About this file

This document is a set of design drawings and construction specifications for the North Rim Infrastructure Rehabilitation project at Grand Canyon National Park, a UNESCO World Heritage Site. The project focuses on Volume 2, which encompasses pipelines connecting the North Rim to the Roaring Springs Pumphouse (RSPH). The drawings, prepared by HDR Engineering, Inc. (prime) with GEI Consultants as a subconsultant, include detailed hydraulic profiles for raw and finished water systems, bore alignment and profile overviews, wellhead and drilling cellar details, and terminus and casing spacer specifications. The project involves a horizontal directional bore operation with entry and exit sites, protective matting and sandbag embankment plans, and comprehensive utility infrastructure design. Design dates are reflected as August 2026, with drawings numbered according to volume and sheet designations (e.g., 021C401, 021C502, 021C503).

Key technical specifications include casing and pipe dimensions with materials ranging from steel to various grades, design flow rates of 40 gallons per minute (GPM) through a 1,000-foot pipe section, and pump shutoff head elevation at 8,815 feet. The bore profile extends approximately 140 horizontal feet with depth considerations through multiple geological formations including Kaibab, Toroweap, and Coconino formations, with build rates specified at 3°/100 feet in certain sections. General notes emphasize contractor coordination with the National Park Service, sensitive resource area protection, and requirements for surveying borehole locations prior to drilling. The construction limits are precisely defined with northing and easting coordinates provided for all key points.

View the file

Other files

File Type Posted
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part7.pdf PDF
B08_140PP027R0005.pdf PDF
B08_Attach_10_GRCA_318719_Innercanyon_GIR_20250811.pdf PDF
B08_Attach_04_CLIN_Price_Sheet_-_Services.xlsx XLSX spreadsheet
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part5.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part8.pdf PDF
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part8.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part14.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_03_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_06_20261012.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_01_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part5.pdf PDF
B08_Attach_05_Solit_PSP_Vol_II_SubKPlan_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_10_20261012.pdf PDF
Sol_140PP027R0005.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part7.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_11_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part9.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part3.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part9.pdf PDF
B08_Attach_09_GRCA_318719_GISR_20260331.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part3.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_B_(Div_02-23)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part11.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_09_20261012.pdf PDF
B08_Attach_12_Site_Visit_Attendee_List.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_12_20261012.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_C_(Div_26-46)_20261012.pdf PDF
B08_Attach_11_GRCA_318719_North_Rim_GIR_20250811.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_08_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_04_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part15.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part13.pdf PDF
B08_Attach_03_Wage_Determintation.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part11.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim__Vol_A_(Div_01)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part12.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME # DESCRIPTION

VOLUME 0 GENERAL

VOLUME 1 PIPELINES - NORTH RIM

VOLUME 3 PIPELINES - NORTH RIM TO SUPAI TUNNEL

VOLUME 4 PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 5 ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 6 NORTH RIM WATER TREATMENT PLANT

VOLUME 7 NOT USED

VOLUME 8 NORTH RIM WASTEWATER COLLECTION SYSTEM

VOLUME 9 POWER DISTRIBUTION - NORTH RIM

VOLUME 10 POWER DISTRIBUTION - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 11 POWER DISTRIBUTION - ROARING SPRINGS PUMPHOUSE (RSPH) TO MANZANITA

VOLUME 12 POWER SYSTEM - COTTONWOOD CAMPGROUND

VOLUME 2 PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

A/E FIRM

PRIME:

DENVER, CO 80202

HDR ENGINEERING, INC.

A u to d e s k D o c s /1

N P

S

G R

C A

N

R im U ti lit y

/1

G

E N

E R

A L

.r v t

/7

/2

:1

:5

P M

G001

NORTH RIM - GRAND CANYON NATIONAL PARK

318719

SHEET INDEX

A. PRING

P. BEARDEN

AUG 2026

N LYNCH

182752020

GENERAL

REHABILITATE NORTH RIM

INFRASTRUCTURE

VOLUME 2 - PIPELINES - NORTH RIM TO ROARING SPRINGS

PUMPHOUSE (RSPH)

WORLD HERITAGE SITE

GRAND CANYON NATIONAL PARK

UNESCO

SHEET SUB SHEET SUB AREA TITLE OF SHEET

1 020G001 GENERAL SHEET INDEX

2 020D101 UTILITIES RAW WATER HYDRAULIC PROFILE

3 020D102 UTILITIES FINISHED WATER HYDRAULIC PROFILE

4 021C103 UTILITIES BORE ALIGNENT OVERVIEW

5 021C104 UTILITIES BORE PROFILE OVERVIEW

6 021C105 UTILITIES BORE PROFILE OVERVIEW

7 021C401 UTILITIES BORE ENTRY SITE LAYOUT

8 021C402 UTILITIES BORE RECEIVING SITE LAYOUT AND EQUIPMENT STAGING PLAN

9 021C502 UTILITIES WELLHEAD AND DRILLING CELLAR DETAIL

10 021C503 UTILITIES TERMINUS AND CASING SPACER DETAILS

M. GOUGH

2 10NORTH RIM - GRAND CANYON NATIONAL PARK

PRIME:

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

DENVER, CO 80202

HDR ENGINEERING, INC.

NORTH RIM - GRAND CANYON NATIONAL PARK 3 10

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

NORTH RIM - GRAND CANYON NATIONAL PARK 4 10

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

NORTH RIM - GRAND CANYON NATIONAL PARK 5 10

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

NORTH RIM - GRAND CANYON NATIONAL PARK 6 10

NORTH RIM - GRAND CANYON NATIONAL PARK 7 10

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

NORTH RIM - GRAND CANYON NATIONAL PARK 8 10

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

NORTH RIM - GRAND CANYON NATIONAL PARK 9 10

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

DENVER, CO

HDR ENGINEERING, INC.

SUB:

GOLDEN, CO

GEI CONSULTANTS

NORTH RIM - GRAND CANYON NATIONAL PARK 10 10

VOLUME 2 - PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)
020 - GENERAL SHEETS
020 G001 - SHEET INDEX
020 D101 - BORE B - RAW WATER HYDRAULIC PROFILE
020 D102 - BORE A - FINISHED WATER HYDRAULIC PROFILE
021 BORE SHEETS
021 C103 - BORE ALIGNMENT OVERVIEW
021 C104 - BORE B PROFILE OVERVIEW
021 C105 - BORE A PROFILE OVERVIEW
021 C401 - BORE ENTRY SITE LAYOUT
021 C402 - BORE RECEIVING SITE LAYOUT AND EQUIPMENT STAGING PLAN
021 BORE DETAILS
021 C502 - WELLHEAD AND DRILLING CELLAR DETAIL
021 C503 - TERMINUS AND CASING SPACER DETAILS