This file consists of civil engineering plans and specifications for construction work at the North Rim of Grand Canyon National Park, prepared by HDR Engineering, Inc. and located in Denver, Colorado. The documents include detailed site plans, contractor staging and access plans, and comprehensive civil mapping symbology with materials, utility, and civil line legend information.

The plans depict the Norton Court Construction Camp and associated facilities, with specific delineation of limits of construction, contractor staging areas, temporary construction entrance locations, and equipment material storage zones. Key site features include two water storage tanks, the North Rim Water Treatment Plant, existing asphalt access areas, and designated areas for construction equipment parking and material laydown. The contractor is required to provide traffic control for National Park Service operations during construction activities and maintain access on all existing paved areas around the EMS building. All construction staging areas, temporary entrances, and work zones must be cleared of existing trees and vegetation, with quantities of approximately 200 tons of material to be removed and disposed of per specifications after construction completion. The plans specify that seasonal camping is acceptable at designated locations, full hookups are available May through October, and 3 of 5 available sites are designated for contractor use. Traffic access provisions and site restoration requirements are clearly marked on the mapping symbology sheets, which serve as the foundational reference for all construction-related civil engineering work on this federal project within Grand Canyon National Park.

View the file

Other files

File Type Posted
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part7.pdf PDF
B08_140PP027R0005.pdf PDF
B08_Attach_10_GRCA_318719_Innercanyon_GIR_20250811.pdf PDF
B08_Attach_04_CLIN_Price_Sheet_-_Services.xlsx XLSX spreadsheet
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part5.pdf PDF
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part8.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part14.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_03_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_06_20261012.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_01_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part5.pdf PDF
B08_Attach_05_Solit_PSP_Vol_II_SubKPlan_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_10_20261012.pdf PDF
Sol_140PP027R0005.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_02_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part7.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_11_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part9.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part3.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part9.pdf PDF
B08_Attach_09_GRCA_318719_GISR_20260331.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part3.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_B_(Div_02-23)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part11.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_09_20261012.pdf PDF
B08_Attach_12_Site_Visit_Attendee_List.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_12_20261012.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_C_(Div_26-46)_20261012.pdf PDF
B08_Attach_11_GRCA_318719_North_Rim_GIR_20250811.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_08_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_04_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part15.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part13.pdf PDF
B08_Attach_03_Wage_Determintation.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part11.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim__Vol_A_(Div_01)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part12.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .