This file contains appendices to a Statement of Work for demolishing Crystal Creek Camp at Whiskeytown National Recreation Area in California, including well records, tank closure documentation, bridge inspection reports, CCC building complex plans, and a QC daily inspection form template.
The appendices provide detailed documentation of existing site infrastructure: two county well records from 1989 for wells approximately 225 feet deep, a 1995 underground storage tank closure certification, a comprehensive 2021 bridge inspection report for the Crystal Creek truss bridge (Structure No. 8750-017P) noting fair condition with recommended repairs totaling $80,000, detailed floor plans of multiple CCC-era buildings including warehouses, administration, school, recreation room and barracks, and utility infrastructure layouts showing locations of LPG lines, water systems, leach fields and electrical systems. The QC daily inspection form template is included for documenting construction progress, labor, equipment, materials, safety, and quality control during the demolition work.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WHISKEYTOWN
NATIONAL RECREATION AREA
DEMOLISH CRYSTAL CREEK CAMP
PMIS No. 319078
STATEMENT OF WORK
APPENDIX A:
County Well Records (x2)
APPENDIX B:
State Water Board Tank Closure Record
APPENDIX C:
Bridge Inspection Report
BRIDGE INSPECTION REPORT
CRYSTAL CREEK TRUSS BRIDGE
CRYSTAL CREEK ROAD OVER CRYSTAL CREEK
WHISKEYTOWN NATIONAL RECREATION AREA
LOOKING WEST TOWARD CA ROUTE 299
STRUCTURE NO. 8750-017P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 7/21/2021
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
SOUTH (UPSTREAM) PROFILE
MILE POINT: 4.0
KILOMETER POINT: 6.44
https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 8750-017P
CRYSTAL CREEK TRUSS BRIDGE INSPECTION DATE: 07/21/2021
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ..... 3 - STEEL NO. OF MAIN SPANS:
MAIN SPAN TYPE: .............. 10 - TRUSS - THRU NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: . 2 STRUCT. TOTAL LENGTH: . 53.3 FT (16.2 M)
DECK TYPE: ........................ 3 - OPEN GRATING MAX. SPAN LENGTH: ......... 50 FT (15.2 M) WEARING SURFACE: ......... N - NA DECK WIDTH: ..................... 12.3 FT (3.7 M)
ABUT. FOUNDATIONS: ....... 0 - UNKNOWN CURB TO CURB WIDTH: .... 11 FT (3.4 M)
PIER FOUDNATION(S): ...... 6 - N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: .. 1 - CONCRETE YEAR RECONSTRUCTED: .
PROJ./PLAN REF. NO: ....... SKEW ANGLE: .................... 0 °
NPS ROAD CLASS: ............ 5 - ADMINISTRATIVE FRACTURE CRITICAL: ....... Y
STRUCTURE HISTORY: ..... (YEAR UNKNOWN) - TRUSS LENGTHENED 10' SINCE INITIAL CONSTRUCTION WITH
TRUSS NO LONGER BEARING ON ABANDONED PIER; MODIFIED FLOORBEAM AND
STRINGER CONFIGURATION IMPLEMENTED.
LOCATION
WHISKEYTOWN NATIONAL RECREATION AREA MILE POINT: .. 4.0 (KM PT 6.44)
STATE: .............................. 069 - CALIFORNIA LOCATION: .... South from CA Route 299 on Crystal
Creek Road, 3.9 miles to locked gate.FACILITY CARRIED: ......... CRYSTAL CREEK ROAD Bridge located 0.1 miles beyond gate.FEATURE INTERSECTED: CRYSTAL CREEK ROAD
INSPECTION TEAM: P. Clark, J. Hensley
CONDITION ASSESSMENT:
Jordan Hensley
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 12/20/2021
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This steel truss bridge is in fair condition overall. The main problem is heavy soil and debris accumulation with vegetation growth on the truss ends, bearings and end floor beams at both abutments. In addition to restricting the truss expansion, the condition will eventually contribute to premature corrosion of the steel superstructure.
Other problems include missing approach guardrail, cracked welds securing the steel grid decking to the stringer top flanges, and the paint system beginning to fail with rusting of the superstructure throughout.
Additionally, fallen trees in the channel restrict flow and trap debris upstream of the structure. The west abutment footing is exposed (16"H, 6"D) at the downstream end, and this condition has possibly been exacerbated by increased flow velocity caused by debris.
It appears that, since the initial construction, the truss has been lengthened 10' at the east end. The floor beam and stringer configurations have been slightly modified at this location, and the truss no longer bears down
STRUCTURE SUMMARY STRUCTURE NO. 8750-017P
CRYSTAL CREEK TRUSS BRIDGE INSPECTION DATE: 07/21/2021
(5/8" gap) on the abandoned concrete pier.
Concrete actions should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future. This report also constitutes the Fracture Critical Inspection Report for the structure.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 8750-017P
CRYSTAL CREEK TRUSS BRIDGE INSPECTION DATE : 07/21/2021
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
Item No.
Maintenance Recomendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
PRELIM. MAINTENANCE TOTAL :
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
222.3 INSTALL APPROACH GUARDRAIL AT ALL FOUR
CORNERS OF STRUCTURE. 1 LS 20000 20000
60.9 INSTALL RIPRAP OR OTHER PROTECTIVE
MEASURES TO PREVENT FURTHER SCOUR OF
EXPOSED WEST ABUTMENT FOOTING.
1 LS 10000 10000
61.4 REMOVE FALLEN TREES AND DEBRIS FROM
CHANNEL. 1 LS 5000 5000
58.1 REPAIR CRACKED WELDS SECURING
STRINGERS TO FLOOR BEAM TOP FLANGES. 1 LS 2000 2000
59.1,59.4, 59.5
CLEAR VEGETATION GROWTH AND DEBRIS
ACCUMULATION ON BEARINGS, BEARING
SEATS, AND SUPERSTRUCTURE.
