This document contains questions and responses related to a federal solicitation for renovations to the Hoover Dam Visitor Center Exhibit Level and office spaces. The solicitation is issued by the Department of the Interior Bureau of Reclamation for construction services including demolition of existing finishes, installation of new terrazzo flooring, EIFS wall panels, ceilings, doors and other interior renovations. The due date for proposals was extended to December 22, 2022 at noon MST. Key clarifications provided in the responses include specifications for new flooring, wall finishes, stairs and details for transitions between materials. Electrical and A/V requirements are also addressed. The document provides additional information to support accurate bidding on the solicitation.

View the file

Other files

File Type Posted
E6_02_ELECTRICAL_SCHEDULES_122022_0004.pdf PDF
A2_41_EXHIBIT_LEVEL_-_FINISH_FLOOR_PLAN_-_122022_0004.pdf PDF
SK_02_HDVC_Turbine_Terrazzo_Detail-122022_0004.pdf PDF
A7_03_WALL_SECTIONS_-_122022_0004.pdf PDF
E0_01_ELECTRICAL_LEGEND__ABBREVIATIONS____SHEET_INDEX_-_122022_0004.pdf PDF
Sol_140R3023R0003_Amd_0004.pdf PDF
E3_02_ELECTRICAL_CEILING_DEVICE_POWER_PLAN_-_122022_0004.pdf PDF
X0_300_-_WALL_FINISHES_AND_PAINT_PLAN_0003.pdf PDF
A2_41_EXHIBIT_LEVEL_-_FINISH_FLOOR_PLAN_0003.pdf PDF
E6_02_ELECTRICAL_SCHEDULES_0003.pdf PDF
E3_02_ELECTRICAL_CEILING_DEVICE_POWER_PLAN_0003.pdf PDF
A2_45_EXHIBIT_LEVEL_-_WALL_FINISH_PLAN_0003.pdf PDF
A2_46_OFFICE_LEVEL_-_WALL_FINISH_PLAN_0003.pdf PDF
Sol_140R3023R0003_Amd_0003.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0003_0003.pdf PDF
E0_01_ELECTRICAL_LEGEND__ABBREVIATIONS____SHEET_INDEX_0003.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No__0002_0002.pdf PDF
Sol_140R3023R0003_Amd_0002.pdf PDF
140R3023R0003_-_Amendment_No__0001_-_Revised_Sections_L___M_0001.pdf PDF
140R3023R0003_-_Questions_and_Responses_-Amd_No_0001_0001.pdf PDF
Attachment_9_-_Design_Drawings_0001.pdf PDF
Site_Visit_PowerPoint_Presentation_-_140R3023R0003_0001.pdf PDF
Sol_140R3023R0003_Amd_0001.pdf PDF
Final_Attendee_List_140R3023R0003_0001.pdf PDF
Attachment_3_-_Wage_Decision_No__NV20220038_-_10-21-2022.pdf PDF
Attachment_6_-_Waste_Diversion_FORM_E.pdf PDF
Attachment_5_-_Construction_Payment_Requirements.pdf PDF
Attachment_8_-_Past_Performance_Questionnaire.pdf PDF
Attachment_7_-_DI-137_Release_of_Claims.pdf PDF
_Solicitation_No__140R3023R0003_-_HD_VC_Exhibit_Level_-_Renovated_Office_Space.pdf PDF
Attachment_1_-_Specifications_-_Final_3-2022.pdf PDF
Sol_140R3023R0003.pdf PDF
Attachment_2__-_Drawings.pdf PDF
Attachment_4_-_Bond_Forms.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Reclamation Solicitation No. 140R3023R0003 Amendment No. 0004

Questions and Responses

Hoover Dam Visitor Center Exhibit Level & Renovated Office Space

1. Question - Per E3.01 Keyed Note #4 states layout is per AV consultant design. It is stated to coordinate with AV and Technology plan. I do not see these reflected as part of the bid package.

Response –See Attachment No. 9 - Hoover Dam Visitor Center Exhibit Design Drawings incorporated into this amendment. See AV sheets.

2. Question - Fixture schedule E6.02 states fixtures L01 Through L06 are to be specified by others. It is stated to refer to lighting designer drawings, but there do not appear to be lighting designer drawings as part of the bid package.

