About this file

This document is a set of design drawings and specifications for infrastructure rehabilitation at the North Rim of Grand Canyon National Park, prepared by HDR Engineering, Inc. as the prime A/E firm. Volume 4 specifically addresses pipelines extending from Roaring Springs Cave to the Roaring Springs Pumphouse (RSPH), covering approximately 6.7 miles of utility corridor rehabilitation work at a UNESCO World Heritage Site. The drawings include general site plans, demolition plans, grading and erosion control plans, sheet maps, plan and profile views (Station 401+00 to 407+71), enlarged site plans for the cave entrance, civil details for waterline replacement and power/fiber optic installation, photo details of existing conditions, and electrical one-line diagrams with panelboard schedules. Key construction elements include removal of existing pipeline sections and associated electrical/communications infrastructure, installation of new 12-inch steel waterline with specialized anchoring systems using wire rope and rock anchors, protective concrete pipe cladding in exposed areas, and new power distribution and fiber optic cable routing. The construction limits extend approximately 6.7 miles from the cave source to the pumphouse, with specialized details for steep terrain crossing, cave entrance equipment staging, and environmental protection measures including sediment control logs and delineated wetlands protection.

The project documentation indicates multiple coordination requirements with existing utilities and systems referenced in other volumes covering North Rim water treatment, power distribution networks, and wastewater collection systems. Technical specifications address cathodic protection for pipe systems, grout-bonded rock anchors with minimum 5,000 PSI unconfined compressive strength, armored fiber optic cable installations with band clamps every five feet, and a 60-amp single-phase electrical service panel at the cave location. All work must comply with National Park Service standards and UNESCO World Heritage Site protection requirements, with contractor coordination mandated through the Owner's Representative for any modifications or repairs discovered during construction.

View the file

Other files

File Type Posted
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part7.pdf PDF
B08_140PP027R0005.pdf PDF
B08_Attach_10_GRCA_318719_Innercanyon_GIR_20250811.pdf PDF
B08_Attach_04_CLIN_Price_Sheet_-_Services.xlsx XLSX spreadsheet
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part5.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part8.pdf PDF
B08_Attach_07_Solit_PSP_Vol_I_PastPerf_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part8.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part14.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part4.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_03_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part1.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_06_20261012.pdf PDF
B08_Attach_08_Solit_PSP_Vol_II_BidBond.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_01_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part5.pdf PDF
B08_Attach_05_Solit_PSP_Vol_II_SubKPlan_REQD.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_10_20261012.pdf PDF
Sol_140PP027R0005.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part10.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_02_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part7.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_11_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part9.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part3.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part9.pdf PDF
B08_Attach_09_GRCA_318719_GISR_20260331.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part2.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part3.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_B_(Div_02-23)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part11.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_09_20261012.pdf PDF
B08_Attach_12_Site_Visit_Attendee_List.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_12_20261012.pdf PDF
B08_Attach_06_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim_Vol_C_(Div_26-46)_20261012.pdf PDF
B08_Attach_11_GRCA_318719_North_Rim_GIR_20250811.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_08_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part15.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_00_20261012_Part6.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part13.pdf PDF
B08_Attach_03_Wage_Determintation.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part11.pdf PDF
B08_Attach_01_Specs_Rehabilitate_North_Rim__Vol_A_(Div_01)_20261012.pdf PDF
B08_Attach_02_North_Rim_Final_CDs_Volume_05_20261012_Part12.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VOLUME # DESCRIPTION

VOLUME 0 GENERAL

VOLUME 1 PIPELINES - NORTH RIM

VOLUME 2 PIPELINES - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 3 PIPELINES - NORTH RIM TO SUPAI TUNNEL

VOLUME 5 ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 6 NORTH RIM WATER TREATMENT PLANT

VOLUME 7 NOT USED

VOLUME 8 NORTH RIM WASTEWATER COLLECTION SYSTEM

VOLUME 9 POWER DISTRIBUTION - NORTH RIM

VOLUME 10 POWER DISTRIBUTION - NORTH RIM TO ROARING SPRINGS PUMPHOUSE (RSPH)

VOLUME 11 POWER DISTRIBUTION - ROARING SPRINGS PUMPHOUSE (RSPH) TO MANZANITA

VOLUME 12 POWER SYSTEM - COTTONWOOD CAMPGROUND

VOLUME 4 PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

A/E FIRM

PRIME:

DENVER, CO 80202

HDR ENGINEERING, INC.