1 LS 1000 1000
59.11 TRIM BACK TREES OVERHANGING SOUTH SIDE
OF STRUCTURE. 1 LS 1000 1000
59.6 TIGHTEN LOOSE AND DEFLECTED LOWER
LATERAL BRACING MEMBER L6US-L8DS. 1 LS 1000 1000
CONTRACT COSTS FOR MOBILIZATION,
TRAFFIC CONTROL, DESIGN AND
CONSTRUCTION ENGINEERING.
1 LS 40000 40000
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 80000
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 8750-017P
CRYSTAL CREEK TRUSS BRIDGE INSPECTION DATE : 07/21/2021
226 PRIORITY OF IMPROVEMENT D
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazzard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : .. 0
80000TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 8750-017P
CRYSTAL CREEK TRUSS BRIDGE INSPECTION DATE: 07/20/2021
58. DECK
1. DECK SLAB
4. RIDEABILITY
5. CURBS, SIDEWALKS, AND MEDIAN
6. PARAPETS AND/OR RAILINGS
7. DRAINS AND DRAINAGE
8. UTILITIES
9. DEFLECTION AND/OR VIBRATION
10.OTHER:
59. SUPERSTRUCTURE
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10.ALIGNMENT
11.OTHER
60. SUBSTRUCTURE
61. CHANNEL
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
9. STREAMBED COMPOSITION:
222. APPROACHES
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
223. RETAINING WALL
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
F
F
F
F
F
G
N
F
N
N
F
F
F
F
N
G
F
F
F
G
N
F
N
1- SUFF
2 - MED
N
N
P
F
G
G
F
N
N
N
N
N
N
N
G
N
2. EXPANSION JOINTS F
3. WEARING SURFACE N
N
VEGETATION
10 FT
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLEN
EXCELLENT CONDITION9
VERY GOOD CONDITION - no problems noted.8
GOOD CONDITION - some minor problems.7
SATISFACTORY CONDITION - structural elements show some minor deterioration.6
FA R CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.4
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“ MM NENT” FA LURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability.
Structure is closed to
FA LED CONDITION - out of service; beyond corrective action. 0
ROCK, GRAVEL, SAND
ABUTMENTS
1. BREASTWALLS OR COLUMNS F
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS F
4. BACKWALLS AND/OR BULKHEADS F
5. FOUNDATIONS G
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS F
9. EROSION AND/OR SCOUR G
10.SETTLEMENT OR DEFLECTION G
11.SLOPE PROTECTION N
12.OTHER N
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS:
B. TRANSITIONS:
C. APPROACH GUARDRAILS:
D. APPROACH GUARDRAIL ENDS:
PIER(S) TRAFFIC SAFETY RATING CODES
13. WALLS AND/OR COLUMNS N
N
N
N
N
N
N
0 - Does not meet standards or a safety features is 14.PILE BENTS required and none is provided.
15.CAPS AND/OR BEARING SEATS
1 - Meets currently acceptable standards.
16.FOUNDATIONS
17.EROSION AND/OR SCOUR N - Not applicable or a safety features is not required.
18.SETTLEMENT OR DEFLECTION
19.OTHER
FIELD INSPECTION REPORT STRUCTURE NO. 8750-017P
ITEM REFERENCE AND REMARKS
58.1 MINOR TO MODERATE RUSTING OF STEEL GRID DECKING. SEVERAL MINOR DAMAGED SECTIONS OF GRID DECKING. SEVERAL
CRACKED WELDS SECURING STEEL GRID DECKING TO STRINGER TOP FLANGES.
58.2 1" WIDE OPEN JOINT AT WEST ABUTMENT (EXPANSION END). STEEL GRID DECKING IS IN CONTACT WITH BACKWALL AT EAST
ABUTMENT (FIXED END).
58.5 MINOR SCRAPES WITH RUSTING OF STEEL CURBS.
58.6 TRUSS TOP CHORD FUNCTIONS AS RAILING TOP MEMBER. MINOR RUSTING WITH SEVERAL AREAS OF MINOR IMPACT DAMAGE
TO RAILING.
58.7 OPEN GRID DECKING DIRECTS DRAINAGE ONTO TRUSS AND SUBSTRUCTURE, PRIMARILY AT ABUTMENTS.
59.1 EXPANSION BEARINGS AT WEST ABUTMENT AND FIXED BEARINGS AT EAST ABUTMENT. WEST ABUTMENT BEARINGS FULLY EXPANDED AT 80 DEGREES FAHRENHEIT. MINOR RUSTING OF BEARINGS. HEAVY DEBRIS ACCUMULATION ON BEARINGS AT
BOTH ABUTMENTS.
59.4 MODERATE RUSTING WITH DEBRIS ACCUMULATION AND MOSS GROWTH ON FLOOR BEAMS AND STRINGERS. END FLOO RBEAMS #1 AND #10 BLOCKED WITH STEEL BEAM AND STACKED STEEL PLATES AT APPROXIMATELY 2' SPACING. SEVERAL
CRACKED WELDS SECURING STRINGERS TO FLOOR BEAM TOP FLANGES.
59.5 THIS REPORT ALSO CONSTITUTES THE FRACTURE CRITICAL INSPECTION REPORT FOR THE STRUCTURE.
TRUSS LENGTHENED 10' SINCE INITIAL CONSTRUCTION. TRUSS NO LONGER BEARS DOWN (5/8" GAP) ON ABANDONED PIER.
MODIFIED FLOORBEAM CONFIGURATION USED WITH DUAL NESTED STEEL TUBE AND ANGLE MEMBERS AT FLOORBEAMS #8
AND #9. MODIFIED STRINGER CONFIGURATION IN PANELS #9 AND #10.
MINOR RUSTING OF TRUSSES. DEBRIS ACCUMULATION ON TRUSS BOTTOM CHORDS THROUGHOUT, HEAVIEST AT ABUTMENTS.