Response – See Attachment No. 9 - Hoover Dam Visitor Center Exhibit Design Drawings incorporated into this amendment. See Lighting sheet number E6.02.

3. Question - In the exhibit area there appears to be an underfloor duct system installed.

Currently all of the reflected Existing J-boxes are covered by floor tile. In review of floor finish drawings A2.41 this area is stated to refer to exhibit drawings. These drawings do not appear to have been provided as part of the bid package. Concern is that currently all of the J-boxes are covered by the current floor covering and that these J boxes should be accessible.

These boxes are typical to 35+/- locations and should be accessible at any and all time and should not be covered by finishes as they currently are.

Response – See Attachment No. 9 - Hoover Dam Visitor Center Exhibit Design Drawings incorporated into this amendment. See Exhibit Design Drawings for exhibit area floor finishes. Underfloor duct junction boxes need accessible covers, per sheet E3.01 General Note C. Covers can be painted to match flooring color in the Exhibit areas. Locations are shown in plan on sheet E3.01.

4. Question - Current space has speakers throughout and the documents do not indicate any. Please advise how these are to be addressed.

Response – Unless otherwise noted, existing speakers are to be removed. See Sheet E1.03, General Note C. Refer to new sheet E3.02 to address AV and E0.01 to update index.

5. Question – Per Specification Section 09 66 23, Request to provide acceptable substitution for Biopolymer terrazzo flooring. Is resinous matrix terrazzo acceptable?

Response – Data on the proposed substitution must be submitted for review and consideration. The product must be red-list free, as well as match the finish and maintenance requirements of the biopolymer terrazzo.

6. Question - Specification indicates Copper pipe jointing requirements 1.10E Qualify soldering processed ASTM B 828 is soldering the joints the only way for connecting copper pipe. NFPA 13 6.5.5 allows press fit copper joints. A/E please advise if press fit copper joints are acceptable.

Response – Press fit copper joints are acceptable provided they are not buried in the ground.

7. Question - We have received feedback from several major subcontractors expressing concerns associated with their ability to submit bid proposals by the 12/9 due date. As such, we believe it would be in the best interest of the Bureau of Reclamation to postpone the project bid date until Friday, December 16, 2022, at 2pm PST. This extra time would simply allow A/E to respond to RFI’s and more subcontractors to produce bid proposals for your project, resulting in a more competitively bid project overall. Thank you for your time and consideration.

Response – RFP due date has been extended from Thursday, 12/15/22 at 3:00 pm MST. to Thursday, 12/22/2022 at Noon MST.

8. Question - Sheet A0.03 Demolition RCP Keynotes, 05 indicates, “remove ceiling as needed to install steel beams, replace ceiling system once structural work is complete.” “Replace” with new or reinstall existing ceiling system. A/E please clarify “replace”.

Response – With exception of ceiling tile in the existing Exhibit Space, all other ceiling tile areas must be replaced with new grid and tile.

9. Question - Sheet A2.42 shows terrazzo flooring to go up the stair from the Office level up midway. A/E please advise on specific location of the stopping point of the terrazzo to the Observation Level.

Response – Refer to keynote 24 on Sheet A0.03 for extent of demo of existing floor tile, to be replaced with terrazzo flooring.

10. Question - Specs section 09 66 23 indicates Biopolymer Terrazzo. The Biopolymer Terrazzo is not able to be cast in place on vertical surfaces such as wall base and stair vertical risers.

In using the Biopolymer Terrazzo these design elements would be limited to precast and the details would not match the Theater installation. A/E please verify if Epoxy Terrazzo is acceptable in lieu of the Biopolymer Terrazzo.

Response – Epoxy Terrazzo is not acceptable. Biopolymer Terrazzo Flooring representative has indicated that they are able to match the Theater Level wall base and vertical risers using the Biopolymer.

11. Question - The documents do not clearly show if the terrazzo flooring is to be continuous into the exhibit area. A/E please advise.

Response – Correction to Response issued within amendment No. 0003. Sheet A2.41 indicates extent of flooring where the scope break occurs between new terrazzo flooring to be installed, and new terrazzo flooring to be installed. See attached REVISED drawing sheet No. A2.41 and sheet No. SK_02 HDVC Turbine Terrazzo Detail which clarifies the response to this question. The building contractor is responsible for installation of the terrazzo in all areas within the scope of work.

