFY COR OF ANY DISCREPANCIES.
2. ALL WALLS TO HAVE LEVEL 4 FINISH WITH SPATTER
TEXTURE.
3. USE WB-1 BASE AT ALL WALLS AS NOTED ON A2.50
SCHEDULES
4. CONTRACTOR TO PROVIDE 10% OVERAGE OF BACK STOCK
FOR OWNER OF ALL MATERIALS.
5. ALL PAINTS TO BE 100% ACRYLIC AND ZERO VOC.
6. PREPARE ALL PAINTED SURFACES WITH (1) COAT PRIMER
AND MINIMUM (2) TWO COATS FINISH. FINISH COAT OF PAINT
MUST HAVE 100% COVERAGE.
7. ALL RECEPTICLES/SWITCHES/DATAPORTS COVERPLATES TO
BE BRUSHED STAINLESS STEEL.
8. PATCH, REPAIR AND REFINISH EXISTING ADJACENT WALL
AND BASE THAT MAY BE DAMAGED DURING DEMOLITION
AND CONSTRUCTION, TYP.
WALL FINISH GENERAL NOTES
WALL FINISH KEYNOTES
CORNER GUARDS, SEE SPECIFICATIONS
ETCHED GLASS PANEL/SEE PLAN DETAIL
MEGAWALL SLATWALL PANEL 4'X 8' TYP.
INTERIOR MOTORIZED ROLLER SHADE
STAINLESS STEEL COLUMN COVERS SEE SCHEDULE
A2.50.
FRL PANELS, SEE RESTROOM ELEVATIONS FOR PATTERN
DOW
N
B1.2
B1.4
PT-05
PT-02
PT-06
PT-02
PT-06
PT-06
PT-02
U
P
D N
B1
B6
B6.2
B6.4
B6.6
B6.8
B7
B7.2
B7.4
B7.6
B8
B8.2
B8.4
B8.6
B8.8
B7.8
B5.8
B5.6
B5.4
B5.2 B4.8
B4.6
B4.4
B4.2
B4
B3.8
B3.6
B3.4
B3.2
B2
B5
AB1 AB2
A2
A3
A4A5
A6
A7
A8 A1
B3
B1.6
B1.8
B2.2
B2.4
B2.6
UP
PT-02
PT-06
PT-02
PT-02
MECHANICAL
MECH
WELL
STAIR
S5
OFFICE
CONFERENCE
ROOM
OPEN
OFFICE
BREAK
303 KEY PLAN
SCALE: 1/8" = 1'-0"1 OFFICE LEVEL WALL FINISH PLAN
0 4' 8' 16'
ADDENDUM 2 - 12/15/22
NOT A PART
NOT A PART
NOT A
PART
OFFICE
LEVEL