MINOR TO MODERATE RUSTING OF L-BOLTS (CONNECTIONS BETWEEN TRUSS AND FLOORBEAM).
59.6 DIAPHRAGMS BETWEEN STRINGERS ONLY IN PANELS #9 AND #10. MINOR RUSTING OF DIAPHRAGMS AND LOWER LATERAL BRACING. LOWER LATERAL BRACING MEMBERS L6US-L8DS IS LOOSE AND DEFLECTED DOWNWARD 3".
59.7 PAINT SYSTEM BEGINNING TO FAIL WITH MINOR TO MODERATE RUSTING OF SUPERSTRUCTURE THROUGHOUT
59.11 TREES OVERHANG UPSTREAM SIDE OF STRUCTURE.
60.1 MODERATE MOSS GROWTH AND MINOR GRAFFITI ON WEST ABUTMENT BREASTWALL. MINOR VERTICAL AND HORIZONTAL
CRACKING OF WEST ABUTMENT BREASTWALL.
60.3 MODERATE VEGETATION GROWTH AND DEBRIS ACCUMULATION ON BEARING SEATS AT BOTH ABUTMENTS.
60.4 MINOR SCALING OF ABUTMENT BACKWALLS. MODERATE EDGE SPALLING ALONG TOP OF WEST ABUTMENT BEACKWALL; MINOR
AT EAST ABUTMENT BACKWALL.
60.9 WEST ABUTMENT:
EMBANKMENT ERODED ALONG DOWNSTREAM END.
FOOTING EXPOSED UP TO 12"H FOR 3' ALONG BREASTWALL. FOOTING EXPOSED UP TO 16"H FOR 20.5' ALONG NORTHWEST
WINGWALL. FOOTING UNDERMINING UP TO 6".
60.6 WEST ABUTMENT:
MINOR SPALLING OF SOUTHWEST WINGWALL. MINOR SCALING AND MOSS GROWTH ON WINGWALLS. MINOR GRAFFITI ON
WINGWALLS.
60.13 PIER ABANDONED WITH TEMPORARY STEEL BLOCKING REMAINING (NOT ENGAGED) BELOW TRUSS PANEL POINT #8.
61.1 STREAM FLOW DIRECTED AGAINST EAST EMBANKMENT (SOLID ROCK).
61.4 SEVERAL FALLEN AND LODGED TREES COLLECT DEBRIS AT UPSTREAM SIDE OF STRUCTURE. SEVERAL TREES GROWING
BELOW AND ON UPSTREAM SIDE OF STRUCTURE ALSO AID IN TRAPPING DEBRIS.
222.3 ONE SINGLE SECTION OF GUARDRAIL PRESENT AT SOUTWEST CORNER OF STRUCTURE. IMPACT DAMAGE TO WEST END OF
APPROACH GUARDRAIL WITH ONLY ONE POST REMAINING.
222.4 MINOR RUTTING AND CRACKING OF ASPHALT PAVEMENT WITH VEGETATION GROWTH AT EAST APPROACH.
222.7 NORTHEAST, NORTHWEST, AND SOUTHEAST END POSTS: 4" SQUARE REFLECTORS
SOUTHWEST END POST: 3" CIRCULAR REFLECTORS
222.8 SHARP TURN PRESENT AT WEST END OF STRUCTURE.
STRUCTURE LOAD RATING STRUCTURE NO. 8750-017P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 11 10 20 18
HS 21 19 36 33
TYPE 3 14 13 25 23
TYPE 3S2 21 19 36 33
TYPE 3-3 36 33 40 36
DESIGN LOADING: 0 - UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 12/01/2020
LOAD RATING CONTROLLED BY: ENGINEERING JUDGEMENT / LOAD TEST
REMARKS: RATING BASED ON RESULTS OF LOAD TEST PERFORMED BY FLDOT FOR SIMILAR BAILEY-TYPE BRIDGES.
SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8750-017P
STRUCTURE IDENTIFICATION
(201) PARK: WHISKEYTOWN NATIONAL RECREATION AREA
(202) STRUCTURE NAME:..............CRYSTAL CREEK TRUSS BRIDGE
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........8750-
017P
6 - PACIFIC WEST(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:............. 017P
(208) NPS ROAD CLASS:............... 5 - ADMINISTRATIVE
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:.................PARK
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:......................66 - NATIONAL PARK SERVICE
(22) OWNER:................................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
069 - CALIFORNIA
01089 MADISON
1 6 1 0000 0
CRYSTAL CREEK
CRYSTAL CREEK ROAD
8750017P0000000
South from CA Route 299 on Crystal Creek Road, 3.9 miles to locked gate.
Bridge located 0.1 miles beyond gate.
99.99 FT ( 99.99 M)
4 0 (KM PT: 6.44 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL:..........3 - STEEL (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 10 - TRUSS - THRU (44B) APPR. STR. TYPE:.................... 00 - OTHER
(45) NO. OF MAIN SPANS:..............1 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............50 FT ( 15.2 M)
(49) STRUCTURE LENGTH:........... 53.3 FT ( 16.2 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 0 - UNKNOWN A) TYPE WEARING SURFACE:.. N - NA
(216B) ABUTMENT #2 FDN:........... 0 - UNKNOWN B) TYPE MEMBRANE:................. N - NA
(217A) PREDOM. PIER FDN:.......... 6 - N/A C) TYPE PROTECTION:.............. N - NA
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 3 - OPEN GRATING
LOAD RATING AND POSTING
(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. A - OPEN
(66) INVENTORY RATING:..............21.0 METRIC TONS) (70) BRIDGE POSTING:...................... 5 - EQUAL TO OR ABOVE LEGALTONS ( 19.1
LOADS
(64) OPERATING RATING:..............36.0 TONS ( 32.7 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 07/21/2021 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... Y
(220) SPECIAL STUDY TYPE: 0 - NONE INSP. EVERY 24 MONTHS - LAST INSP: 08/17/2020
(221) SPECIAL STUDY DATE: (B) UNDERWATER:
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:
INSP. EVERY MONTHS - LAST INSP:
https://RATING:
https://RATING:
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 8750-017P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE:................................ 40° 38' 03" (51) CURB TO CURB WIDTH:............ 11 FT ( 3.4 M)
(17) LONGITUDE:............................122°40 ' 37" (52) DECK WIDTH:.......................... 12.3 FT ( 3.7 M)
(19) DETOUR LENGTH:.................. 99 MI ( 159 KM) (32) APPR. ROADWAY WIDTH:...... 12.0 FT ( 3.7 M)
(28A) LANES ON STRUCT:.............01 (213) APPR. PAVEMENT WIDTH:... 12.0 FT ( 3.7 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... 2 0 FT ( 0.6 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... 2 0 FT ( 0.6 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............5 (34) SKEW ANGLE:......................... 0 °
(30) YEAR OF ADT:......................... 2020 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................6 (47) TOTAL HORIZ. CLEARANCE:.. 11.0 FT ( 3.4 M)
(115) YEAR OF FUTURE ADT:........2040 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO RIGHT:.................................. 0 0 FT ( 0 M)
WATERWAY
(39) VERTICAL CLEARANCE:.........0.0 FT ( 0 M) (214) BRIDGE RAIL TYPE
1 - FULL HEIGHT (NO PARAPET)(40) HORIZ. CLEARANCE:..............0.0 FT ( 0 M) RAIL CONFIGURATION:
(111) ABUT OR PIER PROT:...........1 - NAVIGATION PROTECTION NOT MATERIAL:........................... 4 - STEEL
REQUIRED
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:..............................0.0 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 3 33 FT ( 1 01 M)
(56) LEFT:................................ 0.0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... 0 00 FT ( 0 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:....................................... 6 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............6 (68) DECK GEOMETRY:......................N
(60) SUBSTRUCTURE:.......... 6 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 5 (113) SCOUR CRITICAL:.................... 4 - ACTION IS REQUIRED TO
PROTECT EXPOSED FOUNDATIONS
(223) RETAINING WALL:.................N (225) PROPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 0 0 0 0 (226) PRIORITY OF IMPROVEMENT: D - MINOR
(75A) TYPE OF WORK:................... (227) MAINTENANCE COST:.............$ 0
(75B) WORK DONE BY:.................. (228) REHAB / RECNSTR COST:..... $ 80000
(76) IMPROVEMENT LENGTH:....... FT ( M) (229) CONSTRUCTION COST:.......... $ 0
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
(YEAR UNKNOWN) - TRUSS LENGTHENED 10' SINCE INITIAL CONSTRUCTION WITH TRUSS NO LONGER BEARING ON ABANDONED PIER; MODIFIED
FLOORBEAM AND STRINGER CONFIGURATION MPLEMENTED.
(231) ADDITIONAL CONSIDERATIONS:
STRUCTURE BEHIND LOCKED GATE - COMBINATION REQUIRED
(330) ADDITIONAL CONFIGURATION INFORMATION:
Inspector: Jordan Hensley Structure Number: 8750017P0000000
Inpsection Date: 07/21/2021 Facility Carried:
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING EAST TOWARD CAMP
PHOTO 4
Description NORTH (DOWNSTREAM) PROFILE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW, LOOKING EAST
PHOTO 6
Description TYPICAL DAMAGE AND RUSTING OF DECK GRATE, SOUTHWEST CORNER SHOWN
Bridge Inspection Report
Pictures
PHOTO 7
Description TYPICAL VIEW OF BRIDGE CURB AND RAILING, DOWNSTREAM SIDE SHOWN
PHOTO 8
Description GENERAL UNDERSIDE VIEW OF THE SUPERSTRUCTURE, LOOKING EAST
Bridge Inspection Report
Pictures
PHOTO 9
Description RUSTING OF THE UNDERSIDE OF THE DECK GRATE, FLOOR BEAMS, AND STRINGERS
PHOTO 10
Description TYPICAL PAINT DETERIORATION AND RUSTING OF EXPOSED STEEL IN THE FLOOR
BEAMS AND STIFFENERS
Bridge Inspection Report
Pictures
PHOTO 11
Description TYPCIAL RUSTING OF L-BOLT CONNECTIONS, SOUTHWEST CORNER SHOWN
PHOTO 12
Description TYPICAL CRACKED WELDS BETWEEN THE FLOOR BEAMS AND STRINGERS
Bridge Inspection Report
Pictures
PHOTO 13
Description DOWNWARD DEFLECTION OF LATERAL BRACING MEMBER AT THE EAST END OF THE
SPAN
PHOTO 14
Description TYPICAL DEBRIS ACCUMULATION ON THE BEARINGS; SOUTHWEST BEARING SHOWN
Bridge Inspection Report
Pictures
PHOTO 15
Description GENERAL VIEW OF THE WEST ABUTMENT
PHOTO 16
Description EXPOSED FOOTING AT THE NORTH CORNER OF THE WEST ABUTMENT AND ALONG THE
NORTHWEST WINGWALL
Bridge Inspection Report
Pictures
PHOTO 17
