Sol_140P5122R0007_Amd_0003.pdf

PDF 84 KB Posted

Attached to
Provide Site Improvements and Exterior Lighting Im
Solicitation number
140P5122R0007
Issued by

About this file

This is an amendment to a solicitation providing additional site visit information and as-built documents for a project to address site improvements, exterior lighting installation, demolition and replacement of concrete paving, brick pavers and vegetation at the Martin Luther King Jr. Memorial in Atlanta, Georgia. The National Park Service Southeast Region seeks to remove non-code compliant and inoperable existing electrical installations and systems, and install new conduit, wiring, light fixtures, receptacles and electrical components. Bidders must acknowledge receipt of this amendment by the specified deadline of May 5, 2022. The period of performance for the work is from May 31, 2022 to January 30, 2023.

View the file

Other files

File Type Posted
Sol_140P5122R0007_Amd_0005.pdf PDF
B08_140P5122R0007_Attch_0022_Additional_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0004.pdf PDF
Sol_140P5122R0007_Amd_0004.pdf PDF
B08_140P5122R0007_Attch_0025_41012A_Parking_As_Built_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0026_41004_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0017_P3_0001_of_0002_1936_Aerial_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0022_41012_Parking_Area_See_p17-18_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0024_41012A_Parking_As_Built_See_p17-18_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0012_Site_Visit_Information_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0023_41012_Parking_Area_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0016_41003_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0014_D45_0712_V_1_of_2_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0019_41010__See_p75_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0027_41004_See_p6_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0015_41001_0001_of_0001_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0021_41010A_Promenade_As_Built_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0018_D31_0138pg_Original_HVAC_Calcs_VC_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0020_41010A_Promenade_As_Built_See_p6_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0011_Updated_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0002.pdf PDF
Sol_140P5122R0007_Amd_0002.pdf PDF
Sol_140P5122R0007_Amd_0001.pdf PDF
A04_0040564583_Attch_0008_Phase_I_and_II_Revised_MALU_Exterior_Lighting_Improvements_0001.pdf PDF
B08_140P5122R0007_Attch_0009_Revived_RFP_MALU_Exterior_Lighting_Improvements_0001.pdf PDF
B08_140P5122R0007_Attch_0010_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0001.pdf PDF
B08_140P5122R0007_Attch_0007_PPQ_MALU_Exterior_Lighting_Improvements.pdf PDF
B08_140P5122R0007_Attch_0005_WDOL_WD_MALU_Exterior_Lighting_Improvements.pdf PDF
A04_0040564583_Attch_0001_Phase_I_and_II_Drawings_MALU_Exterior_Lighting_Improvements.pdf PDF
Sol_140P5122R0007.pdf PDF
B08_140P5122R0007_Attach_0004_Price_Sch_MALU_Exterior_Lighting_Improvements.pdf PDF
A04_0040564583_Attch_0003_Phase_I_and_II_Product_Specs_MALU_Exterior_Lighting_Improvements.pdf PDF
A04_0040564583_Attch_0002_Phase_I_and_II_Product_Specs_MALU_Exterior_Lighting_Improvements.pdf PDF
B08_140P5122R0007_Attch_0006_Site_Visit_Information_MALU_Exterior_Lighting_Improvements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P5122R0007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PSE

Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW

NPS SER EAST MABO

PSE

Atlanta GA 30303-8701 1924 Building 100 Alabama St., SW

NPS SER EAST MABO

05/02/20220003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/01/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to provide site visit information and as-built documents.

Site visit information is provided as attachment 0012.

As-built documents are added as attachments 0014 through 0027 (**Note: Attachment 13

D45_0712 V 2 of 2 MALU Exterior Lighting Improvements is too large to upload in this system. If a copy is required to meet the term per the solicitation, one must be requested by electronic mail (email) to edward_dingle@nps.gov no later than Thursday May 5, 2022

1:00pm ED).

Legacy Doc #: NPS

Period of Performance: 05/31/2022 to 01/30/2023

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Edward Dingle

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .