B08_140P5122R0007_Attch_0007_PPQ_MALU_Exterior_Lighting_Improvements.pdf

PDF 178 KB Posted

Attached to
Provide Site Improvements and Exterior Lighting Im
Solicitation number
140P5122R0007
Issued by

About this file

This document is a past performance questionnaire for a contractor responding to solicitation number 140P5122R0007 from the National Park Service to provide site improvements and exterior lighting at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The project involves demolishing and replacing concrete paving and brick pavers in disturbed areas, installing concrete footings and bases for light poles, erecting barricades and erosion control measures, protecting trees, and performing general cleanup. It also consists of removing non-code compliant and inoperable existing electrical installations and systems along with other components, and installing new conduit, wiring, light fixtures, receptacles, sensors, electrical panels, a timeclock, and other lighting and electrical between John Wesley Dobbs Avenue and the Visitors Center. The past performance questionnaire requests information about the contractor's performance on a previous relevant contract and ratings on performance, timeliness, quality of work, and overall performance using defined evaluation criteria. It must be completed and submitted with the proposal in response to the solicitation by the stated deadline.

View the file

Other files

File Type Posted
Sol_140P5122R0007_Amd_0005.pdf PDF
B08_140P5122R0007_Attch_0022_Additional_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0004.pdf PDF
Sol_140P5122R0007_Amd_0004.pdf PDF
B08_140P5122R0007_Attch_0025_41012A_Parking_As_Built_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0026_41004_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0017_P3_0001_of_0002_1936_Aerial_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0022_41012_Parking_Area_See_p17-18_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0024_41012A_Parking_As_Built_See_p17-18_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0012_Site_Visit_Information_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0023_41012_Parking_Area_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
Sol_140P5122R0007_Amd_0003.pdf PDF
B08_140P5122R0007_Attch_0016_41003_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0014_D45_0712_V_1_of_2_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0019_41010__See_p75_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0027_41004_See_p6_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0015_41001_0001_of_0001_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0021_41010A_Promenade_As_Built_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0018_D31_0138pg_Original_HVAC_Calcs_VC_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0020_41010A_Promenade_As_Built_See_p6_MALU_Exterior_Lighting_Improvements_0003.pdf PDF
B08_140P5122R0007_Attch_0011_Updated_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0002.pdf PDF
Sol_140P5122R0007_Amd_0002.pdf PDF
Sol_140P5122R0007_Amd_0001.pdf PDF
A04_0040564583_Attch_0008_Phase_I_and_II_Revised_MALU_Exterior_Lighting_Improvements_0001.pdf PDF
B08_140P5122R0007_Attch_0009_Revived_RFP_MALU_Exterior_Lighting_Improvements_0001.pdf PDF
B08_140P5122R0007_Attch_0010_Questions_and_Answers_MALU_Exterior_Lighting_Improvements_0001.pdf PDF
B08_140P5122R0007_Attch_0005_WDOL_WD_MALU_Exterior_Lighting_Improvements.pdf PDF
A04_0040564583_Attch_0001_Phase_I_and_II_Drawings_MALU_Exterior_Lighting_Improvements.pdf PDF
Sol_140P5122R0007.pdf PDF
B08_140P5122R0007_Attach_0004_Price_Sch_MALU_Exterior_Lighting_Improvements.pdf PDF
A04_0040564583_Attch_0003_Phase_I_and_II_Product_Specs_MALU_Exterior_Lighting_Improvements.pdf PDF
A04_0040564583_Attch_0002_Phase_I_and_II_Product_Specs_MALU_Exterior_Lighting_Improvements.pdf PDF
B08_140P5122R0007_Attch_0006_Site_Visit_Information_MALU_Exterior_Lighting_Improvements.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ #140P5122R0007 - Attachment 0007

PAST PERFORMANCE QUESTIONNAIRE

Solicitation#140P5122R0007 Please complete this Questionnaire and Submit with your Proposal

We are currently in the process of preparing our proposal for the National Park Service, Interior Region 2 South Atlantic Gulf, Solicitation Number: 140P5122R0007 for Exterior Lighting Improvements at Martin Luther King, Jr. National Historical Park Atlanta, Georgia. As part of our proposal, we have listed you as a reference on our performance for this type of service with your agency under the previous/current contract listed below. Your input on our performance is therefore requested.

Please complete this Questionnaire and submit with your proposal to: edward_dingle@nps.gov

Questionnaire is due to prior to the closing of RFP #140P5122R0007.

Alternate POC name:

Alternate POC phone number:

Alternate POC e-mail address:

Thank you.

NAME OF OFFEROR:

Phone: ________________________ Fax: _____________________

E-Mail: _______________________

I. Current or Historical Contract Information

CONTRACT REFERENCED:

1. Contract or Identifying Number:

2. Contract Value:

3. Period of Performance:

4. Brief description of items provided:

5. Name of Person Completing Questionnaire:

Agency/Company:

Title: Phone:

E-mail:

mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20edward_dingle@nps.gov mailto:Please%20complete%20this%20Questionnaire%20and%20e-mail%20to%20Contracting%20Officer,%20e-mail:%20edward_dingle@nps.gov mailto:edward_dingle@nps.gov

II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.

Evaluation Definitions –

The following definitions should be used in the assessment of Contractor performance.

EXCEPTIONAL

Performance EXCEEDS MOST contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns.

VERY GOOD

Performance EXCEEDS SOME contractual requirements. The performance of areas being assessed was accomplished with few minor issues or concerns, for which the Contractor’s corrective actions were highly effective.

SATISFACTORY

Performance MEETS contractual requirements. The performance of the areas being assessed contains minor issues or concerns, for which corrective actions taken by the Contractor were effective.

MARGINAL

Performance MEETS SOME contractual requirements. The performance of the areas being assessed includes significant problems, issues, or concerns for which corrective actions taken by the Contractor were only somewhat effective.

UNSATISFACTORY

Performance DOES NOT MEET contractual requirement. The performance of the areas being assessed includes serious problems, issues, or concerns for which the Contractor’s corrective actions were ineffective.

NOT APPLICABLE (N/A) Performance information not recent or relevant as defined in the Solicitation. Unable to provide assessment.

Past Performance Evaluation

Question 1. Performance

What is your assessment of the Contractor’s ability to meet your requirements?

Exceptional Very Good Satisfactory Marginal Unsatisfactory N/A

Performance

Comments, if any.

Questions 2 and 3. Timeliness

What is your assessment of the Contractor’s ability to provide products in a timely manner?

Timeliness

Ability to Resolve Timeliness Problems

Question 4. Quality of Work

What is your assessment of the Contractor’s ability to meet requirements of tasks and the overall quality of the work?

Quality of Shipments

Question 5. Overall Rating of Contractor’s performance

What is your overall rating of Contractor’s performance (requirements, schedule, and price) on contract being assessed?

Exceptional Very Good Satisfactory Marginal Unsatisfactory

General Comments:

PAST PERFORMANCE QUESTIONNAIRE
I. Current or Historical Contract Information CONTRACT REFERENCED:
II. EVALUATION. Please rate the Contractor utilizing the guide below. Explanatory narratives for as many responses as possible would be appreciated. These narratives need not be lengthy, just detailed. Attach additional pages if more space is needed.
Past Performance Evaluation Question 1. Performance
Questions 2 and 3. Timeliness
Question 4. Quality of Work
Question 5. Overall Rating of Contractor’s performance
General Comments:

File details come from the government source that posted it. Updated .