Description MINOR UNDERMINING OF THE NORTHWEST WINGWALL FOOTING
PHOTO 18
Description GENERAL VIEW OF THE EAST ABUTMENT; NOTE, STEEL FLOOR BEAM IN CONTACT WITH
SOIL
Bridge Inspection Report
Pictures
PHOTO 19
Description GENERAL VIEW OF THE EAST ROCK EMBANKMENT
PHOTO 20
Description EROSION OF THE EAST BANK DOWNSTREAM OF THE STRUCTURE
Bridge Inspection Report
Pictures
PHOTO 21
Description TREE OVERGROWTH OVER THE UPSTREAM RAILING, LOOKING EAST
PHOTO 22
Description SIGNIFICANT DEBRIS BUILD-UP UPSTREAM OF THE STRUCTURE
Bridge Inspection Report
Pictures
PHOTO 23
Description DAMAGED SOUTHWEST APPROACH GUARDRAIL
PHOTO 24
Description GENERAL VIEW OF THE JOINT ABOVE THE WEST ABUTMENT; NOTE, GAP AND SPALLING
OF APPROACH WEARING SURFACE
Bridge Inspection Report
Pictures
PHOTO 25
Description WEST APPROACH
PHOTO 26
Description EAST APPROACH
Bridge Inspection Report
Pictures
PHOTO 27
Description SOUTH (UPSTREAM) CHANNEL
PHOTO 28
Description NORTH (DOWNSTREAM) CHANNEL
APPENDIX D:
CCC Building Complex Plans
APPENDIX E:
QC Daily Inspection Form
REPORT
NUMBER
PROJECT MANAGEMENT
INFORMATION SYSTEM
NUMBER (PMIS No.):
PROJECT CONTRACT NUMBER DATE
PARK CONTRACTOR CMR REPORTING
WEATHER
(Rain, Snow, Cloudy, Windy)
MOISTURE
AMOUNT
(INCHES)
TEMPERATURE
WEATHER
DELAY
DESCRIBE WEATHER DELAYED WORK GROUND CONDITIONS
(Dry, Damp, Wet, Frozen)
MAXIMUM MINIMUM Yes
No
PRIME CONTRACTOR:
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacture, size, year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
Project Manager (PM)
Superintendent
Quality Control Officer
Safety Officer
Laborers
MATERIALS DELIVERED QUANTITY OFFICIAL VISITORS
WORK PERFORMED BY PRIME: (Include detail description per each activity including location, quantities, and production.)
SPECIFIC INSPECTIONS: (Inspections performed, results, and corrective actions, and Primes and Subprimes.)
TESTING:
Was any testing performed today YES / NO. (Complete and attach Test Report Information Sheets.)
Type and Location of Testing:
Construction Management Representative (CMR) & Contractor Quality Control (CQC) Daily Report
National Park Service (NPS) - Denver Service Center (DSC) | 2-6-18
SUBCONTRACTOR(S): PMIS Number: Date:
SUBCONTRACTOR NAME
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacturer, size, and year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
MATERIALS DELIVERED QUANTITY EQUIPMENT MOBILIZIED/DEMOBILIZED
WORK PERFORMED BY SUBCONTRACTOR: Include detail description per each activity. Include location, quantity, and production.
SUBCONTRACTOR NAME
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacturer, size, and year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
MATERIALS DELIVERED QUANTITY EQUIPMENT MOBILIZIED/DEMOBILIZED
WORK PERFORMED BY SUBCONTRACTOR: Include detail description per each activity. Include location, quantity, and production.
SUBCONTRACTOR NAME
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacturer, size, and year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
MATERIALS DELIVERED QUANTITY EQUIPMENT MOBILIZIED/DEMOBILIZED
WORK PERFORMED BY SUBCONTRACTOR: Include detail description per each activity. Include location, quantity, and production.
SUBCONTRACTOR(S): PMIS Number: Date:
SUBCONTRACTOR NAME
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacturer, size, and year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
MATERIALS DELIVERED QUANTITY EQUIPMENT MOBILIZIED/DEMOBILIZED
WORK PERFORMED BY SUBCONTRACTOR: Include detail description per each activity. Include location, quantity, and production.
SUBCONTRACTOR NAME
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacturer, size, and year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
MATERIALS DELIVERED QUANTITY EQUIPMENT MOBILIZIED/DEMOBILIZED
WORK PERFORMED BY SUBCONTRACTOR: Include detail description per each activity. Include location, quantity, and production.
SUBCONTRACTOR NAME
EMPLOYEES BY JOB CATEGORIES NUMBER HOURS
EQUIPMENT ON JOB
(Include model, manufacturer, size, and year.)
NUMBER
OF UNITS
EQUIPMENT HOURS WORKING
YES STANDBY MOBILIZED/
DEMOBILIZED DATE
MATERIALS DELIVERED QUANTITY EQUIPMENT MOBILIZIED/DEMOBILIZED
WORK PERFORMED BY SUBCONTRACTOR: Include detail description per each activity. Include location, quantity, and production.
PMIS Number: Date:
CRITICAL POINT/MILESTONE OBSERVATIONS (Describe item inspected, observations, problems, and action items.)
DESCRIPTION OF WORK BEING MONITORED ON A TIME AND MATERIAL BASIS AND WHY
BREAKDOWN OF TIME AND MATERIAL WORK PERFORMED
Location:
Labor:
Equipment:
Material:
Production Rates:
STATUS OF GOVERNMENT FURNISHED SERVICES AND/OR SUPPLIES
SAFETY COMMENTS
Accidents / Lost Time:
Incidents:
First Aid Administered:
Other:
DIFFICULTIES WITH CONSTRUCTION CONTRACTOR
UNFORESEEN DEVELOPMENTS (Describe conditions, action taken, person contacted, and recommended actions.)
CONSTRUCTION DEFICIENCIES OR RE-TESTING REQUIRED
OTHER COMMENTS
CERTIFICATION
For Construction Management Representative (CMR): I certify the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the Prime Contractor and each Subcontractor and determined all materials, equipment, and workmanship are in strict compliance with plans and specifications except as may be noted above.
I certify that I or my authorized representative have reviewed and reconciled all differences between this daily report and the Construction Contractors. In the event a discrepancy is found, the Construction Contractor was notified and an acceptable revision was completed and resubmitted by either or both parties within this document. If unable to agree with the Construction Contractor, explain nature of disagreement in "Other Comments" above as needed.
