B08_Attach_02_North_Rim_Final_CDs_Volume_03_20261012.pdf

PDF 5 MB Posted

Attached to
GRCA 318719 North Rim & Springs Rehabilitation Pro
Solicitation number
140PP027R0005
Issued by
Not on record

About this file

This document is a set of technical design sheets for Volume 3 (Pipelines – North Rim to Supai Tunnel) of the North Rim Infrastructure Rehabilitation project at Grand Canyon National Park, a UNESCO World Heritage Site. The drawings were prepared by HDR Engineering, Inc., Denver, Colorado, and dated August 2026, with design by N. Humphrey, technical review by B. Luster, and PM Matthew Gough.

The design package includes 19 sheets detailing the freshwater pipeline system extending from North Rim Water Treatment Plant to Supai Tunnel Bottle Fill Station. Key infrastructure components include hydraulic profile and valve schedules; site demolition and erosion control plans; plan and profile sheets covering the pipeline alignment from Station 301+00 to 332+09; enlarged plans for Supai Rest Area pressure reducing valve (PRV) assembly and water filling stations; water spigot and bottle filling station details; air relief valve vault assembly details; and pipeline anchor details. The pipeline consists of 2-inch composite pipe at 4-inch offset from existing 3.5-inch steel waterline, with installation of rock anchors at maximum 275-foot spacing and pipe anchors at 275-foot maximum spacing. Pressure reducing valve located at Supai Rest Area maintains 100/40 PSI inlet/outlet pressure settings. Construction limits show 25-foot width allocations on both sides of the pipeline centerline. Detailed cross-sections, location tables, and specifications for vault assemblies, resthouse connections, and drainage provisions are provided to guide contractor installation and compliance with National Park standards.

View the file

Other files

File Type Posted
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part7.pdf PDF
B08_140PP027R0005.pdf PDF
B08_Attach_10_GRCA_318719_Innercanyon_GIR_20250811.pdf PDF
B08_Attach_04_CLIN_Price_Sheet_-_Services.xlsx XLSX spreadsheet
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part5.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part8.pdf PDF
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part8.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part14.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_06_20261012.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_01_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part5.pdf PDF
B08_Attach_05_Solit_PSP_Vol_II_SubKPlan_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_10_20261012.pdf PDF
Sol_140PP027R0005.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_02_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part7.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_11_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part9.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part3.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part9.pdf PDF
B08_Attach_09_GRCA_318719_GISR_20260331.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part3.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_B_(Div_02-23)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part11.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_09_20261012.pdf PDF
B08_Attach_12_Site_Visit_Attendee_List.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_12_20261012.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_C_(Div_26-46)_20261012.pdf PDF
B08_Attach_11_GRCA_318719_North_Rim_GIR_20250811.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_08_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_04_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part15.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part13.pdf PDF
B08_Attach_03_Wage_Determintation.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part11.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim__Vol_A_(Div_01)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part12.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME # DESCRIPTION

VOLUME 0 GENERAL

VOLUME 1 PIPELINES - NORTH RIM

VOLUME 2 PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 4 PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 5 ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 6 NORTH RIM WATER TREATMENT PLANT

VOLUME 7 NOT USED

VOLUME 8 NORTH RIM WASTEWATER COLLECTION SYSTEM

VOLUME 9 POWER DISTRIBUTION - NORTH RIM

VOLUME 10 POWER DISTRIBUTION - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 11 POWER DISTRIBUTION - ROARING SPRINGS PUMPHOUSE (RSPH) TO MANZANITA

VOLUME 12 POWER SYSTEM - COTTONWOOD CAMPGROUND

VOLUME 3 PIPELINES - NORTH RIM TO SUPAI TUNNEL

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

A/E FIRM

PRIME:

DENVER, CO 80202

HDR ENGINEERING, INC.

