This is a Contract Line Item (CLIN) Price Sheet for services related to the rehabilitation of North Rim utility infrastructure at Grand Canyon National Park under solicitation 140PP027R0005. The National Park Service Denver Service Center is procuring work organized into ten main contract line items covering pipelines, pumphouse facilities, water treatment, power distribution, and wastewater systems across multiple volumes. The base scope includes VOL 1 through VOL 6 and VOL 9 through VOL 10 as lump-sum line items, with VOL 2 subdivided into nine CLINs addressing personnel deployment, site setup, equipment removal, labor/services/equipment rentals, materials, and eight event-based contingency hours for drilling complications (intersecting voids, casing advancement issues, excessive drilling medium/cement loss, subsurface fluid influx, and stuck pipe removal). Three optional line items are available: VOL 8 (North Rim Wastewater Collection System), VOL 11 (Power Distribution to Manzanita), and VOL 12 (Power Distribution to Cottonwood Campground).
Offerors must submit pricing conforming to all base and option line items, with unit prices and extended totals required for hour-based CLINs and total prices only for lump-sum items. Event-based CLINs (0020.6 through 0020.11) require prior Contracting Officer eligibility determination before compensable time accrues, with documentation requirements specified in Section 01 27 00 of the project specifications. In case of calculation discrepancies, unit prices govern individual items while corrected summation totals govern overall contract pricing. All totals and extended prices must be rounded to whole dollars.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule
| Overall Project | |||||
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140PP027R0005 | ||||
| PARK - PMIS: | GRCA 318719 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Grand Canyon National Park | ||||
| Project Title: | Rehabilitate North Rim Utility Infrastructure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 0010 | VOL 1 - Pipelines - North Rim | 1 | LS | $ | $ |
| 0020 | VOL 2 - Pipelines - North Rim to Roaring Springs Pumphouse | Do not use | Do not use | Do not use | Do not use |
| 0020.1 | Personnel Deployment | 1 | LS | $ | $ |
| 0020.2 | Initial Setup (Ready to Drill) | 1 | LS | $ | $ |
| 0020.3 | Equipment Removal | 1 | LS | $ | $ |
| 0020.4 | Labor/Services/Equipment/Rentals | 1 | LS | $ | $ |
| 0020.5 | Materials | 1 | LS | $ | $ |
| 0020.6 | Intersecting a Void While Drilling | 180 | Hours | $ | $ |
| 0020.7 | Intersecting a Void While Advancing Casing | 150 | Hours | $ | $ |
| 0020.8 | Excessive Loss of Drilling Medium to Formation | 120 | Hours | $ | $ |
| 0020.9 | Excessive Loss of Cement to Formation | 120 | Hours | $ | $ |
| 0020.10 | Subsurface Fluid Influx | 90 | Hours | $ | $ |
| 0020.11 | Stuck Drill Pipe Following Exit from Canyon Wall | 60 | Hours | $ | $ |
| 0030 | VOL 3 - Pipelines - North Rim to Supai Tunnel | 1 | LS | $ | $ |
| 0040 | VOL 4 - Pipelines - Roaring Springs Cave to Roaring Springs Pumphouse | 1 | LS | $ | $ |
| 0050 | VOL 5 - Roaring Springs Pumphouse | 1 | LS | $ | $ |
| 0060 | VOL 6 - North Rim Water Treatment Plant | 1 | LS | $ | $ |
| 0070 | VOL 7 - Not Used | Not Used | Not Used | Not Used | Not Used |
| 0090 | VOL 9 -Power Distribution - North Rim | 1 | LS | $ | $ |
| 0100 | VOL 10 -Power Distribution - North Rim to Roaring Springs Pumphouse | 1 | LS | $ | $ |
| TOTAL BASE - PROPOSED PRICE | |||||
| 0080 | OPTION 1 - VOL 8 -North Rim Wastewater Collection System | 1 | Lump Sum | $ | $ |
| 0110 | OPTION 2 - VOL 11 -Power Distribution - Roaring Springs Pumphouse to Manzanita | 1 | Lump Sum | $ | $ |
| 0120 | OPTION 3 - VOL 12 -Power Distribution - Cottonwood Campground | 1 | Lump Sum | $ | $ |
| TOTAL OPTIONS - PROPOSED PRICE | $ | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS | $ | ||||
| All measurement and payment information are included in the project specifications, Section 01 27 00. |
Event based CLINs (0020.6 to 0020.11) require prior Contracting Officer (CO) eligibility determination. Compensable time begins only upon CO determination, and documentation must follow Section 01 27 00