12. Question - Documents do not show a stair detail extending up from the Office Level. A/E please provide detail.

Response – Stair details are indicated on Sheets A2.35 and A2.36. Please clarify the request or question.

13. Question - Documents do not show stair details for the outside edge of the stairs. A/E please provide detail.

Response – Outside of stair treads (at curtainwall) to be finished by edge condition of the precast stair treads and risers. No waterfall condition.

14. Question - Documents do not clearly show the thickness of existing finishes to be removed.

For bidding purposes should assume 2” buildup. A/E please advise on the build back/underlayment will be necessary to prepare the existing floor for new terrazzo.

Response – Assume at least 2” buildup where tile is being removed in the existing building (carpet shouldn’t be an issue), and possibly 3”- 4” where new addition sits on the plaza slab (see response to 16 on this list of questions). Floor can be floated out using Shonox APF Self-Leveling compound. Then install Durabella as directed.

15. Question - Documents on sheet 7/A2.35 shows new precast terrazzo stairs. A/E please advise if this can be poured in-place in lieu of precast.

Response – Stairs to remain as designed as precast terrazzo.

16. Question - Please refer to wall section detail 1/2/A7.01 the interior does not indicate the required material. The interior looks like a pour back or build-up. Refer to 7/A2.65 and 1/A2.67 the interior shows only a finish floor. The Structural drawing do not show the interior of the addition slab. Documents do not clearly show the requirement at the new addition slab. A/E please advise.

Response – The existing floor slab at the Exhibit Level is a composite deck as indicated in keynote 2 on sheet S1.03A. Per existing drawings of the Visitor Center, this composite deck extends into the Plaza, with a 3” concrete topping slab. Per keynote 7 on sheet A0.01, the concrete topping slab in the Plaza is to be demolished where impacted by the new addition.

The floor slab for the addition is essentially a non-structural filler on top of the existing composite deck, leveled out to receive terrazzo floor at finish floor height.

17. Question – Documents indicate to install Prefabricated EIFS panels Fedderlite panels that would be cost inhibit. The Manufacturer suggest using standard Outsulation Plus MD system. A/E please advise if Outsulation Plus MD system would be acceptable.

Response – In order for Outsulation Plus MD to be considered an acceptable alternate, please demonstrate equivalency to the Fedderlite system in matching performance and design intent.

18. Question - Sheet A2.60 Door Legend, notes for Door Type C. “Provide power, connect to existing bldg. security system” Document do not clearly show any locations of existing security system and requirements. A/E please advise.

Response – Keynote 7 on sheet E3.01 indicates to coordinate termination requirements with Owner Representative.

19. Question - Documents includes Specification section 10 26 00 Corner Guards and indicates “Locations: as indicated on Drawings.” Drawings do not indicate any. A/E please advise if any are required.

Response – Refer to sheet numbers A2.45, A2.46 for locations of corner guards.

20. Question - Clarification the Solicitation indicates “the interpretive installation schedule of forty (40 working days).” We assume the forty working days is schedule after the 180 construction duration. A/E please confirm.

Response: The estimated 40 working days for the interpretive installation will occur after the estimated 180 days of construction duration from start of demolition. Exhibit area is to be at a condition ready for interpretive installation at this point. Building construction is estimated to continue during and past interpretive installation in areas not negatively affecting the interpretive installation.

21. Question: Sheet A2.41 Floor Finish Keynotes 01 indicates, “Art Deco graphic inlay to match theater level…” There are a couple of different Art Deco on the Theater Level. A/E please provide a photo of which existing Art Deco graphic inlay to match.

Response: See photo below of Theater Level graphic inlay for reference.

22. Question: Documents shows new 2’x2’ suspended acoustical (C-1) ceiling tile & grid.

Documents do not clearly identify the type required. A/E please advise.

Response: Basis of Design for 2’x2’ ceiling is USG Mars High NRC Acoustical Panels 90/30, with SLT Edge, 2’x2’x1”. Use Donn DX/DXL 15/16” Acoustical Suspension System as manufactured by USG. Heavy Duty. Flat Flush, Color: White

23. Question: A0.01 Demolition Keynotes #22 indicates “Remove column covers” documents do not indicate removal of the concrete base or at the top. A/E please advise if existing concrete base and at the top are to remain or to be demo.