A u to d e s k D o c s /1

N P

S

G R

C A

N

R im U ti lit y

/1

G

E N

E R

A L

.r v t

/7

/2

:2

:0

P M

G001

NORTH RIM - GRAND CANYON NATIONAL PARK

318719

SHEET INDEX

N. HUMPHREY

B. LUSTER

AUG 2026

N. LYNCH

182752030

GENERAL

REHABILITATE NORTH RIM

INFRASTRUCTURE

VOLUME 3 - PIPELINES - NORTH RIM TO SUPAI TUNNEL

WORLD HERITAGE SITE

GRAND CANYON NATIONAL PARK

UNESCO

SHEET SUB SHEET SUB AREA TITLE OF SHEET

1 030G001 GENERAL SHEET INDEX

2 030C101 GENERAL SITE PLAN

3 030D101 GENERAL SUPAI FW HYDRAULIC PROFILE AND VALVE SCHEDULE

4 031X101 FW PIPELINE SITE DEMOLITION PLAN

5 031C101 FW PIPELINE GESC PLAN

6 031C102 FW PIPELINE SHEET MAP

7 031C103 FW PIPELINE PLAN AND PROFILE STA 301+00 TO STA 301+50

8 031C104 FW PIPELINE PLAN AND PROFILE STA 301+50 TO STA 306+95

9 031C105 FW PIPELINE PLAN AND PROFILE STA 306+95 TO STA 312+04

10 031C106 FW PIPELINE PLAN AND PROFILE STA 312+04 TO STA 320+71

11 031C107 FW PIPELINE PLAN AND PROFILE STA 320+71 TO STA 329+00

12 031C108 FW PIPELINE PLAN AND PROFILE STA 329+00 TO STA 322+09

13 031C401 FW PIPELINE SUPAI REST AREA PRV ENLARGED PLAN

14 031C402 FW PIPELINE SUPAI REST AREA WATER FILLING STATIONS ENLARGED PLAN

15 031C501 FW PIPELINE WATER SPIGOT AND BOTTLE FILLING STATION DETAILS

16 031C502 FW PIPELINE AIR RELIEF VALVE VAULT ASSEMBLY PLAN AND SECTIONS

17 031C503 FW PIPELINE RESTHOUSE VAULT ASSEMBLY PLAN AND SECTIONS

18 031C901 FW PIPELINE PHOTO DETAILS

19 031S501 FW PIPELINE PIPELINE ANCHOR DETAILS

GOUGH/LUSTERM. GOUGH

2NORTH RIM - GRAND CANYON NATIONAL PARK 19

DENVER, CO 80202

HDR ENGINEERING, INC.

GOUGH/LUSTER

3NORTH RIM - GRAND CANYON NATIONAL PARK 19

4NORTH RIM - GRAND CANYON NATIONAL PARK 19

SF

CF

SCL

SFSF

CFCF

SCL

5NORTH RIM - GRAND CANYON NATIONAL PARK 19

DENVER, CO 80202

6NORTH RIM - GRAND CANYON NATIONAL PARK 19

7NORTH RIM - GRAND CANYON NATIONAL PARK 19

8NORTH RIM - GRAND CANYON NATIONAL PARK 19

9NORTH RIM - GRAND CANYON NATIONAL PARK 19

10NORTH RIM - GRAND CANYON NATIONAL PARK 19

11NORTH RIM - GRAND CANYON NATIONAL PARK 19

12NORTH RIM - GRAND CANYON NATIONAL PARK 19

13NORTH RIM - GRAND CANYON NATIONAL PARK 19

14NORTH RIM - GRAND CANYON NATIONAL PARK 19

15NORTH RIM - GRAND CANYON NATIONAL PARK 19

16NORTH RIM - GRAND CANYON NATIONAL PARK 19

PRIME:

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

DENVER, CO 80202

72"x48"x36" POLYMER

CONCRETE VAULT

WITH DOUBLE DOOR,

72"x48" TORSION

ASSIST LOCKING LID

1" SCH 40 GLV

STL TO EXIST

FILLING

STATION

FROM WATER

TREATMENT

PLANT

DRAIN

TO WATER

SPIGOT

A

031C503

B

031C503

1' MIN

C

031C503

3' - 0"

60"x48"x36" POLYMER

CONCRETE VAULT WITH

DOUBLE DOOR, 60"x48"

TORSION ASSIST LOCKING LID

2" COMPOSITE (W3)

1" SCH 40 GLV STL

M

IN

M

IN

MIN

1' - 0"

1' - 0"

MIN

12"2' 2'

TO FOUNDATION

6830.42

VAULT BOTTOM

6827.42

1" THD BALL VALVE

1" SCH 40 GLV STL

TO WATER SPIGOT

1/2" THD BALL VALVE W/ 1/2"

PRESSURE GAUGE

CL 6828.00

DRAIN

M

IN6

TO FOUNDATION

6830.42

VAULT BOTTOM

6827.42

1" THD CHECK VALVE

1" THD TEE

1" SCH 40 GLV STL

TO EXIST FILLING

STATION

1" THD BALL VALVE

1" THD TEE

TO DRAIN, SEE SECTION C

TO WATER SPIGOT,

SEE SECTION A

1" RESTRAINED

EXPANSION JOINT

FROM WATER

TREATMENT

PLANT

2"x1" FLGxTHD

SST REDUCER

1" SCH 80 SST PIPE

(7" MIN LENGTH) W/

1/2" THREAD-O-LET

1/2" THD BALL VALVE W/

1/2" PRESSURE

GAUGE (TYP OF 2)

