B08_140P5122R0007_Attch_0010_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0001.pdf
PDF 208 KB Posted
- Solicitation number
- 140P5122R0007
About this file
This document contains questions and answers related to a solicitation for site improvements and exterior lighting installations at the Martin Luther King Jr National Historic Site. The work includes demolishing and replacing concrete and brick pavers, installing concrete bases and footings for new light poles, removing non-compliant electrical systems and installing new conduit, wiring, light fixtures, panels, and other electrical components. Questions addressed specification details such as treatment of in-ground plavers, joint spacing for replacement concrete, submittal requirements for brick pavers, as-built drawings, whether all materials must be removed and replaced, pedestal heights, panel replacements, enclosure ratings for control panels, additional spider boxes needed, and whether ground rods and conductor insulation are required. The solicitation is issued by the National Park Service Southeast Region for exterior lighting and site work at the MLK historic site.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment 0001; RFQ # 140P5122R0007 Attachment 0010
Provide Site Improvements and Exterior Lighting Improvements Martin Luther King Jr National
Historic Site Solicitation # 140P5122R0007
Questions and Answers
Question 1. Is There A Specific Procedure That Needs To Be Followed And/Or Required For Documenting & Storage Of ln Ground Plaques?
Answer: Yes, area should be protected and cover to prevent any damage to the plaques. No intrusive methods (screws, nailing, etc.).
Question 2. Is Joint Spacing Of New Replacement Concrete To Be Identical To Any Torn Out Concrete? If Not, What Spacing Will Be Required?
Answer: Yes, as much as possible.
Question 3. Will There Be A Required Submittal For Brick Paving? If Not, Will There Be A Manufacturer Specific Paver Provided?
Answer: Yes, the park would like to replace the pavers as close as possible. Park will request submittals to approve the best compatible material.
Question 4. Would you please provide any and all As-Builts of the Parking and Visitor Center lighting system that was constructed?
Answer: a. Yes.
Question 5. Should the bid bond amount be the actual amount of the bid or the limit of the project?
Answer: Bid bond is not required.
Question 6. Does the contractor have discretion to determine what materials, i.e.
concrete/brick pavers, pole bases, conduit, or conductors to remove and replace or must ALL be removed and replaced?
Answer: Contractor shall follow the specification on construction documents, any deviations should be consulted with the CO and the park.
Question 7. In detail E2.1 is the conduit located under the brick pavers or concrete pavers?
Answer: Under brick pavers.
Question 8. Would you please provide the names, contact details, and area of responsibility of each person administering or assuring the quality of work performance on the project?
Answer: Yes, at contract award.
Question 9. Would you please provide a calendar of the national holidays the Park Service recognizes, and dates of special events scheduled to be held at the Park during the period of performance?
Answer: All the federal holidays applied:
Memorial Day – Monday, May 30, 2022 Juneteenth (observed) – Friday, June 18, 2022 Juneteenth – Saturday, June 19, 2022 Independence Day – Monday, July 4, 2022 Labor Day – Monday, September 5, 2022 Columbus Day – Monday, October 10, 2022 Veterans Day – Friday, November 11, 2022 Thanksgiving Day – Thursday, November 24, 2022 Christmas Day – Sunday, December 25, 2022 Christmas Day (observed) – Monday, December 26, 2022 New Year’s Eve (observed) – Friday, December 31, 2022
Question 10. What is the pedestal heights for the new power pedestals? Part number does not specify, and drawings call for height to be determined by contracting officer (Detail 4/E1.1)
Answer: The standard minimum height is 6” plus the size of the box on top of that. Any other size must specified.
Question 11. Is Panel LC just replacing an existing panel like for like in the current location?
Answer: Existing Panel ‘LC’ is being replaced with a new 225A Frame panel with 42-poles, and will be relabeled as ‘LC’. Contractor to confirm where Panel ‘LC’s main feeder comes from, and the size of that wire. Update for the record set.
Question 12. Are the lighting control panels to be nema4x to match the existing panel near booth?
Answer: Yes, for the Lighting Control Panel ‘LCP1’ located adjacent to the Booth, enclosure shall be NEMA 4X per detail 1/E1.0. Lighting Control Panel ‘LCP2’ located indoors only needs to be
NEMA 1.
Question 13. Are we to provide any additional spider boxes or just one per location shown on plans?
Answer: Only one Spiderbox is required, it will be stored on property and located at either location for special events by NPS.
Question 14. Are we to reuse the existing light pole bases and install new poles and heads at each location or are we to include new bases at each location?
Answer: Yes existing pole bases can be reused however if closer inspection reveals damage/cracks then we would recommend them being replaced. Also, we do not know the condition of the underground conduit so there may be issues that only a new concrete base can fix.
Question 15. Are we to install new 3/4" x 10' grd rods at each pole location or to assume these are existing?
Answer: For new poles yes, for existing poles during a visual inspection it was not obvious that they had ground rods but used the internal anchors. This is acceptable.
Question 16. For the new wiring installed, are the conductors to be xhhw insulation or thhn insulation?
Answer: For interior wiring use THWN/THHN, for underground THWN/XHHW per NPS Electrical Guidelines.