A2_41_EXHIBIT_LEVEL_-_FINISH_FLOOR_PLAN_0003.pdf

PDF 2 MB Posted

Attached to
Hoover Dam Visitor Center Exhibit Level & Renovate
Solicitation number
140R3023R0003
Issued by

About this file

This document is the finish floor plan for the exhibit level and renovated office space of the Hoover Dam Visitor Center project. The project involves installing new terrazzo flooring throughout the exhibit level galleries and spaces, with the exception of transitions to finishes installed by the exhibit contractor, and renovating office spaces. The Bureau of Reclamation is soliciting bids under solicitation number 140R3023R0003 to complete the exhibit level and office renovations. Flooring includes terrazzo, luxury vinyl tile, carpet tile, and sealed concrete. The plan specifies finish materials, notes transitions between contractor scopes of work, and provides a key and legend.

View the file

Other files

File Type Posted
E6_02_ELECTRICAL_SCHEDULES_122022_0004.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0004_0004.pdf PDF
A2_41_EXHIBIT_LEVEL_-_FINISH_FLOOR_PLAN_-_122022_0004.pdf PDF
SK_02_HDVC_Turbine_Terrazzo_Detail-122022_0004.pdf PDF
A7_03_WALL_SECTIONS_-_122022_0004.pdf PDF
E0_01_ELECTRICAL_LEGEND__ABBREVIATIONS____SHEET_INDEX_-_122022_0004.pdf PDF
Sol_140R3023R0003_Amd_0004.pdf PDF
E3_02_ELECTRICAL_CEILING_DEVICE_POWER_PLAN_-_122022_0004.pdf PDF
X0_300_-_WALL_FINISHES_AND_PAINT_PLAN_0003.pdf PDF
E6_02_ELECTRICAL_SCHEDULES_0003.pdf PDF
E3_02_ELECTRICAL_CEILING_DEVICE_POWER_PLAN_0003.pdf PDF
A2_45_EXHIBIT_LEVEL_-_WALL_FINISH_PLAN_0003.pdf PDF
A2_46_OFFICE_LEVEL_-_WALL_FINISH_PLAN_0003.pdf PDF
Sol_140R3023R0003_Amd_0003.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0003_0003.pdf PDF
E0_01_ELECTRICAL_LEGEND__ABBREVIATIONS____SHEET_INDEX_0003.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0002_0002.pdf PDF
Sol_140R3023R0003_Amd_0002.pdf PDF
140R3023R0003_-_Amendment_No__0001_-_Revised_Sections_L___M_0001.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No_0001_0001.pdf PDF
Attachment_9_-_Design_Drawings_0001.pdf PDF
Site_Visit_PowerPoint_Presentation_-_140R3023R0003_0001.pdf PDF
Sol_140R3023R0003_Amd_0001.pdf PDF
Final_Attendee_List_140R3023R0003_0001.pdf PDF
Attachment_3_-_Wage_Decision_No__NV20220038_-_10-21-2022.pdf PDF
Attachment_6_-_Waste_Diversion_FORM_E.pdf PDF
Attachment_5_-_Construction_Payment_Requirements.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_7_-_DI-137_Release_of_Claims.pdf PDF
_Solicitation_No__140R3023R0003_-_HD_VC_Exhibit_Level_-_Renovated_Office_Space.pdf PDF
Attachment_1_-_Specifications_-_Final_3-2022.pdf PDF
Sol_140R3023R0003.pdf PDF
Attachment_2__-_Drawings.pdf PDF
Attachment_4_-_Bond_Forms.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

241 W. Char leston Blvd., Suite 107 Las Vegas, NV 89102 702.263.7111

LGA ar chitectur e.com

AL

W

AY

S

TH

IN

K

SA

FE

TY

CA

D

FI

LE

NA

M

E

CA

D

SY

ST

EM

D

C

B

A

D

C

B

A

U.

S.

D

EP

AR

TM

EN

T

OF

T

HE

IN

TE

RI

OR

BU

RE

AU

O F

RE

CL

AM

AT

IO

N

Managing Water in the West

HO

OV

ER

D

AM

V

IS

IT

OR

C

EN

TE

R

EX

HI

BI

T

LE

VE

L A

ND

R

EN

OV

AT

ED

O

FF

IC

E

SP

AC

E

PR

OJ

EC

T

EXHIBIT LEVEL - FINISH

FLOOR PLAN

OFFICE

A2.41

AR

CH

IC

AD

BI

M clo ud

: b im

.lg ain c.c om

BI

M clo ud B as ic fo r A rc hic ad

5/

Ho ov er D am V isi to r C en te r E xh ibi t L ev el

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

All dimensions and on-site conditions are to be verified by the Subcontractors before starting their work.

Report any discrepancies to the General Contractor.

Date of Issue: 03/16/22

G. PEZZI / C. LAUSSO

A. BRADSHAW

043820001PROJECT NO.:

(consultant)

(stamp)

B U

R E

A U

O F

R E

C

LA

M

AT

IO

N

B O

U

LD

E R

C

IT

Y N

V

All Drawings, Specifications and Copies thereof furnished by the Architect are to be used only with respect to this Project and are not to be used on any other Project with the exception of one contract set for each party to the building contract. Such Documents are to be returned or suitably accounted for to the Architect on request at the completion of the Project. Any use or reproduction of this Drawing in whole or in part by any means whatsoever is strictly prohibited except with the specific written consent of LG Architects, Inc., a Nevada Corporation. Copyright © LG Architects, Inc. all rights reserved. Submission or distribution to meet official regulatory requirements or for other purposes in connection with the project in not to be construed as publication in derogation of the Architects common law Copyrights or other reserved rights.

RECLAMATION

03/16/22

U P

DN

B1.2

B1.4

2' 2'

9' -1

0"

NOTE: BUILDING CONTRACTOR

NOT RESPONSIBLE FOR

FLOORING IN EXHIBIT AREA,

ONLY DEMOLITION AS

INDICATED ON SHEET A0.01

NOTE: BUILDING CONTRACTOR

NOT RESPONSIBLE FOR

FLOORING IN EXHIBIT AREA,

ONLY DEMOLITION AS

INDICATED ON SHEET A0.01

NOTE: BUILDING CONTRACTOR

NOT RESPONSIBLE FOR

FLOORING IN EXHIBIT AREA,

ONLY DEMOLITION AS

INDICATED ON SHEET A0.01

NOTE: BUILDING CONTRACTOR TO

COORDINATE WITH EXHIBIT

CONTRACTOR ON FLOORING

TRANSITIONS BETWEEN EACH

CONTRACTOR'S SCOPE OF WORK

NOTE: BUILDING CONTRACTOR

TO COORDINATE WITH EXHIBIT

CONTRACTOR ON FLOORING

TRANSITIONS BETWEEN EACH

CONTRACTOR'S SCOPE OF

WORK

UP

U P

DN

SLOPE

2.75%

OPEN

TO

BELOW

WOMEN

ELECTRICAL

JANITOR

EXHIBIT

LOBBY

GALLERY

RECEPTION

TOUR

EXIT

B1

B6

B6.2

B6.4

B6.6

B6.8

B7

B7.2

B7.4

B7.6

B8

B8.2

B8.4

B8.6

B8.8

B7.8

B5.8

B5.6

B5.4

B5.2 B4.8

B4.6

B4.4

B4.2

B4

B3.8

B3.6

B3.4

B3.2

B2

B5

AB1 AB2

A2

A3

A4A5

A6

A7

A8 A1

B3

B1.6

B1.8

B2.2

B2.4

B2.6

R 2'-6"

R 2'-6"

SLOPE4.75%

VESTIBULE

MEN

FOYER

EXHIBIT

ENTRY

FLOOR FINISH KEYNOTES

ART DECO GRAPHIC INLAY TO MATCH THEATER LEVEL,

CONTRACTOR TO PROVIDE SUBMITTALS FOR APPROVAL

BY COR

INTERPRETIVE INSTALLATIONS, SEE INTERPRETIVE

DRAWINGS

EXISTING STONE TILE FINISH ON TREADS AND RISERS TO

BE REMOVED; REPLACE WITH TERRAZZO FLOORING TO

MATCH EXHIBIT LEVEL GALLERY AND EXHIBIT SPACE

REMOVE EXISTING FLOORING AND PREPARE FOR NEW

WOOD FLOORING BY OTHERS

FLOOR DIFFUSER, SEE MECHANICAL DRAWINGS

STAINLESS STEEL COLUMN WRAP, TYP

REFER TO TDS-1 ON SCHEDULE A2.50 AT TERRAZZO

FLOOR UNO, TYP

LVT-1 FLOORING TO TERMINATE AT EXISTING CASEWORK

TOE-KICK EDGE

1. NOTIFY COR OF ANY DISCREPANCIES.

2. PREPARE ALL SUBSTRATE FLOORS PER MANUFACTURER'S

DIRECTIONS

3. WHERE ADJACENT FLOOR FINISH MATERIALS VARY MORE

THAN 1/4" IN HEIGHT USE A "SCHLUTER" METAL TRANSITION

STRIP TO ACCOMMODATE ACCESSIBILITY SLOPE

GUIDELINES. ALIGN TRANSITION STRIP TO CENTER OF DOOR

PANELS

4. REFERENCE SHEET A2.50 FOR MATERIAL SCHEDULE

5. ALL ADHESIVES TO BE LOW VOC

6. FLOOR PATTERN SHOWN IS THE FLOOR PATTERN DIRECTION

FOR INSTALLATION.

7. CONTRACTOR TO PROVIDE 10% OVERAGE OF BACK STOCK

FOR OWNER OF ALL MATERIALS

8. FLOOR BOXES AND COVERS TO BE NICKEL FINISH.

FLOOR FINISH GENERAL NOTES

FLOOR FINISH PLAN LEGEND

LUXURY VINYL TILE (LVT-1)

SEALED CONCRETE (SC-1)

TERRAZZO FLOORING (TER-1), COLOR TO MATCH

TERRAZZO FLOORING AT THEATER LEVEL,

CONTRACTOR TO PROVIDE SAMPLES FOR APPROVAL

TERRAZZO FLOORING (TER-2)

CARPET TILE FLOORING (CPT-1)

CARPET TILE FLOORING (CPT-2) 80%, CARPET TILE

FLOORING (CPT-3) 10%

KEY PLAN

N

1 1

SCALE: 1/8" = 1'-0"1 EXHIBIT LEVEL FINISH PLAN

0 4' 8' 16'

NOTE: TERRAZZO FLOOR FINISH ON EXHIBIT

LEVEL IS TO BE CONTINUOUS THROUGHOUT

EXCEPT, WITH APPROPRIATE TRANSITIONS

BETWEEN EXHIBIT CONTRACTOR'S AND

BUILDING CONTRACTOR'S SCOPES OF WORK.

SEE EXHIBIT DRAWINGS FOR ADDITIONAL

INFORMATION AND FINISHES WHERE

APPLICABLE

ADDENDUM 2 - 12/15/22

EXHIBIT

LEVEL

NOT A

PART

File details come from the government source that posted it. Updated .