This document is a set of design drawings and construction specifications for the North Rim Infrastructure Rehabilitation project at Grand Canyon National Park, a UNESCO World Heritage Site. The project focuses on Volume 2, which encompasses pipelines connecting the North Rim to the Roaring Springs Pumphouse (RSPH). The drawings, prepared by HDR Engineering, Inc. (prime) with GEI Consultants as a subconsultant, include detailed hydraulic profiles for raw and finished water systems, bore alignment and profile overviews, wellhead and drilling cellar details, and terminus and casing spacer specifications. The project involves a horizontal directional bore operation with entry and exit sites, protective matting and sandbag embankment plans, and comprehensive utility infrastructure design. Design dates are reflected as August 2026, with drawings numbered according to volume and sheet designations (e.g., 021C401, 021C502, 021C503).
Key technical specifications include casing and pipe dimensions with materials ranging from steel to various grades, design flow rates of 40 gallons per minute (GPM) through a 1,000-foot pipe section, and pump shutoff head elevation at 8,815 feet. The bore profile extends approximately 140 horizontal feet with depth considerations through multiple geological formations including Kaibab, Toroweap, and Coconino formations, with build rates specified at 3°/100 feet in certain sections. General notes emphasize contractor coordination with the National Park Service, sensitive resource area protection, and requirements for surveying borehole locations prior to drilling. The construction limits are precisely defined with northing and easting coordinates provided for all key points.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME # DESCRIPTION
VOLUME 0 GENERAL
VOLUME 1 PIPELINES - NORTH RIM
VOLUME 3 PIPELINES - NORTH RIM TO SUPAI TUNNEL
VOLUME 4 PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)
VOLUME 5 ROARING SPRINGS PUMPHOUSE (RSPH)
VOLUME 6 NORTH RIM WATER TREATMENT PLANT
VOLUME 7 NOT USED
VOLUME 8 NORTH RIM WASTEWATER COLLECTION SYSTEM
VOLUME 9 POWER DISTRIBUTION - NORTH RIM
VOLUME 10 POWER DISTRIBUTION - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)
VOLUME 11 POWER DISTRIBUTION - ROARING SPRINGS PUMPHOUSE (RSPH) TO MANZANITA
VOLUME 12 POWER SYSTEM - COTTONWOOD CAMPGROUND
VOLUME 2 PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
A/E FIRM
PRIME:
DENVER, CO 80202
HDR ENGINEERING, INC.
A u to d e s k D o c s /1
N P
S
G R
C A
N
R im U ti lit y
/1
G
E N
E R
A L
.r v t
/7
/2
:1
:5
P M
G001
NORTH RIM - GRAND CANYON NATIONAL PARK
318719
SHEET INDEX
A. PRING
P. BEARDEN
AUG 2026
N LYNCH
182752020
GENERAL
REHABILITATE NORTH RIM
INFRASTRUCTURE
VOLUME 2 - PIPELINES - NORTH RIM TO ROARING SPRINGS
PUMPHOUSE (RSPH)
WORLD HERITAGE SITE
GRAND CANYON NATIONAL PARK
UNESCO
SHEET SUB SHEET SUB AREA TITLE OF SHEET
1 020G001 GENERAL SHEET INDEX
2 020D101 UTILITIES RAW WATER HYDRAULIC PROFILE
3 020D102 UTILITIES FINISHED WATER HYDRAULIC PROFILE
4 021C103 UTILITIES BORE ALIGNENT OVERVIEW
5 021C104 UTILITIES BORE PROFILE OVERVIEW
6 021C105 UTILITIES BORE PROFILE OVERVIEW
7 021C401 UTILITIES BORE ENTRY SITE LAYOUT
8 021C402 UTILITIES BORE RECEIVING SITE LAYOUT AND EQUIPMENT STAGING PLAN
9 021C502 UTILITIES WELLHEAD AND DRILLING CELLAR DETAIL
10 021C503 UTILITIES TERMINUS AND CASING SPACER DETAILS
M. GOUGH
2 10NORTH RIM - GRAND CANYON NATIONAL PARK
PRIME:
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
DENVER, CO 80202
HDR ENGINEERING, INC.
NORTH RIM - GRAND CANYON NATIONAL PARK 3 10
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
NORTH RIM - GRAND CANYON NATIONAL PARK 4 10
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
NORTH RIM - GRAND CANYON NATIONAL PARK 5 10
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
NORTH RIM - GRAND CANYON NATIONAL PARK 6 10
NORTH RIM - GRAND CANYON NATIONAL PARK 7 10
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
NORTH RIM - GRAND CANYON NATIONAL PARK 8 10
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
NORTH RIM - GRAND CANYON NATIONAL PARK 9 10
PM: MATTHEW GOUGH
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
DENVER, CO
HDR ENGINEERING, INC.
SUB:
GOLDEN, CO
GEI CONSULTANTS
NORTH RIM - GRAND CANYON NATIONAL PARK 10 10
| VOLUME 2 - PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH) |
| 020 - GENERAL SHEETS |
| 020 G001 - SHEET INDEX |
| 020 D101 - BORE B - RAW WATER HYDRAULIC PROFILE |
| 020 D102 - BORE A - FINISHED WATER HYDRAULIC PROFILE |
| 021 BORE SHEETS |
| 021 C103 - BORE ALIGNMENT OVERVIEW |
| 021 C104 - BORE B PROFILE OVERVIEW |
| 021 C105 - BORE A PROFILE OVERVIEW |
| 021 C401 - BORE ENTRY SITE LAYOUT |
| 021 C402 - BORE RECEIVING SITE LAYOUT AND EQUIPMENT STAGING PLAN |
| 021 BORE DETAILS |
| 021 C502 - WELLHEAD AND DRILLING CELLAR DETAIL |
| 021 C503 - TERMINUS AND CASING SPACER DETAILS |