For Contractor's Representative: I certify that the above report is complete and correct and that I, or my authorized representative, have inspected all work performed this day by the Prime Contractor and each Subcontractor and determined that all materials, equipment, and workmanship are in strict compliance with the plans and specifications except as may be noted above. I have reconciled all differences found when comparing this CQC daily diary with the CMR's daily diary. All unresolved issues are described under "Other Comments" above.
SIGNATURE TITLE:
RParrish Rectangle
RParrish Rectangle
Date:PMIS Number:
ADDITIONAL COMMENTS OR INFORMATION (Describe item inspected, observations, problems, and action items.)
Date:
IMAGES IN SUPPORT OF REPORT INFORMATION
PMIS Number:
| 014000A_CMR-CQC-DailyReport_.pdf |
| CMR Daily |
| Project: Crystal Creek Camp Demolition Proejct |
| Date: |
| ReportNo: |
| ContractNo: |
| Park: |
| Contractor: |
| CMR: |
| Weather: |
| Temperature: |
| WeatherDelayedWork: |
| GroundConditions: |
| MoistureAmount: |
| TempMax: |
| TempMin: |
| WeatherDelay: Yes |
| PrimeContractor: |
| NoPM: |
| HoursPM: |
| EquipmentPM: |
| UnitsPM: |
| YesPM: |
| StandbyPM: |
| MobDemobPM: |
| NoSuper: |
| HoursSuper: |
| EquipSuper: |
| UnitsSuper: |
| YesSuper: |
| StandbySuper: |
| MobDemobSuper: |
| NoQCO: |
| HoursQCO: |
| EquipQCO: |
| UnitsQCO: |
| YesQCO: |
| StandbyQCO: |
| MobDemobQCO: |
| NoSafety: |
| HoursSafety: |
| EquipSafety: |
| UnitsSafety: |
| YesSafety: |
| StandbySafety: |
| MobDemobSafety: |
| NoLaborers0: |
| HoursLaborers0: |
| EquipLaborers0: |
| UnitsLaborers0: |
| YesLaborers0: |
| StandbyLaborers0: |
| MobDemobLaborers0: |
| Laborer1: |
| NoLaborer1: |
| HoursLaborer1: |
| EquipLaborer1: |
| UnitsLaborer1: |
| YesLaborer1: |
| StandbyLaborer1: |
| MobDemobLaborer1: |
| Laborer2: |
| NoLaborer2: |
| HoursLaborer2: |
| EquipLaborer2: |
| UnitsLaborer2: |
| YesLaborer2: |
| StandbyLaborer2: |
| MobDemobLaborer2: |
| Laborer3: |
| NoLaborer3: |
| HoursLaborer3: |
| EquipLaborer3: |
| UnitsLaborer3: |
| YesLaborer3: |
| StandbyLaborer3: |
| MobDemobLaborer3: |
| Laborer4: |
| NoLaborer4: |
| HoursLaborer4: |
| EquipLaborer4: |
| UnitsLaborer4: |
| YesLaborer4: |
| StandbyLaborer4: |
| MobDemobLaborer4: |
| Laborer5: |
| NoLaborer5: |
| HoursLaborer5: |
| EquipLaborer5: |
| UnitsLaborer5: |
| YesLaborer5: |
| StandbyLaborer5: |
| MobDemobLaborer5: |
| Materials1: |
| Quantity1: |
| Visitors1: |
| Materials2: |
| Quantity2: |
| Visitors2: |
| Materials3: |
| Quantity3: |
| Visitors3: |
| Materials4: |
| Quantity4: |
| Visitors4: |
| WorkPerformed1: |
| WorkPerformed2: |
| WorkPerformed3: |
| WorkPerformed4: |
| WorkPerformed5: |
| WorkPerformed6: |
| WorkPerformed7: |
| Inspections1: |
| Inspections2: |
| Inspections3: |
| Inspections4: |
| Testing: Off |
| TestingTypeLocation1: |
| TestingTypeLocation2: |
| TestingTypeLocation3: |
| TestingTypeLocation4: |
| TestingTypeLocation5: |
| PMISNo: |
| Subcontractor1: |
| Sub1Employees1: |
| Sub1EmpNo1: |
| Sub1EmpHours1: |
| Sub1EmpEquip1: |
| Sub1EmpUnits1: |
| Sub1EmpYes1: |
| Sub1EmpStandby1: |
| Sub1EmpMobDate1: |
| Sub1EmpDemobDate1: |
| Sub1Employees2: |
| Sub1EmpNo2: |
| Sub1EmpHours2: |
| Sub1EmpEquip2: |
| Sub1EmpUnits2: |
| Sub1EmpYes2: |
| Sub1EmpStandby2: |
| Sub1EmpMobDate2: |
| Sub1EmpDemobDate2: |
| Sub1Employees3: |
| Sub1EmpNo3: |
| Sub1EmpHours3: |
| Sub1EmpEquip3: |
| Sub1EmpUnits3: |
| Sub1EmpYes3: |
| Sub1EmpStandby3: |
| Sub1EmpMobDate3: |
