This is a pricing schedule for a Fiscal Year 2026 hazardous tree management contract titled "Implement Towpath Hazardous Tree Management Plan - 2026." The contract uses a firm fixed price structure with two base tasks and eight optional inspection tasks.
Base Task 1 (Work Package 1, CLIN 10) requires removal of 131 trees, pruning of 39 trees, and grinding of 2 stumps. Base Task 2 (Work Package 2, CLIN 20) requires removal of 117 trees, pruning of 22 trees, and grinding of 3 stumps. Both base tasks are priced as firm fixed price line items with a total price line for all locations highlighted in yellow.
The eight optional tasks (CLINs 30, 40, 50, 60, 70/80, 90, 100, 110) consist of hazard tree inspections across designated areas. Optional Task 1 covers Point of Rocks to Little Catoctin (4.31 miles); Optional Task 2 covers Weverton to Lock 34 (3.47 miles); Optional Task 3 covers Cohill to Lockhouse 56 (5.51 miles); Optional Task 4 covers Lockhouse 56 to Lock 59 (10.38 miles); Optional Tasks 5A/5B cover Lock 59 to Paw Paw (9.60 miles); Optional Task 6 covers Spring Gap to Evitts Creek (5.63 miles); Optional Task 7 involves inspection of 22 cyclic maintenance areas; and Optional Task 8 involves inspection of 25 trails parkwide. Each optional inspection task requires labor by an ISA Board Certified Master Arborist with estimated hours provided by the National Park Service (NPS), vendor-provided wage rates, and a material/equipment not-to-exceed amount of $500. The schedule requires vendors to provide their own wage rates and includes a grand total line combining all base and option CLINs.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY26
QUANTITY UNIT AMOUNT
1 EA
1 EA
Labor
CLIN
Wage Rate (Vendor Provides)
14.1
14.2
14.3
14.4 Total Lump Sum For Option Task 1
Labor
CLIN
Wage Rate (Vendor Provides)
16.1
16.2
16.3
16.4 Total Lump Sum For Option Task 2
Labor
CLIN
Wage Rate (Vendor Provides)
18.1 18.2
18.3
18.4 Total Lump Sum For Option Task 3
Labor
CLIN
Wage Rate (Vendor Provides)
20.1
20.2
20.3
20.4 Total Lump Sum For Option Task 4 -$
Labor Category Estimated Hours (NPS provides) Total Labor NTE
ISA Board Certified Master Arborist 96 $ -
OPTION TASK 4 / Inspection: Inspect Lockhouse 56 - Lock 59, Mileposts 136.21 - 146.59
a. Total 10.38 Miles
Material/Equipment (NTE $500)
Labor Category
Labor Category
Material/Equipment (NTE $500)
OPTION TASK 2 / Inspection: Inspect Weverton – Lock 34, Mileposts 58.1 - 61.57
a. Total 3.47 Miles
Estimated Hours (NPS provides) Total Labor NTE
ISA Board Certified Master Arborist 56 $ -
Material/Equipment (NTE $500)
Estimated Hours (NPS provides)
OPTION TASK 3 / Inspection: Inspect Cohill – Lockhouse 56, Mileposts 130.7 - 136.21
a. Total 5.51 Miles
ISA Board Certified Master Arborist
Total Labor NTE
OPTION TASK 1 / Inspection: Inspect Point of Rocks – Little Catoctin, Mileposts 48.2 - 52.51
a. Total 4.31 Miles
Labor Category
ISA Board Certified Master Arborist
Material/Equipment (NTE $500)
Total Price for all locations:
Total Labor NTE
Estimated Hours (NPS provides)
The below Optional Tasks are for Hazard Tree Inspections throughout the designated areas.
Attachment 9 - Price schedule
LINE ITEM DESCRIPTION RATE
10 Firm fixed Price
Base Task 1: Work Package 1
a. Removal: Remove 131 tree(s) identified in Enclosure 1.
b. Pruning: Prune 39 tree(s) identified in Enclosure 1.
c. Grinding: Grind 2 existing stump(s) identified in Enclosure 1.
Firm fixed Price
Work Item: Implement Towpath Hazardous Tree Management Plan - 2026
Base Task 2: Work Package 2
a. Removal: Remove 117 tree(s) identified in Enclosure 1.
b. Pruning: Prune 22 tree(s) identified in Enclosure 1.
c. Grinding: Grind 3 existing stump(s) identified in Enclosure 1.
Labor
CLIN
Wage Rate (Vendor Provides)
22.1
22.2
22.3
22.4 Total Lump Sum For Option Task 5
Labor
CLIN
Wage Rate (Vendor Provides)
24.1
24.2
24.3
24.4 Total Lump Sum For Option Task 6
Labor
CLIN
Wage Rate (Vendor Provides)
24.1 24.2 24.3 24.4
Total Lump Sum For Option Task 7
Labor
CLIN
Wage Rate (Vendor Provides)
24.1 24.2 24.3 24.4
Total Lump Sum For Option Task 8
Total Price for all Options
Total Labor NTE
Material/Equipment (NTE $500)
Labor Category Estimated Hours (NPS provides) Total Labor NTE
Material/Equipment (NTE $500)
Grand Total with base CLINs and All Option CLINs:
ISA Board Certified Master Arborist 80 $ -
ISA Board Certified Master Arborist 120 $ -
OPTION TASK 8 / Inspection: Inspect Trail Parkwide Areas
a. Inspect 25 Trails Parkwide (Areas provided in SOW)
Labor Category Estimated Hours (NPS provides)
Labor Category Estimated Hours (NPS provides) Total Labor NTE
ISA Board Certified Master Arborist 56 $ -
OPTION TASK 6 / Inspection: Inspect Spring Gap - Evitts Creek, Mileposts 173.37 - 179
a. Total 5.63 Miles
OPTION TASK 7 / Inspection: Inspect Two Year Cyclic Maintenance Areas
a. Inspect 22 Cyclic Maintenance Areas (Areas provided in SOW)
Material/Equipment (NTE $500)
ISA Board Certified Master Arborist 88 $ -
70 & 80
OPTION TASK 5A and 5B / Inspection: Inspect Lock 59 – Paw Paw, Mileposts 146.5 – 156.1
a. Total 9.60 Miles
Material/Equipment (NTE $500)
Labor Category Estimated Hours (NPS provides) Total Labor NTE