Response: Existing concrete at base and top of column are to remain, receive paint finish to match new interior colors. Replace column covers.

24. Question: Wall Finish Discrepancy A2.27 Men Restroom elevations do not show any Fiber

Reinforced Laminate (FRL). A2.45 Exhibit Level Wall Finish indicates FRL in the Men Restroom. A/E please verify.

Response: Refer to Sheet A2.28 for FRL layout.

25. Question: Ceiling Detail A3.22 shows USG “Libretto” Gridless Metal Ceiling (C-4) documents do not clearly show the transition between the different heights. A/E please provide a detail showing the vertical detail between the different heights.

Response: Each C-4 ceiling in Vestibule area is floating separately from each other. No vertical transition detail required. See screenshot below for reference.

26. Question: Cashwrap A8.01 indicates “Shown for Reference”. A/E please confirm the Cashwrap is Not Included in this bid.

Response: Cashwrap is shown for reference only and is not included in this requirement.

This will be provided by the retail operator.

27. Question: Sheet E3.01 at the Media wall shows floor boxes for duplex and V/D. A/E please confirm floor boxes are correct.

Response: Power for media wall should be inside the new wall, not in the floor. Contractor can pull power from existing power in floor, or in ceiling.

28. Question: Sheet A2.45 Reception 221 indicates 03 “megawall slatewall panel 4’x8’ typ.” Documents do not clearly show the elevation(s) to determine quantity. A/E please provide elevation details in the reception 221 area.

Response: Sheet A3.22 indicates ceiling height in Reception 221 and Vestibule 220. See attached screenshots below for reference.

29. Question: Clarification Addendum 0001 Attachment_9_-_Design_Drawings_0001 – Sheet

X0.200 is the floor finishes in the exhibit area by GC unless noted by Exhibit Contractor (by Owner). A/E please confirm.

Response: Sheet X0.200 indicates extent of new flooring to be installed per the Exhibit Contractor in the Exhibit area. Sheet A2.41 indicates the extent of the new flooring to be installed per the Building Contractor in the remainder of the Exhibit Level.

30. Question: Addendum 0001 Sheet X0.300 do not show plywood requirements type, size, height, etc. A/E please advise.

Response: The plywood is meant to allow attachments into the wall without anchors and is part of the Building Contractor’s scope. Please use 5/8” ply. Softwood or structural products are best as they need to bite, and grade C or D are acceptable as this will be hidden behind a gypsum wall board layer. Refer to revised sheet X0.300.

31. Question: Addendum 0001 Attachment_9_-_Design_Drawings_0001 – Sheet AV 001, Audio Video (AV) Integrator states, “The AV Integrator shall be included by all bidding contractors.” A/E please confirm all A/V is by GC. If by GC, A/E please provide A/V specifications.

Response: A/V is per Exhibit Contractor. Power for A/V, as indicated in A/E Electrical sheets, is required by General Contractor and should be included within this proposal.

32. Question: Addendum 0001 If A/V contractor is by Owner. A/E please clarify A/V requirements.

Response: A/V is per Exhibit Contractor. Power for A/V, as indicated in A/E Electrical sheets, is per GC and should be part of the building bid.

33. Question: Addendum 0001 Attachment_9_-_Design_Drawings_0001 do not clearly show responsibly of the exhibit area. Please confirm all exhibit drawing are by Exhibit Contractor (by Owner) except for RFI 028 and 029. A/E please confirm.

Response: Exhibit drawings are by Exhibit Contractor, with exception of response to Question 30 which indicates base building finishing requirements in the Exhibit Gallery that are required by the Exhibit Contractor. The building contractor is responsible for both the base building finishes on walls and the terrazzo in the exhibit gallery area.

34. Question: Specification Section 096623 calls for "Precast Terrazzo Stair Units". Existing

Terrazzo stairs on lower level are "Cast in Place Terrazzo Treads and risers with an integral coved wall base and outer waterfall edge". This cannot be matched using precast stair units. Please confirm that these are to be precast stair units without the matching integral coved wall base and outer waterfall edge.

Response: New stair treads are to be precast stair units without the matching integral coved wall base and outer waterfall edge.

This page left intentionally blank

Response – Data on the proposed substitution must be submitted for review and consideration. The product must be red-list free, as well as match the finish and maintenance requirements of the biopolymer terrazzo.