| Sub1EmpDemobDate3: |
| Sub1Employees4: |
| Sub1EmpNo4: |
| Sub1EmpHours4: |
| Sub1EmpEquip4: |
| Sub1EmpUnits4: |
| Sub1EmpYes4: |
| Sub1EmpStandby4: |
| Sub1EmpMobDate4: |
| Sub1EmpDemobDate4: |
| Sub1Employees5: |
| Sub1EmpNo5: |
| Sub1EmpHours5: |
| Sub1EmpEquip5: |
| Sub1EmpUnits5: |
| Sub1EmpYes5: |
| Sub1EmpStandby5: |
| Sub1EmpMobDate5: |
| Sub1EmpDemobDate5: |
| Sub1Employees6: |
| Sub1EmpNo6: |
| Sub1EmpHours6: |
| Sub1EmpEquip6: |
| Sub1EmpUnits6: |
| Sub1EmpYes6: |
| Sub1EmpStandby6: |
| Sub1EmpMobDate6: |
| Sub1EmpDemobDate6: |
| Sub1Employees7: |
| Sub1EmpNo7: |
| Sub1EmpHours7: |
| Sub1EmpEquip7: |
| Sub1EmpUnits7: |
| Sub1EmpYes7: |
| Sub1EmpStandby7: |
| Sub1EmpMobDate7: |
| Sub1EmpDemobDate7: |
| Sub1Employees8: |
| Sub1EmpNo8: |
| Sub1EmpHours8: |
| Sub1EmpEquip8: |
| Sub1EmpUnits8: |
| Sub1EmpYes8: |
| Sub1EmpStandby8: |
| Sub1EmpMobDate8: |
| Sub1EmpDemobDate8: |
| Sub1Materials1: |
| Sub1Quantity1: |
| Sub1EquipMobDemob1: |
| Sub1Materials2: |
| Sub1Quantity2: |
| Sub1EquipMobDemob2: |
| Sub1Materials3: |
| Sub1Quantity3: |
| Sub1EquipMobDemob3: |
| Sub1Materials4: |
| Sub1Quantity4: |
| Sub1EquipMobDemob4: |
| Sub1WorkPerformed: |
| Subcontractor2: |
| Sub2Employees1: |
| Sub2EmpNo1: |
| Sub2EmpHours1: |
| Sub2EmpEquip1: |
| Sub2EmpUnits1: |
| Sub2EmpYes1: |
| Sub2EmpStandby1: |
| Sub2EmpMobDate1: |
| Sub2EmpDemobDate1: |
| Sub2Employees2: |
| Sub2EmpNo2: |
| Sub2EmpHours2: |
| Sub2EmpEquip2: |
| Sub2EmpUnits2: |
| Sub2EmpYes2: |
| Sub2EmpStandby2: |
| Sub2EmpMobDate2: |
| Sub2EmpDemobDate2: |
| Sub2Employees3: |
| Sub2EmpNo3: |
| Sub2EmpHours3: |
| Sub2EmpEquip3: |
| Sub2EmpUnits3: |
| Sub2EmpYes3: |
| Sub2EmpStandby3: |
| Sub2EmpMobDate3: |
| Sub2EmpDemobDate3: |
| Sub2Employees4: |
| Sub2EmpNo4: |
| Sub2EmpHours4: |
| Sub2EmpEquip4: |
| Sub2EmpUnits4: |
| Sub2EmpYes4: |
| Sub2EmpStandby4: |
| Sub2EmpMobDate4: |
| Sub2EmpDemobDate4: |
| Sub2Materials1: |
| Sub2Quantity1: |
| Sub2EquipMobDemob1: |
| Sub2Materials2: |
| Sub2Quantity2: |
| Sub2EquipMobDemob2: |
| Sub2Materials3: |
| Sub2Quantity3: |
| Sub2EquipMobDemob3: |
| WorkBySubcontractor2: |
| Subcontractor3: |
| Sub3Employees1: |
| Sub3EmpNo1: |
| Sub3EmpHours1: |
| Sub3EmpEquip1: |
| Sub3EmpUnits1: |
| Sub3EmpYes1: |
| Sub3EmpStandby1: |
| Sub3EmpMobDate1: |
| Sub3EmpDemobDate1: |
| Sub3Employees2: |
| Sub3EmpNo2: |
| Sub3EmpHours2: |
| Sub3EmpEquip2: |
| Sub3EmpUnits2: |
| Sub3EmpYes2: |
| Sub3EmpStandby2: |
| Sub3EmpMobDate2: |
| Sub3EmpDemobDate2: |
| Sub3Employees3: |
| Sub3EmpNo3: |
| Sub3EmpHours3: |
| Sub3EmpEquip3: |
| Sub3EmpUnits3: |
| Sub3EmpYes3: |
| Sub3EmpStandby3: |
| Sub3EmpMobDate3: |
| Sub3EmpDemobDate3: |
| Sub3Employees4: |
| Sub3EmpNo4: |
| Sub3EmpHours4: |
| Sub3EmpEquip4: |
| Sub3EmpUnits4: |
| Sub3EmpYes4: |
| Sub3EmpStandby4: |
| Sub3EmpMobDate4: |
| Sub3EmpDemobDate4: |
| Sub3Materials1: |
| Sub3Quantity1: |
| Sub3EquipMobDemob1: |
| Sub3Materials2: |
| Sub3Quantity2: |
| Sub3EquipMobDemob2: |
| Sub3Materials3: |
| Sub3Quantity3: |
| Sub3EquipMobDemob3: |
| WorkBySubcontractor3: |
| Subcontractor4: |
| Sub4Employees1: |
| Sub4EmpNo1: |
| Sub4EmpHours1: |
| Sub4EmpEquip1: |
| Sub4EmpUnits1: |
| Sub4EmpYes1: |
| Sub4EmpStandby1: |
| Sub4EmpMobDate1: |
| Sub4EmpDemobDate1: |
| Sub4Employees2: |
| Sub4EmpNo2: |
| Sub4EmpHours2: |
| Sub4EmpEquip2: |
| Sub4EmpUnits2: |
| Sub4EmpYes2: |
| Sub4EmpStandby2: |
| Sub4EmpMobDate2: |
| Sub4EmpDemobDate2: |
| Sub4Employees3: |
| Sub4EmpNo3: |
| Sub4EmpHours3: |
| Sub4EmpEquip3: |