1" SCH 80 SST THD

WYE STRAINER

1" PRV-1

M

IN6

1" SCH 80 SST

THD NIPPLE

PIPE SUPPORT

18"x18"x4" CONCRETE

PIPE SUPPORT PAD

1" RESTRAINED EXPANSION

JOINT W/ INSULATING KIT

(CLASS 300 FLG)

1" SCH 80 GALV

STL W/ THD FLG

1" CLASS 300

THD FLG

031C501

SCH 80 PVC

1" SCH 80 GALV ST

PIPE W/ 1/2"

THREAD-O-LET

PIPE SUPPORT

M

IN6

18"x18"x4"

CONCRETE PIPE

SUPPORT PAD

1" CLASS 300

THD FLG

CL 6828.02

1" SCH 80 SST THD

NIPPLE W/ CL 300

SST THD FLG

TO FOUNDATION

6830.42

VAULT BOTTOM

6827.42

1" THD CHECK VALVE

DRAIN 1

IE 6827.53

1" THD 90 DEG ELBOW

ASCALE 1" = 1'-0"

1 0 1 2

SCALE OF FEET

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

A/E FIRM

PRIME:

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

A u to d e s k D o c s /1

N P

S

G R

C A

N

R im U ti lit y

/1

P

R V

V A

U L T

U

.r v t

/1

/2

:1

:2

P M

C503

NORTH RIM - GRAND CANYON NATIONAL PARK

318719

RESTHOUSE VAULT

ASSEMBLY PLAN AND

SECTIONS

N. HUMPHREY

B. LUSTER

MAY 2026

C. CONFER

182752031

FW PIPELINE

SCALE A

031C503

1 PRV VAULT PLAN

GENERAL NOTES

SUPAI TUNNEL REST AREA 690/100

LOCATION PRV 1 (PSI)

INLET PRESSURE/OUTLET PRESSURE SETTING SCHEDULE

SCALE A

031C503

A SECTION

SCALE A

031C503

B SECTION

KEY NOTES X

SCALE A

031C503

C SECTION

A. INLET PRESSURES SHOWN IN THE SCHEDULE

ARE BASED ON NORMAL OPERATING FLOW.

OUTLET PRESSURE SETTINGS ARE THE SAME

FOR ALL FLOW CONDITIONS.

B. CONTRACTOR / MFR TO EVALUATE &

DETERMINED PRV SIZING AND CONNECTIONS

FOR THE PRODUCT BEING SUPPLIED BASED ON

REQUIREMENTS SHOWN IN SCHEDULE.

C. PIPE, VALVE & FITTING SIZE TO MATCH SIZE OF

PRV SUPPLIED.

1. SEE 031C401 FOR CONTINUATION OF PIPING.

17NORTH RIM - GRAND CANYON NATIONAL PARK 19

DENVER, CO 80202

19198NORTH RIM - GRAND CANYON NATIONAL PARK

19NORTH RIM - GRAND CANYON NATIONAL PARK 19

R e g is t e r e d

P r of essional En g in e e r

(C iv il)

A

RIZONA, U.S

.A

CE

RT

IFICATE NO.

D a t e Signed ...

22198

NICHOLAS J.

LAFRONZ

5- 1-

DENVER, CO 80202

VOLUME 3 - PIPELINES - NORTH RIM TO SUPAI TURNNEL
030 - GENERAL SHEETS
030 G001 - SHEET INDEX
030 C101 - SITE PLAN
030 D101 - SUPAI FW HYDRAULIC PROFLE AND VALVE SCHEDULE
031 FW PIPELINE DEMOLITION
031 X101 - SITE DEMOLITION PLAN
031 FW PIPELINE SHEETS
031 C101 - GESC PLAN
031 C102 - SHEET MAP
031 C103 - PLAN AND PROFILE STA 301+00 TO STA 301+50
031 C104 - PLAN AND PROFILE STA 3014-50 TO 3064-95
031 C105 - PLAN AND PROFILE STA 3064-95 TO 3124-04
031 C106 - PLAN AND PROFILE STA 312+04 TO 320+71
031 C107 - PLAN AND PROFILE STA 320+71 TO 329+00
031 C108 - PLAN AND PROFILE STA 3294-00 TO 3324-09
031 C401 - SUPAI REST AREA PRV ENLARGED PLAN
031 C402 - SUPAI REST AREA WATER FILLING STATIONS ENLARGED PLAN
031 FW PIPELINE DETAILS
031 C501 - WATER SPIGOT AND BOTTLE FILLING STATION DETAILS
031 C502 - AIR RELIEF VALVE VAULT ASSEMBLY PLAN AND SECTIONS
031 C503 - RESTHOUSE VAULT ASSEMBLY PLAN AND SECTIONS
031 C901 - PHOTO DETAILS
031 S501 - PIPELINE ANCHOR DETAILS

File details come from the government source that posted it. Updated .