A u to d e s k D o c s /1

N P

S

G R

C A

N

R im U ti lit y

/1

G

E N

E R

A L

.r v t

/7

/2

:2

:5

P M

G001

NORTH RIM - GRAND CANYON NATIONAL PARK

318719

SHEET INDEX

S. RACE

B. LUSTER

AUG 2026

N. LYNCH

182752040

GENERAL

REHABILITATE NORTH RIM

INFRASTRUCTURE

VOLUME 4 - PIPELINES - ROARING SPRINGS CAVE TO

ROARING SPRINGS PUMPHOUSE (RSPH)

WORLD HERITAGE SITE

GRAND CANYON NATIONAL PARK

UNESCO

SHEET SUB SHEET SUB AREA TITLE OF SHEET

1 040G001 GENERAL SHEET INDEX

2 040C101 GENERAL SITE PLAN

3 041X101 RSPH PIPELINE REHABILITATION DEMOLITION PLAN

4 041C101 RSPH PIPELINE REHABILITATION GESC PLAN

5 041C102 RSPH PIPELINE REHABILITATION SHEET MAP

6 041C103 RSPH PIPELINE REHABILITATION PLAN AND PROFILE STA 401+00 TO STA 407+71

7 041C401 RSPH PIPELINE REHABILITATION ENLARGED SITE PLAN RS CAVE

8 041C501 RSPH PIPELINE REHABILITATION CIVIL DETAILS WATERLINE REPLACEMENT

9 041C502 RSPH PIPELINE REHABILITATION CIVIL DETAILS POWER AND FO INSTALLATION

10 041C901 RSPH PIPELINE REHABILITATION PHOTO DETAILS

11 041E601 RSPH PIPELINE REHABILITATION CAVE ONE LINE AND PANELBOARD SCHEDULE

GOUGH/LUSTERM. GOUGH

2NORTH RIM - GRAND CANYON NATIONAL PARK 11

DENVER, CO 80202

HDR ENGINEERING, INC.

GOUGH/LUSTER

3NORTH RIM - GRAND CANYON NATIONAL PARK 11

SCL

4NORTH RIM - GRAND CANYON NATIONAL PARK 11

DENVER, CO 80202

5NORTH RIM - GRAND CANYON NATIONAL PARK 11

PRIME:

HDR ENGINEERING, INC.

AUG 2026

6 11NORTH RIM - GRAND CANYON NATIONAL PARK

7NORTH RIM - GRAND CANYON NATIONAL PARK 11

UNPROTECTED PIPE OR

CATHODICALLY

PROTECTED PIPE

CATHODICALLY

PROTECTED PIPE

8NORTH RIM - GRAND CANYON NATIONAL PARK 11

R e g is t e r e d

P r of essional En g in e e r

(C iv il)

A

RIZONA, U.S

.A

CE

RT

IFICATE NO.

D a t e Signed ...

22198

NICHOLAS J.

LAFRONZ

5- 1-

DENVER, CO 80202

9NORTH RIM - GRAND CANYON NATIONAL PARK 11

10NORTH RIM - GRAND CANYON NATIONAL PARK 11

1.00 X 0.25 KNOCKOUTS

(25) (6)

DIMENSIONS: in.