| Sub4EmpUnits3: |
| Sub4EmpYes3: |
| Sub4EmpStandby3: |
| Sub4EmpMobDate3: |
| Sub4EmpDemobDate3: |
| Sub4Employees4: |
| Sub4EmpNo4: |
| Sub4EmpHours4: |
| Sub4EmpEquip4: |
| Sub4EmpUnits4: |
| Sub4EmpYes4: |
| Sub4EmpStandby4: |
| Sub4EmpMobDate4: |
| Sub4EmpDemobDate4: |
| Sub4Employees5: |
| Sub4EmpNo5: |
| Sub4EmpHours5: |
| Sub4EmpEquip5: |
| Sub4EmpUnits5: |
| Sub4EmpYes5: |
| Sub4EmpStandby5: |
| Sub4EmpMobDate5: |
| Sub4EmpDemobDate5: |
| Sub4Employees6: |
| Sub4EmpNo6: |
| Sub4EmpHours6: |
| Sub4EmpEquip6: |
| Sub4EmpUnits6: |
| Sub4EmpYes6: |
| Sub4EmpStandby6: |
| Sub4EmpMobDate6: |
| Sub4EmpDemobDate6: |
| Sub4Employees7: |
| Sub4EmpNo7: |
| Sub4EmpHours7: |
| Sub4EmpEquip7: |
| Sub4EmpUnits7: |
| Sub4EmpYes7: |
| Sub4EmpStandby7: |
| Sub4EmpMobDate7: |
| Sub4EmpDemobDate7: |
| Sub4Employees8: |
| Sub4EmpNo8: |
| Sub4EmpHours8: |
| Sub4EmpEquip8: |
| Sub4EmpUnits8: |
| Sub4EmpYes8: |
| Sub4EmpStandby8: |
| Sub4EmpMobDate8: |
| Sub4EmpDemobDate8: |
| Sub4Materials1: |
| Sub4Quantity1: |
| Sub4EquipMobDemob1: |
| Sub4Materials2: |
| Sub4Quantity2: |
| Sub4EquipMobDemob2: |
| Sub4Materials3: |
| Sub4Quantity3: |
| Sub4EquipMobDemob3: |
| Sub4Materials4: |
| Sub4Quantity4: |
| Sub4EquipMobDemob4: |
| WorkBySubcontractor4: |
| Subcontractor5: |
| Sub5Employees1: |
| Sub5EmpNo1: |
| Sub5EmpHours1: |
| Sub5EmpEquip1: |
| Sub5EmpUnits1: |
| Sub5EmpYes1: |
| Sub5EmpStandby1: |
| Sub5EmpMobDate1: |
| Sub5EmpDemobDate1: |
| Sub5Employees2: |
| Sub5EmpNo2: |
| Sub5EmpHours2: |
| Sub5EmpEquip2: |
| Sub5EmpUnits2: |
| Sub5EmpYes2: |
| Sub5EmpStandby2: |
| Sub5EmpMobDate2: |
| Sub5EmpDemobDate2: |
| Sub5Employees3: |
| Sub5EmpNo3: |
| Sub5EmpHours3: |
| Sub5EmpEquip3: |
| Sub5EmpUnits3: |
| Sub5EmpYes3: |
| Sub5EmpStandby3: |
| Sub5EmpMobDate3: |
| Sub5EmpDemobDate3: |
| Sub5Employees4: |
| Sub5EmpNo4: |
| Sub5EmpHours4: |
| Sub5EmpEquip4: |
| Sub5EmpUnits4: |
| Sub5EmpYes4: |
| Sub5EmpStandby4: |
| Sub5EmpMobDate4: |
| Sub5EmpDemobDate4: |
| Sub5Materials1: |
| Sub5Quantity1: |
| Sub5EquipMobDemob1: |
| Sub5Materials2: |
| Sub5Quantity2: |
| Sub5EquipMobDemob2: |
| Sub5Materials3: |
| Sub5Quantity3: |
| Sub5EquipMobDemob3: |
| WorkBySubcontractor5: |
| Subcontractor6: |
| Sub6Employees1: |
| Sub6EmpNo1: |
| Sub6EmpHours1: |
| Sub6EmpEquip1: |
| Sub6EmpUnits1: |
| Sub6EmpYes1: |
| Sub6EmpStandby1: |
| Sub6EmpMobDate1: |
| Sub6EmpDemobDate1: |
| Sub6Employees2: |
| Sub6EmpNo2: |
| Sub6EmpHours2: |
| Sub6EmpEquip2: |
| Sub6EmpUnits2: |
| Sub6EmpYes2: |
| Sub6EmpStandby2: |
| Sub6EmpMobDate2: |
| Sub6EmpDemobDate2: |
| Sub6Employees3: |
| Sub6EmpNo3: |
| Sub6EmpHours3: |
| Sub6EmpEquip3: |
| Sub6EmpUnits3: |
| Sub6EmpYes3: |
| Sub6EmpStandby3: |
| Sub6EmpMobDate3: |
| Sub6EmpDemobDate3: |
| Sub6Employees4: |
| Sub6EmpNo4: |
| Sub6EmpHours4: |
| Sub6EmpEquip4: |
| Sub6EmpUnits4: |
| Sub6EmpYes4: |
| Sub6EmpStandby4: |
| Sub6EmpMobDate4: |
| Sub6EmpDemobDate4: |
| Sub6Materials1: |
| Sub6Quantity1: |
| Sub6EquipMobDemob1: |
| Sub6Materials2: |
| Sub6Quantity2: |
| Sub6EquipMobDemob2: |
| Sub6Materials3: |
| Sub6Quantity3: |
| Sub6EquipMobDemob3: |
| WorkBySubcontractor6: |
| MilestoneObeservations: |
| DescriptionWorkMonitored: |
| BreakdownLocation: |
| BreakdownLabor: |
| BreakdownEquip: |
| BreakdownMaterial: |
| BreakdownProdRates: |
| StatusGovFurnished: |
| SafetyAccidents: |
| SafetyIncidents: |
| SafetyFirstAid: |
| SafetyOther: |
| Difficulties: |
| Developments: |
| Deficiencies: |
| OtherComments: |
| AdditionalComments: |