B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part6.pdf

PDF 11 MB Posted

Attached to
GRCA 318719 North Rim & Springs Rehabilitation Pro
Solicitation number
140PP027R0005
Issued by
Not on record

About this file

These are construction and site planning documents for the North Rim of Grand Canyon National Park, prepared by HDR Engineering, Inc., located in Denver, Colorado. The documents consist of detailed site plans and aerial photographs showing the contractor support facilities and staging areas required for construction activities at the North Rim.

The first sheet depicts the CSF Helicopter Staging Area (South Rim) with keynotes identifying specific facility locations and access routes. Key infrastructure includes a contractor support facility approximately 2.25 miles north of the park's south entrance, with designated areas for gravel laydown yards, concrete helicopter landing pads, and utility infrastructure for contractor use. The plan specifies driving directions to the facility via State Route 64 and identifies a 0.75-mile access road to the support facilities. Supporting photographs show NPS helipads and CMS hanger facilities. The second sheet presents an aerial view of the Lindbergh Hill Construction Camp area, identifying the limits of construction, existing RV sites, additional RV sites without electrical hookups, gravel access road, and a construction and support trailer area. General notes establish requirements for year-round camping with self-contained units, snow removal responsibilities, road maintenance, and access protocols to other park facilities. These plans appear to be part of a larger federal contract solicitation for construction work at Grand Canyon National Park but do not themselves constitute a request for proposals or statement of work.

View the file

Other files

File Type Posted
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part7.pdf PDF
B08_140PP027R0005.pdf PDF
B08_Attach_10_GRCA_318719_Innercanyon_GIR_20250811.pdf PDF
B08_Attach_04_CLIN_Price_Sheet_-_Services.xlsx XLSX spreadsheet
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part5.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part8.pdf PDF
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part8.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part14.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_03_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_06_20261012.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_01_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part5.pdf PDF
B08_Attach_05_Solit_PSP_Vol_II_SubKPlan_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_10_20261012.pdf PDF
Sol_140PP027R0005.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_02_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part7.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_11_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part9.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part3.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part9.pdf PDF
B08_Attach_09_GRCA_318719_GISR_20260331.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part3.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_B_(Div_02-23)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part11.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_09_20261012.pdf PDF
B08_Attach_12_Site_Visit_Attendee_List.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_12_20261012.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_C_(Div_26-46)_20261012.pdf PDF
B08_Attach_11_GRCA_318719_North_Rim_GIR_20250811.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_08_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_04_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part15.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part13.pdf PDF
B08_Attach_03_Wage_Determintation.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part11.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim__Vol_A_(Div_01)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part12.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTH RIM - GRAND CANYON NATIONAL PARK

DENVER, CO 80202

HDR ENGINEERING, INC.

NORTH RIM - GRAND CANYON NATIONAL PARK

DENVER, CO 80202

HDR ENGINEERING, INC.

VOLUME 0 GENERAL
000 - GENERAL SHEETS
000 G107 - NORTH RIM CSF HELICOPTER STAGING AREA (SOUTH RIM)
000 G108 - NORTH RIM LINDBERGH HILL CONSTRUCTION CAMP
000 G110 - NORTH RIM DOTTONWOOD CAMPGROUND CONSTRUCTION CAMP
000 G111 - NORTH RIM NORTON CT CAMPGROUND CONSTRUCTION CAMP
001 G120 - CONTRACTOR STAGING AND WTP ACCESS PLAN
001 G122 - CONTRACTOR STAGING AND ACCESS PLAN BALLFIELD SITE
002 - CIVIL GENERAL SHEETS
002 C001 - GENERAL NOTES, ABBREVIATIONS, AND LEGEND CIVIL
002 C101 - SURVEY POTHOLE PLAN (NORTH RIM)
002 C102 - SURVEY POTHOLE TABLE (NORTH RIM)

File details come from the government source that posted it. Updated .