(mm)

0.50 X 0.75 KNOCKOUTS

(13) (19)

HINGED DOOR WITH

PADLOCK HASP

BOTTOM

VIEW

16.00 (406)

4.75 (121)

DEAD FRONT CIRCUIT

BREAKER PANEL

SIDE

VIEW

11.90 (302)

11.00 (279)

0.31 DIA.

(8)

11.75 (298)

ONE TAB ON CENTERLINE

39.80 (1011)

41.00 (1041)

FRONT

VIEW

2.00 TYP.

(51)

FROM

VOLUME 5

MCC-RS-4LR

480V 1Φ

(2) #4, #4 GRD

30A/2P

10 KVA

480:120/240V 1Φ3W

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

A/E FIRM

PRIME:

PM: MATTHEW GOUGH

DENVER, CO

HDR ENGINEERING, INC.

A u to d e s k D o c s /1

N P

S

G R

C A

N

R im U ti lit y

/1

G

E N

E R

A L

.r v t

/1

/2

:2

:0

A M

E601

NORTH RIM - GRAND CANYON NATIONAL PARK

318719

CAVE ONE LINE AND

PANELBOARD SCHEDULE

J. HUCKENPAHLER

P. DAVILA

MAY 2026

D. LOPEZ

182752041

RSPH PIPELINE REHABILITATION

DESIGN LOAD (KVA) 0.0 0.0 4.3 0.9 5.2 22 DESIGN AMPS

DEMAND FACTOR 1.25 NEC 1.00 20% --- 18 CONNECTED AMPS PHASE B (KVA) 1.4

CONNECTED LOAD (KVA) 0.0 0.0 4.3 --- 4.3 240 LINE-TO-LINE VOLTS PHASE A (KVA) 2.9

LTS REC POWER SPARE TOTAL PHASE BALANCE

LOAD SUMMARY

11 SPARE 20 1 B 20 1 SPARE 12

9 SPARE 20 1 A 20 1 SPARE 10

7 SPARE 20 1 B 20 1 SPARE 8

5 SPARE 20 1 A 15 1 1,440 CIRCUIT 2 6

3 CIRCUIT 3 1,440 15 1 B 4

1 CIRCUIT 1 1,440 15 1 A

60 2 MAIN CIRCUIT BREAKER

NO. DESCRIPTION LTS REC POWER AMPS P AMPS P LTS REC POWER DESCRIPTION NO.

CKT CONNECTED LOAD (VA) OCP OCP CONNECTED LOAD (VA) CKT

200% NEUTRAL: NO SERVICE ENTRANCE LABEL: YES

WIRE: 3+GND INTERRUPTING RATING (KA): 18 LOCATION: CAVE

PHASE: 1 MAIN OC DEVICE (A/PHASE): 60 MOUNTING: SURFACE

VOLTAGE: 120/240 BUS RATING (A): 60A ENCLOSURE: NEMA 3R

PANELBOARD NO: RS-CAVE-MPZ

1. UTILIZE UP TO 3 BRANCH CIRCUITS TO

FEED LOADS AT THE EXISTING CAVE

CONTROL PANEL.

CAVE POWER ONE LINE

KEYNOTES: X

SINGLE PHASE ENCLOSURE AA

11NORTH RIM - GRAND CANYON NATIONAL PARK 11

S. BILD

VOLUME 4 - PIPELINES - ROARING SPRINGS CAVE TO ROARING SPRINGS PUMPHOUSE (RSPH)
040 - GENERAL SHEETS
040 G001 - SHEET INDEX
040 C101 - SITE PLAN
041 - DEMOLITION UTILITIES PLANS
041 X101 - DEMOLITION PLAN
041 UTILITY PLANS
041 C101 - GESC PLAN
041 C102 - SHEET MAP
041 C103 - PLAN AND PROFILE STA 401+00 TO 407+71
041 C401 - ENLARGED SITE PLAN RS CAVE
041 UTILITY DETAILS
041 C501 - CIVIL DETAILS WATERLINE REPLACEMENT
041 C502 - CIVIL DETAILS POWER AND FO INSTALLATION
041 C901 - PHOTO DETAILS
041 ELECTRICAL SHEETS
041 E601 - CAVE ONE LINE AND PANELBOARD SCHEDULE

File details come from the government source that posted it. Updated .